Morning Meeting

Daily Events

Complex remained operational as per NPCC dispatch requirement


NPCC Despatch

Notification time Achieve time NPCC demand details

None
GT-1 Activities
Time hrs
Maximum vibration at GT-1 was noted as 3.8mm/s on generator bearing-2 (39V-
0:07 5A) load 341 MW, ,Mvars 115, lube oil temperature 49.1°C, and Frequency
50.30Hz.
Note GT-1 evap cooler problem persisting. PTW extended for one week.

GT-1 at base load AFDP=9.17 ,CF= 6.71, FS=1.67, Carbon brushes temperature
Note remained 42,41,40°C during the night.

GT-2 Activities

Time hrs

Maximum vibration at GT-2 was noted as 10.0 mm/s on generator bearing-2 (39V-
8:13 5B) load 389 MW, Mvars 83 .lube oil temperature 48.9°C and Frequency 50.16 Hz.

GT-2 at base load AFDP=8.47, CF=6.23, FS=1.37. Carbon brushes temperature


Note remained 43,43,42°C during night.

STG Activities

Time hrs

Maximum Vibration at STG was Noted as 63.84 µm at bearing #2 (10MAD20CY021)


6:04 load 356.76 MW ,Mvars 38.14, lube oil temperature 41.32°C and Frequency
50.45Hz.

17:39
ST lube oil TCV abnormally closed during operation, got normal after resetting
breaker. Informed I&C.

HRSG Activities

Time hrs

12:12 HRSG-2, SCR-1 fan started for vibration measurement at 10% speed.

12:14 SCR-1, fan speed gradually increased to 30%, current 19amp.

12:22
SCR-1, fan speed gradually increased to 50%, current 22amp, vibration D.E
2.9mm/sec and gas flow 6029m3/hour.

12:25 SCR-1 fan stopped


12:31 HRSG-1, SCR-2 fan started at 10% speed,

12:36
SCR-2, fan speed gradually increased to 50%, current 22.08amp, vibration D.E
1.9mm/sec.
12:41 SCR-2 fan stopped

Electrical Activities

Time hrs

BOP Activities

Time hrs

Fire fighting system de-isolated after completion of maintenace work but again
20:50 leakage observed from hydrant#12 .Maintenace team tighted the hydrant bolt and
sytem normalized.
22:09 Fire fighting system pressurizing completed.

Defects

Oil seapage observed from 500Kv Bay-2 phase blue SMSCT20

HRSG-2 Blowdown pit pump#2 breaker tripped twice,need to be check.


Date: Wednesday, September 02, 2020
GT-1 Gross Load GT-2 Gross Load ST-Gross Total Gross
Status at 07:30 hrs
285 281 317 884

T/L # KV MW Amp T/L # kV MW Amp Frequency Hz

Multan 533 488 560 Gatti-1 533.00 -89.00 356.00


50.29
Gatti2 533.00 -50.00 67.00 Muzaffergarh 533.00 509.00 38.00

Switchyard CBs not closed NONE

Auxiliary Load

Total Auxiliary
KV MW Amp KV MW Amp (MWh)
Aux Bus Bar-GT1 11.20 3.99 298.00 Aux Bus Bar-STG-1 11.48 4.60 371.00
464.59
Aux Bus Bar-GT2 11.45 3.0 233 Aux Bus Bar-STG-2 6.42 8.17 523

Air intake filters DP at Baseload Tanks levels


H2 Press (bar) H2 Purity (%)
Pre-Filter Fine-Filter Total Raw Water Pond Demin Tank-1 Level Demin Tank-2
(mbar) (mbar) (mbar) Level (M) (M) Level (M)

GT-1 3.88 96.4 6.67 1.82 9.55 4.4 7.716 7.688

HSD Tank-2 Level


GT-2 3.85 96.5 6.25 1.7 9.11 HSD Tank-1 Level (M) (M)

Gas Consumption
HBS Meter (MMSCfd) 150.7 H2 Consumption (m3) 28.15 10.35 4.16

DM Water
0.00 DM Water Consumption (m3) 736.00
Production (m3)