Fuel Tank Ring Beam Design Calculation PDF
Fuel Tank Ring Beam Design Calculation PDF
This Design Calculation for Ring Beam Design for Fuel Tank at Bamenda Powe r Plant is based on
the Design Guidelines provided by "Process Industry Practices Structural: PIP
STE03020 -Guidelines for Tank Foundation De signs".
Concrete Design is according to the BS 8110:1997 and ACI 318 as applies relevantly.
Ultimate Limit State loads for foundation design work, from Fuel Tank Designer Shop Drawing,
attached in Appendix 1
Service Limit State loads for foundation design work, from Fuel Tank Designer Shop Drawing,
attached in Appendix 1
Height of liquid, Hl
Hl := 5500mm
kN
Density of Steel, γ.st γst := 78.50
3
m
kN
Density of Concrete, γc γc := 24
3
m
Soil Parameters:
1 − sin ( ϕ )
ϕ := 35deg ka :=
1 + sin ( ϕ )
1 kN
kp := Cs := 5
ka 2
m
SBC := 1.2bar
kN
Density of Soil, γs γs := 18
3
m
N
fcu := 29
2
mm
N
fy := 460
2
mm
Soil Bearing Pressure under Ring Beam and the infill soil pressure at the same bottom level of
the foundation should be kept equal as far as possible, to avoid settlement due to punching
shear.
So for this reason first it will be calculated the Shell Wall weight [Ww] directly transferring
onto the Ring Beam with self weight [Fsw] of the ring beam. This total Soil Pressure will be
compared against the infill soil pressure to see the difference.
Empty Tank Load on SLS will be considered as the Shell Wall loading onto the Ring Beam,
hence
approximate Actual Shell Wall Load without fixing arrangements and accessories, AWw,
2
Dr
π ⋅ ⋅ WPt ⋅ γst
AW w := WPt ⋅ Ht ⋅ γst +
2 ⋅2 kN <-lesser
π⋅ D AW w = 5.063 ⋅ value, not
r m
considered.
Shell Wall Load at SLS,
p1e kN
W w := W w = 13.235 ⋅
π ⋅ Dr m
for Ring Beam Design Calculation the Shell Wall loading will be considered as Ww.
D br
2
Dr br
2
r
π ⋅ + − − ⋅ hr ⋅ γc
RBsw :=
2 2 2 2
= 9.6 ⋅
kN
π⋅ D
r m
soil pressure due to Ring Wall and Shell Wall loading at SLS,
D br
2
Dr
2
r
(Ww + RBsw) ⋅ π ⋅ Dr + Wf⋅ π ⋅ 2 + 2 − π ⋅ 2
σrwsw :=
D
Dr br
2 2
r br
π ⋅ + − −
2 2 2 2
Surcharge load and infill soil load stress at Ring Beam bottom level:
p1f + p2f kN
S s := + hr ⋅ γs = 79.356 ⋅
2 2
Dr br m
π⋅ +
2 2
kN
Soil Bearing Pressure under tank, Ss S s = 79.356 ⋅
2
m
actual soil loading based on Tank De signer S LS Loading Data is highe r than the pure Fuel and
Soil pressure loading, below shown, hence Ss calculation is conservative.
kN
Hl ⋅ γf + hr ⋅ γs = 63.76 ⋅
2
m
σrwsw
= 1.014 ratio between ring beam bottom soil pressure and infill soil inside,
Ss approx =1.
at SLS the pressure under Ring Beam is approximately equal to the SLS soil pressure due to infill,
hence the Ring Beam width is sufficient.
D 2 2
P1e r br Dr
+ RBsw ⋅ π ⋅ Dr + W f ⋅ π ⋅ + − π⋅
π ⋅ Dr
2 2 2
ULSσrwsw :=
D 2 2
r br Dr br
π ⋅ + − −
2 2 2 2
kN
ULSσrwsw = 97.035 ⋅
2
m
SBC
= 1.237 > 1.2 ok
ULSσrwsw
Lateral loading transferred into the wall are two types, one is from the infill soil lateral
pressure and the other will be from surcharge load due to the tank weight and fuel inside.
p1 := ka ⋅ hr ⋅ γs kN
p1 = 4.878 ⋅
2
m
due to surcharge of the Tank weight unde r SLS conditions,
p2 := ka ⋅ S s kN
p2 = 21.505 ⋅
2
m
Lateral Force on Ring Beam per unit length,
p1 ⋅ hr
F1 := + p2 ⋅ hr kN
2 F1 = 23.944 ⋅
m
F1 ⋅ Dr
HT := = 113.732 ⋅ kN
2
HT
= 2.513
2
0.87 ⋅ fy ⋅ π ⋅ 12mm
2
to take this Hoop Tension, 3 nos of T12 bars are enough, hence check for the ULS for minimum
reinforcement requirement.
(
Asmin := 0.45% ⋅ hr ⋅ br ) Asmin = 1800 ⋅ mm
2
Asmin
= 15.915 16 bars of T12
12mm 2
π ⋅
2
For Vertical minimum reinforcement requirement, as per the Design Guidelines of "PIP
STE03020 -Guidelines for Tank Foundation De signs" re com mending ACI 318 code
requirements,
(
Avsmin := 0.0015 ⋅ hr ⋅ br ) Avsmin = 600 ⋅ mm
2
Avsmin
= 5.305 6 bars of T12
12mm 2
π ⋅
2
Ww N
νs := = 0.033 ⋅
br 2
mm
12mm
d1 := hr − 60mm − 12mm − d1 = 922 ⋅ mm
2
Design Shear Stress calculation, considering tension r/f provided, the Design Concrete Shear Stress
τC as per BS 8110: 3.5.5 Shear resistance of solid slabs,
1
3 1
2 1
100 ⋅ π ⋅ 12mm ⋅ 16
2 3
400mm fcu
4
br ⋅ d1 ⋅ d ⋅ N
1 25
2
νC := 0.79 ⋅
mm N
γ m 2
mm
N
νC = 0.425 ⋅
2
mm
νC
= 12.847 Shear Reinforcement is not required.
νs
Fuel Tank Diameter and He ight is within limits as following that Wind Analysis is not re quir ed.
Ht
= 0.632 which is less than 1 , no need to check for lateral loading of wind.
Dt
Even though this Fuel Tank is not anchor ed to the Foundation hence check m ust be done for
overturning which following criteria is adopted,
reference: Saudi Aramco Best Practice, SABP-005 - 31 August, 2002/ Storage Tank Ringwall
Foundation Design.
Mot := P4f ⋅ Ht
Mot = 621 ⋅ kN ⋅ m
Resisting Moment under ULS, for empty tank, with 2/3 reduction,
2 Dr
Mr := ⋅ P1e ⋅
3 2 Mr = 1877.833 ⋅ kN ⋅ m
Mr
= 3.024 hence safe.
Mot
D + b 4 − D − b 4
( r r) ( r r)
Zxx := π ⋅ 3
32 ⋅ ( Dr + br) Zxx = 27.256 ⋅ m
due to extreme wind forces under ULS conditions, the soil stress increment due to the
over turning moment, is calculated below for upper limit and lower limit, upper limit must
be checked for Soil Bearing Capacity.
Mot kN
σ1 := σrwsw + σ1 = 103.234 ⋅
Zxx 2
m
Mot kN
σ2 := σrwsw − σ2 = 57.665 ⋅
Zxx 2
m
kN
σ1 < SBC = 1 OK SBC = 120 ⋅
2
m
under ULS lateral loading conditions , Fuel Tank Foundation soil pre ssur es are safe .