PROGRESS AS ON Date Monday, October 5, 2020

ALN-SHIV (Doubling)
PA-SSV (Doubling) SSV-FSG (Doubling) FSG-ALN (Doubling) SSV-ALN (Doubling)
SHIV EXCLUDING

FUTURE SCOPE
CUMULATIVE DONE

CUMULATIVE DONE

CUMULATIVE DONE

CUMULATIVE DONE

CUMULATIVE DONE

CUM.SCOPE
Done Today

CUM.DONE

CUM.BAL
FUTURE SCOPE

FUTURE SCOPE

FUTURE SCOPE

FUTURE SCOPE

FUTURE SCOPE
DONE TODAY

DONE TODAY

DONE TODAY

DONE TODAY

DONE TODAY
BALANCE

BALANCE

BALANCE

BALANCE

BALANCE
SCOPE

SCOPE

SCOPE

SCOPE

SCOPE
DESCRIPTION

AB = A+F+K+P

AC = C+H+M+R
Z = B+G+L+Q

AD = E+J+O+T
AA = D+I+N+S
W = H+M
O = K-M

V = G+L
U = F+K

Y = J+O
E = A-C

X = I+N
T = P-R
J = F-H

M
G

Q
A

R
B

L
F

S
I
Foundation : 214 0 214 12 0 228 0 225 15 3 177 0 172 0 5 133 0 133 0 0 405 0 397 15 8 0 27 752 744 8
Mast Erection : 173 0 173 24 0 179 0 177 18 2 139 0 135 0 4 110 0 81 0 29 318 0 312 18 6 0 42 601 485 35
Grouting : 173 0 173 24 0 179 0 177 18 2 139 0 135 0 4 110 0 71 0 39 318 0 312 18 6 0 42 601 485 45
Boom : 10 0 10 0 0 20 0 8 0 12 9 0 1 0 8 124 0 0 0 124 29 0 9 0 20 0 0 163 19 144
Bracket Erection : 203 0 203 26 0 208 0 203 17 5 140 0 136 0 4 127 0 10 0 117 348 0 339 17 9 0 43 678 542 126
Bracket Adjustment : 245 0 245 26 0 208 0 197 17 11 140 0 85 0 55 127 0 12 0 115 348 0 282 17 66 0 43 720 527 181
SED Checking 245 0 245 26 0 208 0 172 17 36 140 0 66 0 74 127 0 12 0 115 348 0 238 17 110 0 43 720 483 225
Wiring Catenary (Shots) : 18 0 18 2 0 9 0 9 1 0 9 0 7 0 2 6 0 0 0 6 18 0 16 1 2 0 3 42 34 8
Wiring Contact (Shots) : 18 0 18 2 0 9 0 9 1 0 9 0 6 0 3 6 0 0 0 6 18 0 15 1 3 0 3 42 33 9
ATD Erection : 36 0 36 4 0 16 0 16 2 0 18 0 6 0 12 12 0 0 0 12 34 0 22 2 12 0 6 82 58 24
ATD Adjustment 34 0 34 4 0 16 0 16 2 0 18 0 6 0 12 12 0 0 0 12 34 0 22 2 12 0 6 80 56 24
TW Checking 203 0 203 26 0 208 0 34 17 174 140 0 0 0 140 127 0 0 0 127 348 0 34 17 314 0 43 678 237 441
D&C (SPAN) : 203 0 203 26 0 208 0 195 18 13 140 0 105 0 35 128 0 7 0 121 348 0 300 18 48 0 44 679 503 169
Bond 173 0 173 24 0 179 0 81 18 98 139 0 67 0 72 110 0 0 0 110 318 0 148 18 170 0 42 601 321 280
Man Power Details Total
Foundation Work 0 0 0 DNJ-WLH (Doubling)
Grouting 0 0 0

CUMULATIV

BALANCE
FUTURE
OHE Activity 0 22 22

E DONE
TODAY
SCOPE

SCOPE
DONE
CUMULATIVE
Done Today

Foundation : 89 3 77 0 12
DONE

Dismentling Work Mast Erection : 71 0 0 0 71


Grouting : 71 0 0 0 71
Bracket Erection : 118 0 0 0 118
Foundation
MAST 3
Dropper Arm 47 Legends
Bracket 57 1. 17-18 KM 19 nos ROW issue.
Guy Rod 5 2. Today progress.
BWA 3. Completed.
OHE Shifting 8
OHE Temparory Anchoring
PROGRESS AS ON Date Monday, October 5, 2020
SHINDWANE-SATARA (Section-2, 3 & 4)
SHIV-JJR(SECTION-2) JJR-SLP(SECTION-3) SLP-AKI(SECTION-3A) JJR-AKI(SECTION-3) AKI-STR(SECTION-4)

FUTURE SCOPE
FUTURE SCOPE

FUTURE SCOPE

FUTURE SCOPE

CUM.SCOPE
Done Today
FUTURE SCOPE

FUTURE SCOPE

CUM.DONE
DONE TODAY

DONE TODAY

DONE TODAY

DONE TODAY

DONE TODAY
CUMULATIVE

CUMULATIVE

CUMULATIVE

CUMULATIVE

CUMULATIVE

CUM.BAL
BALANCE

BALANCE

BALANCE

BALANCE

BALANCE
SCOPE

SCOPE

SCOPE

SCOPE

SCOPE
DONE

DONE

DONE

DONE

DONE
DESCRIPTION

AB = A+F+K+U

AC = C+H+M+W
Z = B+G+L+V

AD = E+J+O+Y
AA = D+I+N+X
R = H+M
O = K-M

Y = U-W
Q = G+L

T = J+O
P = F+K
E = A-C

S = I+N
J = F-H

W
M
G

K
A

X
B

L
F

I
Foundation : 686 0 686 25 0 1240 0 1225 18 15 260 0 244 21 16 1500 0 1469 39 31 1080 0 928 20 152 0 84 3266 3083 183
Mast Erection : 576 0 576 25 0 1030 0 1004 16 26 236 0 209 19 27 1266 0 1213 35 53 895 0 603 17 292 0 77 2737 2392 345
Grouting : 576 0 576 25 0 1030 0 973 16 57 236 0 197 19 39 1266 0 1170 35 96 895 2 566 17 329 2 77 2737 2312 425
Bridge Mast Erection : 16 0 16 0 0 4 0 0 0 4 0 0 0 0 0 4 0 0 0 4 1 0 0 0 1 0 0 21 16 5
Tunnel Bracket Fixing 11 0 11 0 0 0 0 0 0 0 12 0 0 0 12 12 0 0 0 12 6 0 0 0 6 0 0 29 11 18
Boom : 18 0 18 0 0 80 0 63 0 17 2 0 0 0 2 82 0 63 0 19 50 0 0 0 50 0 0 150 81 69
Bracket Erection : 673 0 673 25 0 1349 0 1139 0 210 270 7 163 19 107 1619 7 1302 19 317 1022 0 250 17 772 7 61 3314 2225 1089
Wiring Catenary (Shots) : 37 0 37 1 0 55 1 52 0 3 11 0 0 1 11 66 1 52 1 14 50 0 0 1 50 1 3 153 89 64
Wiring Contact (Shots) : 37 0 37 1 0 55 0 47 0 8 11 0 0 1 11 66 0 47 1 19 50 0 0 1 50 0 3 153 84 69
ATD Erection : 64 0 64 2 0 103 0 85 0 18 24 0 0 2 24 127 0 85 2 42 89 0 0 2 89 0 6 280 149 131
D&C (span) : 697 0 697 25 0 1344 0 888 0 456 270 0 0 19 270 1614 0 888 19 726 1022 0 0 17 1022 0 61 3333 1585 1748
Bracket Adjustment : 697 0 697 24 0 1349 0 1185 0 164 270 0 0 19 270 1619 0 1185 19 434 1022 0 0 17 1022 0 60 3338 1882 1456
SED Checking 697 0 697 24 0 1349 0 937 0 412 270 0 0 19 270 1619 0 937 19 682 1022 0 0 17 1022 0 60 3338 1634 1704
TW Checking 697 0 697 25 0 1349 0 0 0 1349 270 0 0 19 270 1619 0 0 19 1619 1022 0 0 17 1022 0 61 3338 697 2641
ATD Adjustment : 64 0 64 2 0 103 0 64 0 39 24 0 0 2 24 127 0 64 2 63 89 0 0 2 89 0 6 280 128 152
Guy Rod : 139 0 139 6 0 214 0 138 0 76 36 8 20 2 16 250 8 158 2 92 192 6 31 4 161 14 12 581 328 253
A/C Wire : 37 0 37 1 0 55 0 37 0 18 11 0 0 1 11 66 0 37 1 29 50 0 0 1 50 0 3 153 74 79
Bond : 576 0 576 25 0 1030 14 360 16 670 236 0 0 19 236 1266 14 360 35 906 895 0 0 17 895 14 77 2737 936 1801
Man Power Details
Foundation Work 0 13 10 9 32
Grouting 0 0 0 15 15
OHE Activity 5 57 15 0 77
Other activity 0 0 0 0 0
Other Progress Total Single Line 124
TODAY TRAFFIC BLOCK
NA Total Double Line 22
2. 6 nos of IT Bond, 2 nos of Z Bond re-erected at Jejuri. Civil Work- Manpower 23
S&T- Manpower 10
SWS & TSS- Manpower 20
GSS & MSS- Manpower 28
• At per present yard condition at Adarki, Wathar & Jarandeshwar, only main or loop Other Activity- Manpower 34
line will be electrified. so quantity will be changed and rest balance quantity is Security- Manpower 120
added as future scope. KEC Staff Strength 64
3. 1 nos of singlem post isolator erection at 15/28. Total 445
PROGRESS AS ON Date Monday, October 5, 2020

Notes:-
1. 133-134 KM ROW issue.
2. Yard modification hold at 146km.
3. Doubling work ongoing at 112km, work hampered.S

Help required:-
1. 6 hr wiring traffic block and 4 hr mast erection traffic block.

Drawing Pending:-
1. Nira Bridge mast drawing approval.
2. SIP pending for all yard except Fursungi and Saswad yard.
3. ESP Balance for Salpha.