You are on page 1of 1

Prepared by (GPA): histno Version: 1

GPRO_328_1 Weekly Yield Meeting Process Approved by (GPO): madano Last modified: 2016-12-06

Input Process Output

Test Issue: equipment Improved


12.a Maintenance
Yield and
Test Equipment
Quality
Weekly
yield report
from WATS
Process issue 12.b Improve
Process
Manufacturer

1. Send report 6. Attend


10. Send Fail
Yield report to meeting Weekly Yield
Units to Eltek
from WATS participants Meeting Operator fail 12.c Improve
Training

Line Stop Level 12.d Stop


Production

No Manufacturer issues
No Action

Stop Order Level 7. Stop Order


Fail cause Stop Order
GPRO_091_1
6a. Hold
Meeting,
create and
8. Eltek
3. Attend send MoM. 8D report required
5. Call for Process
Preparation Request fail 8D report
Weekly Improvement
Meeting.Make units if
(GPRO_038)
QA

Yield Meeting necessary


comments , Need
suggest Failure No QA issues
possible fail Units? No Action
cause
Minutes of
Meeting Yes

3a.Hold 6. Attend
Preparation Weekly Yield
R&D Test Engineering

Meeting. 4. Distribute Meeting.


2. Call for Test issue : TE 12.e Improve
Make Yield report Request fail
Preparation Test Improved Test
comments , with units if
Meeting (GPRO_322_1)
suggest comments necessary
possible fail
cause Weekly
yield report
with No Test Engineering issues
comments No Action

3. Attend
Preparation
R&D Designers

Meeting.Make
comments ,
suggest
possible fail
cause,
request Fail
Units if
nessesary

3. Attend
6. Attend
R&D Process

Preparation Process issue


12.f Improve
Meeting. Weekly Yield Process Improved process
Make Meeting. (GPRO_039)
comments , Request fail
suggest uits if No Process issues
possible fail necessary No Action
cause

6. Attend 12.g Adding


3. Attend Component issue
Weekly Yield equivalent Product changes
Preparation
Meeting. (GPRO_021)
Meeting.
R&D Product Maintenance

Make Request fail


comments , units if 12.h Implement
suggest necessary Design issue Product
possible fail changes
cause (GPRO_030)

No component/ design issues


No Action

11. Handling
9. Provide
and distribution Distributed Fail
Eltek Unit
of requested fail Modules
Tracking No
modules
Documents

Implement Process
Weekly Generic Proc. Handling Selection new Eltek 4M Test Test Equipment Test verification MOM Weekly
Product Improvements
yield report Control Stop Orders components Management Engineering Maintenance w golden sample yield report
Changes EPI
from WATS GPRO_039 GPRO_091_1 GPRO_021_1 GPRO_306 GPRO_322_1 2026491 2013378 w comments
GPRO_030 GPRO_038

Security level: Internal use 1 of 1