BILL OF QUANTITIES

DESCRIPTION OF WORKS UNIT


Division No.
UNIT QTY PRICE PRICE
SITE WORK AND SITE DEVELOPMENT
1. SITE WORK
a. Site Preparation Sq.m
Layout and Staking
Clearing and Rubbing
b. Soil Treatment 1 Lot
c. Earthworks and Retaining Structures Cu.m
2 a. excavation
b. fill and backfill with compaction
2. SITE DEVELOPMENT
a. concrete curbs, Gutters and Paved walks 1 lot
b. site drainage 1 lot
c. site electrical and transformers 1 lot
d. site water supply and service entrance 1 lot
e. landscaping NOT INCLUDED
CONCRETE
a. Forms, Scaffolding and Accessories 1 lot
b. Reinforcement 1 lot
3
c. concrete 1 lot
d. others 1 Lot
e. RC Testing 1 lot
METALS
a. Structural Steel and Accessories 1 lot
5
b. miscellaneous Structural Steel. 1 lot
c. misc. stainless steel and metals 1 lot