You are on page 1of 1

PROCUREMENT AND CONSTRUCTION OF 1X300

MW THERMAL POWER PLANT

INSPECTION REPORT FOR BRICKWORK


Form No. C-011

Drawing No.: Report No.:

Location: Date:

Sr. No. Description Yes No N/A

Check for thickness of DPC (50mm) and mix proportion (1:1.5:3) with Water Proof
1
Admixture

Wetting of Bricks done


2

Surface preparation etc. done


3

Check for Cement-Mortar mix proportion


4

Staging and Scaffolding done


5

Hacking of Concrete surface


6

Check for Bond/Closures and thickness of joints


7

Check for thickness of Brick wall with respect to drawing


8

Line, Level and Plumb found OK


9

Embedment if any
10

Check for RCC bonds, Reinforcement (if applicable)


11

Curing done
12

Remarks:

Sub Contractor Checked & Approved by Owner

Signature
Name
Date