SHEET 1 of 1
PUMPING STATION 2
PERMANENT PIPE LINE
PRESSURE TESTING
Job No : PP-12--0001

Project : Xayaburi HEPP

Location ; Xayaburi ,Lao PDR

Attention To : Ronnie Pesquerra

CHK MECHANICAL - SR.QC.ENG.,

Date : 13th Sep 2018

Ref. No. : MHI-XAY-QC-IR-602

DSSR Drg No

Sir / Madam, XB-P2-FP-207504/207508

Item / Description:

1 ITT - Pumping Station 2 Gate - Hyd.Pipelines Pressure Testing Inspection

Drawing Number

XB-P2-FP-207504/207508

Type of Inspection VISUAL INSPECTION

Requested On : DATE 13th Sep 2018

TIME 9.30 am

PLACE AT SITE - at Pumping Station 2

Remarks:

Requested By: Inspected By : Noted by;

MONTAN AND WHESSOE

K.JAIKUMAR

Name/signature/Date Client Representative Client QA/QC Manager

Received By :

Name Signature Date


CH. KARNCHANG (LAO) COMPANY LIMITED
Xayaburi Hydrielectric Power Project, Lao PDR
Daily Requ

□ Cofferdam □ Spillway □ Quarry Attn :


□ Intermedial Block □ Powerhouse □ Road □
□ Navigation Lock □ Fish Laddder □ □
Location PH II - Pumping Station 2 - Pressure Testing Inspection □
Station : □
Section : □
Detail : □


Description Location

1 PH II Pumping station 2 - Pressure Testing Inspection Pumping Station 2

For your kind attention and cooperation


Yours faithfully

CHK Site Engineer


Daily Request

Ref.No. MHI-XAY-QC-IR-602

QC, QA Week No.

Lab Date 13th sep 2018

SV □ Day shift

EM □ Night shift

EN Start hrs.

SF Finished hrs.
GOL-E Page 1 total 1
……………….

Location Time Remark

mping Station 2 9.30 am

13th Sep
2018

attention and cooperation


Yours faithfully

CHK Site Engineer

1
PRESSURE TEST REPORT

Job No PP-12-0001

Project Xayaburi HEPP, Package No-2

Location XayaburiI (LAO) PDR

Drawing No XB-P2-FP-207504/207508

Description Pumping Station 2 - ITT Gates Permanent Hyd. Pressure Pipe Lines (A1 ,A2& A3)

1.SPECIFICATION

Design Pressure 255 Kg/Cm2 - 10mins

Test Temperature 24 °C
Use Medium
Hydraulic Oil HLP 32ZZ

2. REFERENCE

PRESSURE GAUGE

Measuring Instrument WIKAI

Range of Pressure Design-Pressure-255Kg/Cm2

Time Start: 9.05 AM End : 9.15 AM

3. INSPECTION REPORT

TEST PRESSURE HYDROTEST DIAGRAM

382 Kg/Cm2 382

255 MINIMUM
10 MINS
DESIGN PRESSURE 10 MINS
255 Kg/Cm2

0
RESULT

DURATION 10 MINS

Pressure DesignPressure-255 Kg/Cm2

Temperature Start: Finish :

Time Start: 9.05 AM Finish : 9.15 AM

Leakage YES/NO NO

COMMENTS:

Checked by :MONTAN

Signature

Name

Date

Checked Reviewed by :CLIENT

CH.Karnchang (LAO) Company Limited

P2 QC

Signature

Name

Date

page -02

PRESSURE TEST REPORT

Job No PP-12-0001

Project Xayaburi HEPP, Package No-2

Location XayaburiI (LAO) PDR


Drawing No XB-P2-FP-207504/207508

Description Pumping Station 2 - ITT Gates Permanent Hyd. Pressure Pipe Line (B1 ,B2& B3)

1.SPECIFICATION

Design Pressure 155 Kg/Cm2 - 10mins

Test Temperature 24 °C
Use Medium
Hydraulic Oil HLP 32ZZ

2. REFERENCE

PRESSURE GAUGE

Measuring Instrument WIKAI

Range of Pressure Design-Pressure-155 Kg/Cm2

Time Start: 9.38 AM End : 9.48 AM

3. INSPECTION REPORT

HYDROTEST DIAGRAM
TEST PRESSURE
235
155 Kg/Cm2

155 MINIMUM
10 MINS
10 MINS
DESIGN PRESSURE
235 Kg/Cm2

RESULT

DURATION 10 MINS

Pressure DesignPressure-155 Kg/Cm2

Temperature Start: Finish :

Time Start: 9.38 AM Finish : 9.48 AM

Leakage YES/NO NO
COMMENTS:

Checked by :MONTAN

Signature

Name

Date

Checked Reviewed by :CLIENT

CH.Karnchang (LAO) Company Limited

P2 QC

Signature

Name

Date

page -03
PRESSURE TEST REPORT
Pressure -Line (A1 , A2 & A3)
Ref No : MH-XAY-QC-IR-602

Date : 13th Sep 2018

Area : Pumping Station 2 - ITT

Gate No: 1,2 & 3

s Permanent Hyd. Pressure Pipe Lines (A1 ,A2& A3) Power Pack No: MH16-08-4845

Test 380 Kg/Cm2 - 10mins

Pressure

Test Medium Hydraulic Oil HLP 32ZZ

GAUGE NO. RANGE DATE OF CALIBRATION

90249546-13-29 0 to 400 Kg/Cm2

Test - Pressure-382 Kg/Cm2 N/A

Start : 9.15 AM End : 9.25 AM N/A

HYDROTEST DIAGRAM

382

255 MINIMUM
10 MINS
10 MINS

0 382
0
10 MINS

Test Pressure-382 Kg/Cm2

Finish : Start: Finish:

Finish : 9.15 AM Start: 9.15 AM Finish: 9.25 AM

NO

CLEARED FOR NEXT STAGE/ HOLD

Witnessed by : WHESSOE

Signature

Name

Date

Checked Reviewed by :OWNER

REP.GOL-Engineer

Signature

Name

Date

page -02

PRESSURE TEST REPORT


Pressure -Line (B1,B2 & B3)
Ref No : MH-XAY-QC-IR-602

Date : 13th Sep 2018

Area : Pumping Station 2 - ITT


Gate No: 1,2 & 3

s Permanent Hyd. Pressure Pipe Line (B1 ,B2& B3) Power Pack No: MH16-08-4845

Test 230 Kg/Cm2 - 10mins

Pressure

Test Medium Hydraulic Oil HLP 32ZZ

GAUGE NO. RANGE DATE OF CALIBRATION

90249546-13-29 0 to 400 Kg/Cm2

Test - Pressure-235 Kg/Cm2 N/A

Start : 9.48 AM End : 9.58 AM N/A

HYDROTEST DIAGRAM

235

155 MINIMUM
10 MINS
10 MINS

0 235
0

10 MINS

re-155 Kg/Cm2 Test Pressure-235 Kg/Cm2

Finish : Start: Finish:

Finish : 9.48 AM Start: 9.48 AM Finish: 9.58 AM

NO
CLEARED FOR NEXT STAGE/ HOLD

Witnessed by : WHESSOE

Signature

Name

Date

Checked Reviewed by :OWNER

REP.GOL-Engineer

Signature

Name

Date

page -03
DATE OF CALIBRATION

N/A

N/A
REMARKS

No Leakage
DATE OF CALIBRATION

N/A

N/A

REMARKS

No Leakage
FIELD INSPECTION REPORT - HYDRAULIC PIPE LINES PRESSURE T
Job No

Project

Location

Drawing No

Description

ITEM

8
8

10

11

Checked By :

Signature :

Name :

Date :

Checked Reviewed By : CLIENT

CH.Karchang (LAO) Company Limited

Signature :

Name :
Date :
FIELD INSPECTION REPORT - HYDRAULIC PIPE LINES PRESSURE TEST
PP-12-0001 Ref.No : MH-XAY-QC-IR
Xayaburi HEPP, Package- 2 Date : 13th Sep 2018

Xayaburi LAO (PDR) Pier No : RH Junction Po

XB-P2-FP-61304 Power Pack No: MH16-0

Pumping Station 2 - ITT Gates Permanent Hyd. Pressure Pipe Line (A1 ,A2& A3)

PASS
DESCRIPTION
YES

Pressure & Return Pipelines are connected to Cylinder Valve Block

Hydraulic Hand Pump Connected to the HPU Valve Block Port for the Pressure
Line - A1 ,A2 & A3 (to develop the test pressure on the line)

The Cylinder Ball Valves (304,305 ) should be in clossed Condition Refer Drg No:
XB-P2-FP-207504

Pressure Testing - Pressure Line A 1 (Drg No: 207504).The set pressure is at 255
Kg / cm 2.Reduce Pressure setting to avoid impulse

H P U - Shut-off Valves( Pr, & Rtn) are should be opened 218


Refer Drg No: XB-P2-FP-207504

Give Open Command through Local Control Panel

Adjust the Pressure setting upto Maximum working Pressure is 255 Kg/cm 2 and
Hold the Pressure for 10 minutes,No Leakage is Allowed .

The Hand Pump is used to built the Test Pressure upto 380 Kg/cm2(1.5 times of
working pressure) and Hold the Pressure for 10 minutes,No Leakage is Allowed.
The Hand Pump is used to built the Test Pressure upto 380 Kg/cm2(1.5 times of
working pressure) and Hold the Pressure for 10 minutes,No Leakage is Allowed.

Disconnect the Hand Pump after releasing pressure

Pressure Testing for Pilot Line - B1,B2 & B3 (Drg No: 207504)
a) Give Close Command thro Local Control Panel
b) Setting of Maximum Working Pressure is 155 Kg/cm 2 and
check for 10 minutes -No Leakage is Allowed
c)Adjust Pressure Relief Vaive setting up to Maximum Test pressure is 230
Kg/cm 2 and check for 10 minutes,No Leakage is Allowed

Pressure Testing for Return Line is Required Test Pressure -15 Kg/cm 2, during
Flushing 20 Bar Pressure is applied ,hence Pressure Testing is not Required

COMMENTS : CLEARED FOR NEXT STAGE / HOLD

Montan Witnesse :

gnature : Signature

me : Name

te : Date

ecked Reviewed By : CLIENT Checked

H.Karchang (LAO) Company Limited REP.G O L Engineer

P2 QC

gnature : Signature

me : Name
te : Date

Page : 01
URE TEST
ef.No : MH-XAY-QC-IR-602

ate : 13th Sep 2018

er No : RH Junction Pool Slide Gate

ower Pack No: MH16-07-4842

PASS
REMARKS
NO
T STAGE / HOLD

itnesse : Whessoe

: Reviewed By : Owner

EP.G O L Engineer

:
: