SHEET 1 of 1
PUMPING STATION 2
PERMANENT PIPE LINE
PRESSURE TESTING
Job No : PP-12--0001
DSSR Drg No
Item / Description:
Drawing Number
XB-P2-FP-207504/207508
TIME 9.30 am
Remarks:
K.JAIKUMAR
Received By :
Ref.No. MHI-XAY-QC-IR-602
SV □ Day shift
EM □ Night shift
EN Start hrs.
SF Finished hrs.
GOL-E Page 1 total 1
……………….
13th Sep
2018
1
PRESSURE TEST REPORT
Job No PP-12-0001
Drawing No XB-P2-FP-207504/207508
Description Pumping Station 2 - ITT Gates Permanent Hyd. Pressure Pipe Lines (A1 ,A2& A3)
1.SPECIFICATION
Test Temperature 24 °C
Use Medium
Hydraulic Oil HLP 32ZZ
2. REFERENCE
PRESSURE GAUGE
3. INSPECTION REPORT
255 MINIMUM
10 MINS
DESIGN PRESSURE 10 MINS
255 Kg/Cm2
0
RESULT
DURATION 10 MINS
Leakage YES/NO NO
COMMENTS:
Checked by :MONTAN
Signature
Name
Date
P2 QC
Signature
Name
Date
page -02
Job No PP-12-0001
Description Pumping Station 2 - ITT Gates Permanent Hyd. Pressure Pipe Line (B1 ,B2& B3)
1.SPECIFICATION
Test Temperature 24 °C
Use Medium
Hydraulic Oil HLP 32ZZ
2. REFERENCE
PRESSURE GAUGE
3. INSPECTION REPORT
HYDROTEST DIAGRAM
TEST PRESSURE
235
155 Kg/Cm2
155 MINIMUM
10 MINS
10 MINS
DESIGN PRESSURE
235 Kg/Cm2
RESULT
DURATION 10 MINS
Leakage YES/NO NO
COMMENTS:
Checked by :MONTAN
Signature
Name
Date
P2 QC
Signature
Name
Date
page -03
PRESSURE TEST REPORT
Pressure -Line (A1 , A2 & A3)
Ref No : MH-XAY-QC-IR-602
s Permanent Hyd. Pressure Pipe Lines (A1 ,A2& A3) Power Pack No: MH16-08-4845
Pressure
HYDROTEST DIAGRAM
382
255 MINIMUM
10 MINS
10 MINS
0 382
0
10 MINS
NO
Witnessed by : WHESSOE
Signature
Name
Date
REP.GOL-Engineer
Signature
Name
Date
page -02
s Permanent Hyd. Pressure Pipe Line (B1 ,B2& B3) Power Pack No: MH16-08-4845
Pressure
HYDROTEST DIAGRAM
235
155 MINIMUM
10 MINS
10 MINS
0 235
0
10 MINS
NO
CLEARED FOR NEXT STAGE/ HOLD
Witnessed by : WHESSOE
Signature
Name
Date
REP.GOL-Engineer
Signature
Name
Date
page -03
DATE OF CALIBRATION
N/A
N/A
REMARKS
No Leakage
DATE OF CALIBRATION
N/A
N/A
REMARKS
No Leakage
FIELD INSPECTION REPORT - HYDRAULIC PIPE LINES PRESSURE T
Job No
Project
Location
Drawing No
Description
ITEM
8
8
10
11
Checked By :
Signature :
Name :
Date :
Signature :
Name :
Date :
FIELD INSPECTION REPORT - HYDRAULIC PIPE LINES PRESSURE TEST
PP-12-0001 Ref.No : MH-XAY-QC-IR
Xayaburi HEPP, Package- 2 Date : 13th Sep 2018
Pumping Station 2 - ITT Gates Permanent Hyd. Pressure Pipe Line (A1 ,A2& A3)
PASS
DESCRIPTION
YES
Hydraulic Hand Pump Connected to the HPU Valve Block Port for the Pressure
Line - A1 ,A2 & A3 (to develop the test pressure on the line)
The Cylinder Ball Valves (304,305 ) should be in clossed Condition Refer Drg No:
XB-P2-FP-207504
Pressure Testing - Pressure Line A 1 (Drg No: 207504).The set pressure is at 255
Kg / cm 2.Reduce Pressure setting to avoid impulse
Adjust the Pressure setting upto Maximum working Pressure is 255 Kg/cm 2 and
Hold the Pressure for 10 minutes,No Leakage is Allowed .
The Hand Pump is used to built the Test Pressure upto 380 Kg/cm2(1.5 times of
working pressure) and Hold the Pressure for 10 minutes,No Leakage is Allowed.
The Hand Pump is used to built the Test Pressure upto 380 Kg/cm2(1.5 times of
working pressure) and Hold the Pressure for 10 minutes,No Leakage is Allowed.
Pressure Testing for Pilot Line - B1,B2 & B3 (Drg No: 207504)
a) Give Close Command thro Local Control Panel
b) Setting of Maximum Working Pressure is 155 Kg/cm 2 and
check for 10 minutes -No Leakage is Allowed
c)Adjust Pressure Relief Vaive setting up to Maximum Test pressure is 230
Kg/cm 2 and check for 10 minutes,No Leakage is Allowed
Pressure Testing for Return Line is Required Test Pressure -15 Kg/cm 2, during
Flushing 20 Bar Pressure is applied ,hence Pressure Testing is not Required
Montan Witnesse :
gnature : Signature
me : Name
te : Date
P2 QC
gnature : Signature
me : Name
te : Date
Page : 01
URE TEST
ef.No : MH-XAY-QC-IR-602
PASS
REMARKS
NO
T STAGE / HOLD
itnesse : Whessoe
: Reviewed By : Owner
EP.G O L Engineer
:
: