Note: It is advisable to ask your electrical contractor to help you complete this section. You can also check the information
supplied by the appliance manufacturers. The data provided will be used as the basis for the network design.
Any omissions could result in delay and / or additional costs.
Number of electrical phases required. (please tick ) Single Phase Three Phase Split Phase
If any motors, welders or other large switched loads are being used please complete page 2 of this application.
You must complete all information on this application. Without it we will be unable to
proceed with your request and provide you with a prompt quotation for the work you
require.
My Connection Reference: Com /
When welders, motors or other sources of local energy resources i.e. Heat Pumps start they can have an effect on your and other
people's connection. Remember to consider refrigeration, air conditioning equipment, heating, fuel and heat pumps.
Please provide information on your motors with a rating of greater than 0.75kW:
(Note: All plug appliances greater than 13Amps should be included below):
Location plan
Please supply a location plan which identifies the proposed site for the new connection. A suggested scale for the location plan is
1:500. The site location should be highlighted on the plan. Suitable location plans can be obtained by using an A-Z of street maps or
through websites such as :
www.multimap.com
www.streetmap.co.uk
www.maps.google.co.uk
www.ordnancesurvey.co.uk