You are on page 1of 10

Rainas Municipality

Office of the Municipal Executive


Tinpiple, Lamjung, Gandaki Province, Nepal
AOC
Name of Project :- Emergency maintenance of Rainastar sinchai ayojana
Location:- Rainas Municipality
S.N. Description of work Quantity units Rate Amount Remarks
1
Earthwork in Excavation for
landside clearance 473.62 m3 650.96 308,307.68
2 landslide clearance using
excavator (includes making of
approach road) 600.00 m3 54.82 32,892.00
3 Stone Masonary(1:4) 2.64 m3 13,798.99 36,429.33
4 PCC(1:2:4) 0.19 m3 12,772.10 2,426.70
5 Soling 0.29 m3 3,310.20 959.96
6 E/w in excation(for gabion) 5.70 m3 650.96 3,710.47
7 Site clearance 9.00 m2 40.69 366.21
8 Filling in Gabion Box 45.00 m3 3,046.10 137,074.50
9 Plaster work(syauli) 16.14 m2 387.85 6,259.90
10 Gabion Crate(2*1*1) 55.00 m2 310.75 17,091.25
Total 545,518.00

Prepared By: Checked By: Approved By:


Sudha Thapa/Lakshman Khanal Er.Bhim Prasad Dahal Ramchandra Adhikari
Rainas Municipality
Office of the Municipal Executive
Tinpiple, Lamjung,Gandaki Province, Nepal
Measurement Book
Name of Project :- Emergency maintenance of Rainastar sinchai ayojana
Location:- Rainas Municipality
S.N. Description of work Nos. length(m) Breadth(m) Height(m) Quantity units Remarks
1 Earthwork in Excavation for
landside clearance 473.62 m3
Gangate 1 10.00 1.80 1.50 27.00 m3
Khola+Naubise pul 1 25.00 1.60 1.40 56.00 m3
Hamal Garden 1 12.00 1.80 1.50 32.40 m3
Jalkini 1 14.00 1.80 1.40 35.28 m3
Kathbote 1 15.00 1.80 1.30 35.10 m3
Borangkhola aama samuha pul 1 9.00 1.80 1.50 24.30 m3
kandel pahiro 1 30.00 1.80 1.30 70.20 m3
Akala+Taari 1 19.00 1.80 1.70 58.14 m3
Mijargaun 1 14.00 1.80 1.50 37.80 m3
Malla D1 1 16.00 1.80 1.50 43.20 m3
Malla D2 1 14.00 1.50 1.20 25.20 m3
sim khola+kadepani gate 2 7.00 1.50 1.00 21.00 m3
Sakha no 10 1 8.00 1.00 1.00 8.00 m3
2 landslide clearance using excavator
(includes making of approach road) 1 75.00 4.00 2.00 600.00 m3

3 Stone Masonary(1:4) 2.64 m3


1 3.20 0.60 1.00 1.92 m3
2 3.00 0.60 0.20 0.72 m3
4 PCC(1:2:4) 0.19 m3
1 3.20 0.60 0.10 0.19 m3
5 Soling 0.29 m3
1 3.20 0.60 0.15 0.29 m3

6 E/w in excation(for gabion) 5.70 m3


e/w in excavation(at syauli) 1 6.00 1.30 0.50 3.90 m3
e/w in excavation(at satbise) 1 9.00 0.20 1.00 1.80 m3
9.00 m2
7 Site clearance 1 9.00 1.00 9.00 m2

8 Filling in Gabion Box 45.00 m3


Gabion (khahare khola) 2 2.00 1.00 1.00 4.00 m3
Gabion (Regmi khola) 11 2.00 1.00 1.00 22.00 m3
Gabion box(syauli) 10 1.50 1.00 1.00 15.00 m3
2 2.00 1.00 1.00 4.00 m3
9 Plaster work(syauli) 16.14 m2
1 9.70 1.00 9.70 m2
1 9.20 0.70 6.44 m2
10 Gabion Crate(2*1*1) 55.00 m2
5 11.00 1.00 55.00 m2

Prepared By: Checked By: Approved By:


Sudha Thapa/Lakshman Khanal Er.Bhim Prasad Dahal Ramchandra Adhikari
Norms no 7,2,Gha Norms Unit 1.00 CU.M.
Items Description : P.C.C. work 1:2:4 in Foundation,Wall including 30 m lead

Description Quantity Unit Rate Amount


Skilled 1.00 md 1090.00 1090.00
Labour
Unskilled 4.00 md 790.00 3160.00
Cement 0.32 M.T 19210.00 6147.20
Materials Aggregate 0.85 Cu.m. 1815.00 1542.75
Sand 0.445 Cu.m. 1870.00 832.15
Total 12772.10
Rate per unit 12772.10

Norms no 6,1,2 Norms Unit 1.00 CU.M.


Items Description : Stone masonry work in cement mortar 1:4 including 10 m lead
and 5 m lift
Description Quantity Unit Rate Amount
Skilled 1.50 md 1090.00 1635.00
Labour
Unskilled 8.00 md 790.00 6320.00
Stone 1.10 Cu.m. 1771.00 1948.10
Materials Cement 0.159 M.T. 19210.00 3054.39
Sand 0.45 Cu.m. 1870.00 841.50
Total 13798.99
Rate per unit 13798.99

Norms no 2,2 Norms Unit 1.00 CU.M.


Items Description : Earthwork in excavation in boulder mixed soil including 10 m
lead and 1.5m lift
Description Quantity Unit Rate Amount
Skilled
Labour
Unskilled 0.80 md 790.00 632.00

Tools and plants @ 18.96


3 % of labour cost
Total 650.96
Rate per unit 650.96

Norms no 16,11 Norms Unit 1.00 Cu.m.


Items Description : Filling of stones in gabion crates

Description Quantity Unit Rate Amount


Labour Skilled 0.50 md 1090.00 545.00
Unskilled 0.70 md 790.00 553.00
Materials Stone 1.100 Cu.m. 1771.00 1948.10
Total 3046.10
Rate per unit 3046.10

Norms no 1-1.5(a),1-1.5(b),and 1-1.6 Norms Unit 1.00 Sq.m.


Items Description : Site Clearance : Clearing and grubbing including the cutting of
trees (only if necessary) having girth of less than 30 cm when
measured at 1 m
Description above the ground.
Quantity Unit Rate Amount
Skilled
Labour
Unskilled 0.05 md 790.00 39.50

Tools and plants @ 1.19


3 % of labour cost
Total 40.69
Rate per unit 40.69
Analysis of Rates
Item No :-
Description :- Gabion ( 8 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (8 gauge) at bhotewodar 85.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13 % VAT 11.05
Total per kg 96.55

Item No :-
Description :- Gabion ( 10 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (10 gauge) at Bhotewodar 85.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13 % VAT 11.05
Total per kg 96.55

Item No :-
Description :- Gabion (12 gauge) supply
Unit:- 1 kg
Rate of 1 kg. Gabion (12 gauge) at Bhotewodar 86.00
transportation from bhoteodar to
Nepaldanda by vehicle 0.114 0.11
transportation from Nepaldanda to
site by vehicle 0.15 0.15
Load/Unload 0.24 0.24
13% VAT 11.18
97.68

b. Box Size-2x1x1 44-1-Bii/44-2-i/45


Rainas Municipality
Office of the Municipal Executive
Tinpiple, Lamjung, 4 No. Province, Nepal
Detailed Estimate
Name of Project :- Toilet and Masonary wall
Location: Rainas Municipality
S.N. Description of work Nos. length(m) Breadth(m) Height(m) Quantity units Remarks
1 Earthwork in Excavation 8.0 m3
Long wall 2 3.1 0.9 0.91 5.1 m3
Short wall 2 1.8 0.9 0.91 2.9 m3
2 Stone Soiling 3.1 m3
1 9.8 0.9 0.150 1.3 m3
Floor 1 2.5 4.7 0.15 1.8 m3
3 PCC(1:2:4) 1.6 m3
1 9.8 0.90 0.08 0.7
Floor 1 2.5 4.70 0.08 0.9
4 Stone Masonary(1:4) 4.8 m3
1 9.8 0.7 0.7 4.8
5 DPC Band
1 9.8 0.23 0.2 0.45 m3
6 Brick Masonary(1:4) 4.5 m3
1 9.8 0.23 2.29 5.2 m3
Deduction
Door 2 0.76 0.23 1.83 -0.64 m3
Ventilation 2 0.61 0.23 0.30 -0.08 m3
7 Chaukosh 0.11 m3
Door 2 0.76 0.09 1.83 0.08 m3
Ventilation 2 0.61 0.09 0.30 0.03 m3
8 Panal 3.15 m2
Door 2 0.76 1.83 2.78 m2
Ventilation 2 0.61 0.30 0.37 m2
9 PCC(1:2:4) 1.29 m3
Slab 1 3.35 2.13 0.13 0.93 m3
Sill 1 9.80 0.23 0.08 0.18 m3
Lintel 1 9.80 0.23 0.08 0.18 m3
10 Plaster (1:4) 24.67 m2
Big Room 1 5.64 2.29 12.92 m2
Small Room 1 5.13 2.29 11.75 m2
11 Reinforcement 224.00 Kg
Vertical Rod 16mm Rod 6 3.35 1.58 31.76 Kg
DPC Band 12mm dia 4 9.8 0.89 34.89 Kg
Sill 12 mm dia 2 9.8 0.89 17.44 Kg
Lintel 12mm dia 2 9.8 0.89 17.44 Kg
Stirrups 8mm dia 290 0.3 0.39 33.93 Kg
Slab
Main Bar 10 mm dia 34 2.1 0.62 44.27 Kg
Distribution Bar 10 mm dia 21 3.4 0.62 44.27 Kg
12 Pan 2 2.0 Nos
13 Fittings 1 1.0 Ls
14 Hill Tank 1 1.0 Nos
15 Tile(1:4) 9.76 m2
Floor 2 1.37 1.22 3.34 m2
Side 2 5.49 0.70 7.69 m2
Deduction
Door 2 0.91 0.70 -1.27 m2
Masonary wall
1 Earthwork in excavation 1 10 0.72 0.5 3.6 m3

2 Masonary wall(1:4) 14.99 m3


Straight 1 10 0.72 1.70 12.24 m3
Slpoe 1 4.5 0.72 1.70 2.75 m3

Prepared By Checked By Approved By


Manju Bhandari Atit Khanal Dev Bdr. Adhikari
Rainas Municipality
Office of Rainas Municipal Executive
Tinpiple,Lamjung, 4 No. Provience
2017

sfo{ ;DkGg k|lta]bg


of]hgfsf] gfd Toilet and Masonary wall ;Demf}tfsf] s"n c+s M #REF!
of]hgf :yn M Rainas Municipality vr{ ePsf] s"n c+s M #REF!
sfof{/De ldlt M ;Demf}tf eGbf 3l6 a9 #REF!
:fDkGg ePsf] ldlt M 36L a9Lsf] k|lt;t M #REF!

;Demf}tf adf]lhd v'b ePsf] sfd ;Demf}tf eGbf 3l6 ÷ a9L


s|=:f+Vof sfdsf] laj/0f OsfO{ s}lkmot
kl/0ffd OsfO{ b/ hDdf d"No kl/0ffd OsfO{ b/ hDdf d"No kl/df0f OsfO{ b/ hDdf dNo
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #REF! #REF! #REF!
a9L ePsf] - _ 36L ePsf] - _
Rainas Municipality
Office of the Municipal Executive
Tinpiple, Lamjung, 4 No. Province, Nepal
BoQ
#REF!
#REF!
S.N. Description of work Quantity units Rate Amount Remarks
1 #REF! #REF! #REF!
2 #REF! #REF! #REF!
3 #REF! #REF! #REF!
4 #REF! #REF! #REF!
5 #REF! #REF! #REF!
6 #REF! #REF! #REF!
7 #REF! #REF! #REF!
8 #REF! #REF! #REF!
9 #REF! #REF! #REF!
10 #REF! #REF! #REF!
11 #REF! #REF! #REF!
12 #REF! #REF! #REF!
13 #REF! #REF! #REF!
14 #REF! #REF! #REF!
15 #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
Total
VAT (13%)
Grand Total
#REF!
#REF!
#REF!
Bill of Quantity (BoQ)
###
### F/Y :- 2074 /075
Rate (NRs.)
S.No. Descriptions Unit Quantity Amount (NRs.)
In Figure In Words
1.0 #REF! LS 1.000
2.0 #REF! m3 4.434
3.0 #REF! m3 1.794
4.0 #REF! m3 4.549
5.0 #REF! m3 1.572
6.0 #REF! Kg. 124.810
7.0 #REF! m2 19.878
8.0 #REF! m3 1.527
9.0 #REF! m3 8.126
10.0 #REF!
11.0 #REF! m3 0.179
12.0 #REF! m2 1.934
13.0 #REF! m2 2.275
14.0 #REF! m2 1.046
15.0 #REF! m2 3.100
Masonry wall
1.0 #REF! Kg. 195.450
2.0 #REF! m2 26.020
13% VAT
Total

Name and address of Firm :-

Sign and seal : -


Date :-
Remarks