You are on page 1of 13

RP MAPPALA INCORPORATED

ADDRESS: PUROK 1, LIBERTAD, ISABEL, LEYTE


TELEFAX #: (053) 556-8976
Email: rpmi_13@yahoo.com.ph

INSULATION & CLADDING


FROM: FEBRUARY , 2020
TO: PRESENT

ITEM NO. LOCATION DATE TOTAL AREA (m2)

1 HE-J81 (2 MANHOLE) 14-May-20 3.71


2 EXP-J38 19-Jun-20 8.824
3 HE-J61 DUCT FLASHING 9-Jul-20 32.0
4 HE-J61 Dome 1-Aug-20 61.87
5 HE-J83 (2 MANHOLE) 15-Aug-20 3.71
6 HE-J61 TEE & EXPANSION JOINT 27-Aug-20 46.052
7 HE-J83 DOME AND SHELL 15-Aug-20 43.5
TOTAL AREA 199.67

PREPARED BY: JEKRIS M. IGLOPAS


RPMI-FIELD ENGINEER
RP MAPPALA INCORPORATED
PUROK 1, BRGY. LIBERTAD, ISABEL, LEYTE
EMAIL: rpmi_13@yahoo.com.ph
TELEFAX: (053) 556 9876

INSULATION & CLADDING


HE-J81 (2 MANHOLE)
DATE: 5/14/2020
SUMMARY:
Area Width Height Diameter Circumference No. of Pcs Total Area
1 1m 2 1.57 m2
2 .230 mm 1m 3.1416 2 1.45 m2
3 .200 mm 1.2 m A3 – A1 = .345 m 2 .69 m2
Total Area 3.71 m2

A3
A2

A1
.230mm

1m

``
.200mm

PREPARED BY: CHECKED BY: REVIEWED BY:


JEKRIS M. IGLOPAS ISIDRO M. GENERALE FILEMON D. DANUCO
QA/QC ENGINEER PROJECT SUPERVISOR OPERATION MANAGER
RECEIVED BY: APPROVED BY:
____________________________ TIFFANY MORGAN L. BULANON
PASAR – CONSTRUCTION LEADER PASAR – TEAM LEADER
RP MAPPALA INCORPORATED
PUROK 1, BRGY. LIBERTAD, ISABEL, LEYTE
EMAIL: rpmi_13@yahoo.com.ph
TELEFAX: (053) 556 9876

INSULATION & CLADDING


HE-J83 (2 MANHOLE)
DATE: 5/14/2020
SUMMARY:
Area Width Height Diameter Circumference No. of Pcs Total Area
1 1m 2 1.57 m2
2 .230 mm 1m 3.1416 2 1.45 m2
3 .200 mm 1.2 m A3 – A1 = .345 m 2 .69 m2
Total Area 3.71 m2

A3
A2

A1
.230mm

1m

.200mm

PREPARED BY: CHECKED BY: REVIEWED BY:


JEKRIS M. IGLOPAS ISIDRO M. GENERALE FILEMON D. DANUCO
QA/QC ENGINEER PROJECT SUPERVISOR OPERATION MANAGER
RECEIVED BY: APPROVED BY:
____________________________ TIFFANY MORGAN L. BULANON
PASAR – CONSTRUCTION LEADER PASAR – TEAM LEADER
RP MAPPALA INCORPORATED
PUROK 1, BRGY. LIBERTAD, ISABEL, LEYTE
EMAIL: rpmi_13@yahoo.com.ph
TELEFAX: (053) 556 9876

INSULATION & CLADDING


HE-J69 NORTH SIDE
DATE:
SUMMARY:

Area Length Width Height No. of Pcs Total Area


A1 1.5 1.2 - 8 14.4
A2 1.5 .2 8 4.8
A3 1.2 .2 8 3.84
A4 1.7 1.4 Area 4-Area1=.58m2 8 4.64
Total Area 27.68 m2

A3
A2
A1

A4

PREPARED BY: CHECKED BY: REVIEWED BY:


JEKRIS M. IGLOPAS ISIDRO M. GENERALE FILEMON D. DANUCO
QA/QC ENGINEER PROJECT SUPERVISOR OPERATION MANAGER
RECEIVED BY: APPROVED BY:
____________________________ TIFFANY MORGAN L. BULANON
PASAR – CONSTRUCTION LEADER PASAR – TEAM LEADER
RP MAPPALA INCORPORATED
PUROK 1, BRGY. LIBERTAD, ISABEL, LEYTE
EMAIL: rpmi_13@yahoo.com.ph
TELEFAX: (053) 556 9876

INSULATION & CLADDING


HE-J69 NORTH SIDE

PREPARED BY: CHECKED BY: REVIEWED BY:


JEKRIS M. IGLOPAS ISIDRO M. GENERALE FILEMON D. DANUCO
QA/QC ENGINEER PROJECT SUPERVISOR OPERATION MANAGER
RECEIVED BY: APPROVED BY:
____________________________ TIFFANY MORGAN L. BULANON
PASAR – CONSTRUCTION LEADER PASAR – TEAM LEADER
RP MAPPALA INCORPORATED
PUROK 1, BRGY. LIBERTAD, ISABEL, LEYTE
EMAIL: rpmi_13@yahoo.com.ph
TELEFAX: (053) 556 9876

INSULATION & CLADDING


HE-J61 DUCT FLASHING
DATE: JULY 9, 2020
SUMMARY:

Area Length Width Circumference Total Area


A1 1.22 2.480 3.0256
A2 1.22 .610 A= (.744)3 2.269
A3 .450 1.240 A = (.558)3 1.674
A4 .160 1.240 A = (.1984)3 .595
A5 1.22 9 10.98
A5 1.22 9 10.98
A6 .200 1.22 2.44
Total Area 31.96 m2

1.240m

.160m
2.480m

.450m

.160m

PREPARED BY: CHECKED BY: REVIEWED BY:


JEKRIS M. IGLOPAS ISIDRO M. GENERALE FILEMON D. DANUCO
QA/QC ENGINEER PROJECT SUPERVISOR OPERATION MANAGER
RECEIVED BY: APPROVED BY:
____________________________ TIFFANY MORGAN L. BULANON
PASAR – CONSTRUCTION LEADER PASAR – TEAM LEADER
RP MAPPALA INCORPORATED
PUROK 1, BRGY. LIBERTAD, ISABEL, LEYTE
EMAIL: rpmi_13@yahoo.com.ph
TELEFAX: (053) 556 9876

INSULATION & CLADDING


HE-J61 DUCT FLASHING

PREPARED BY: CHECKED BY: REVIEWED BY:


JEKRIS M. IGLOPAS ISIDRO M. GENERALE FILEMON D. DANUCO
QA/QC ENGINEER PROJECT SUPERVISOR OPERATION MANAGER
RECEIVED BY: APPROVED BY:
____________________________ TIFFANY MORGAN L. BULANON
PASAR – CONSTRUCTION LEADER PASAR – TEAM LEADER
RP MAPPALA INCORPORATED
PUROK 1, BRGY. LIBERTAD, ISABEL, LEYTE
EMAIL: rpmi_13@yahoo.com.ph
TELEFAX: (053) 556 9876

INSULATION & CLADDING


EXP-J38
DATE: JUNE 19,2020
SUMMARY:
Location Length Width No. of Pcs Total Area
EXP-J38 3.140 1.22 2 7.662
3.140 .370 1 1.162
Total Area 8.824 m2

PREPARED BY: CHECKED BY: REVIEWED BY:


JEKRIS M. IGLOPAS ISIDRO M. GENERALE FILEMON D. DANUCO
QA/QC ENGINEER PROJECT SUPERVISOR OPERATION MANAGER
RECEIVED BY: APPROVED BY:
____________________________ TIFFANY MORGAN L. BULANON
PASAR – CONSTRUCTION LEADER PASAR – TEAM LEADER
RP MAPPALA INCORPORATED
PUROK 1, BRGY. LIBERTAD, ISABEL, LEYTE
EMAIL: rpmi_13@yahoo.com.ph
TELEFAX: (053) 556 9876

INSULATION & CLADDING


HE-J61
DATE: AUGUST 1,2020
SUMMARY:
Location Length Width Circumference No. of Leaves Total Area

DOME 3.7 .44 38 61.87 m2

.55 .65 10 3.575 m2

TEE 1.22 6.64 3 24.302 m2

Expansion Joint 1.5 1.45 10 21.75 m2


Total Area 111.497

Dome Before

PREPARED BY: CHECKED BY: REVIEWED BY:


JEKRIS M. IGLOPAS ISIDRO M. GENERALE FILEMON D. DANUCO
QA/QC ENGINEER PROJECT SUPERVISOR OPERATION MANAGER
RECEIVED BY: APPROVED BY:
____________________________ TIFFANY MORGAN L. BULANON
PASAR – CONSTRUCTION LEADER PASAR – TEAM LEADER
RP MAPPALA INCORPORATED
PUROK 1, BRGY. LIBERTAD, ISABEL, LEYTE
EMAIL: rpmi_13@yahoo.com.ph
TELEFAX: (053) 556 9876

INSULATION & CLADDING


HE-J61
DATE: AUGUST 1,2020
TEE Before

PREPARED BY: CHECKED BY: REVIEWED BY:


JEKRIS M. IGLOPAS ISIDRO M. GENERALE FILEMON D. DANUCO
QA/QC ENGINEER PROJECT SUPERVISOR OPERATION MANAGER
RECEIVED BY: APPROVED BY:
____________________________ TIFFANY MORGAN L. BULANON
PASAR – CONSTRUCTION LEADER PASAR – TEAM LEADER
RP MAPPALA INCORPORATED
PUROK 1, BRGY. LIBERTAD, ISABEL, LEYTE
EMAIL: rpmi_13@yahoo.com.ph
TELEFAX: (053) 556 9876

INSULATION & CLADDING


HE-J61
DATE: AUGUST 1,2020
DOME After

PREPARED BY: CHECKED BY: REVIEWED BY:


JEKRIS M. IGLOPAS ISIDRO M. GENERALE FILEMON D. DANUCO
QA/QC ENGINEER PROJECT SUPERVISOR OPERATION MANAGER
RECEIVED BY: APPROVED BY:
____________________________ TIFFANY MORGAN L. BULANON
PASAR – CONSTRUCTION LEADER PASAR – TEAM LEADER
RP MAPPALA INCORPORATED
PUROK 1, BRGY. LIBERTAD, ISABEL, LEYTE
EMAIL: rpmi_13@yahoo.com.ph
TELEFAX: (053) 556 9876

INSULATION & CLADDING


HE-J61
DATE: AUGUST 1,2020
TEE After

PREPARED BY: CHECKED BY: REVIEWED BY:


JEKRIS M. IGLOPAS ISIDRO M. GENERALE FILEMON D. DANUCO
QA/QC ENGINEER PROJECT SUPERVISOR OPERATION MANAGER
RECEIVED BY: APPROVED BY:
____________________________ TIFFANY MORGAN L. BULANON
PASAR – CONSTRUCTION LEADER PASAR – TEAM LEADER
RP MAPPALA INCORPORATED
PUROK 1, BRGY. LIBERTAD, ISABEL, LEYTE
EMAIL: rpmi_13@yahoo.com.ph
TELEFAX: (053) 556 9876

PREPARED BY: CHECKED BY: REVIEWED BY:


JEKRIS M. IGLOPAS ISIDRO M. GENERALE FILEMON D. DANUCO
QA/QC ENGINEER PROJECT SUPERVISOR OPERATION MANAGER
RECEIVED BY: APPROVED BY:
____________________________ TIFFANY MORGAN L. BULANON
PASAR – CONSTRUCTION LEADER PASAR – TEAM LEADER