This document is a comments reply sheet from BGR Energy Systems Limited regarding a consultation for a thermal power station project. It includes details of the client, documents under review, and a table with comments from the client (APGENCO / DCPL) and replies from BGR Energy. The first comment requests a reference to the P&ID and piping layout be added to the GA drawing for cast carbon steel gate valves, and BGR's reply explains that showing the piping layout number is not possible or a good practice due to the number of valves and layouts.
This document is a comments reply sheet from BGR Energy Systems Limited regarding a consultation for a thermal power station project. It includes details of the client, documents under review, and a table with comments from the client (APGENCO / DCPL) and replies from BGR Energy. The first comment requests a reference to the P&ID and piping layout be added to the GA drawing for cast carbon steel gate valves, and BGR's reply explains that showing the piping layout number is not possible or a good practice due to the number of valves and layouts.
This document is a comments reply sheet from BGR Energy Systems Limited regarding a consultation for a thermal power station project. It includes details of the client, documents under review, and a table with comments from the client (APGENCO / DCPL) and replies from BGR Energy. The first comment requests a reference to the P&ID and piping layout be added to the GA drawing for cast carbon steel gate valves, and BGR's reply explains that showing the piping layout number is not possible or a good practice due to the number of valves and layouts.
Please note that the each system P&ID having so many valves and the same is located in varies piping layouts. 1 Reference P&ID and Piping Layout shall be provided In such a case is not possible to show the piping layout number in the valve GA and also this is not in good Engineering practice. Hence kindly approve the same.