dimenstion

SL.no DESRIIPtion Nos Quantity


l(m) B(M) D(M)
Earth workexacation
1 Column 12 1.2 1.2 1.8 31.104
Plinth Beam 1 32.4 0.3 0.4 3.888
SandFilling
2
column FOOting 12 1.2 1.2 0.15 2.592
PCC 1:4:8 For Column Footing
3 Column 12 1.2 1.2 0.15 2.592
Brick Conrit in CM1:4
4
Main walls all around 1 46.8 0.3 5.05 14.04
5 Earthwork inside basement 1 6.6 16.2 0.42 44.9064
6 FOOting with CC 1:4:8inside wall 1 6.6 16.2 0.15 16.038
Remark