Project Duration :
Start
Completion
Project Features :
Housing Component To be sourced out from other possible housing programs like Gawad
Kalinga or Habitat for Humanity by the LGU of Carmen.
Road type all roads are PCCP with Curbs and Gutter
Drainage System Covered CHB-lined canals, RCCP Cross Drains
Water Supply System 60 cu.m. elevated concrete water tank including submersible motor pump
drilled at 40 m deep including 75mm&50mm uPVC distribution lines
Power Supply System
To be provided by Cotabato Electric Cooperative (counterpart of LGU)
* To be accomplished for projects included under New Works/listed under WPB Form 1a
Project Duration :
Start
Completion
Project Features :
25 units Duplex type house with 30 sq.m floor area, 16mm ø main bar for
Housing Component concrete columns and beams, smooth finished 4" thick CHB perimeter wall
and 6" thick firewall, 2.0 mm thick steel tube for steel trusses and 2.0 mm
thick for Cee purlins with Ga. 26 (0.505 thick) Corrugated G.I roofing
fastened by Teckscrew with rubber seal, complete Installation of Two
chamber septic tank with complete sanitary line, complete installation of
cold water lines and fixtures and electrical works.
Road type all roads are PCCP with Curbs and Gutter
Drainage System RCCP line canals with storm drainage manhole.
Water Supply System To be provided by M'lang Water District (Counterpart of LGU)
Power Supply System To be provided by Cotabato Electric Cooperative (Counterpart of LGU)
* To be accomplished for projects included under New Works/listed under WPB Form 1a
Project Features :
* To be accomplished for projects included under New Works/listed under WPB Form 1a
Project Name : Construction of 3481 Permanent Housing for Earthquake Affected Families
in Makilala, Cotabato
Intended Beneficiaries : Earthquake affected families living in high risk areas in Makilala
Project Features :
sewer lines
grease trap
280 W Solar Panel with 1000 W Solar Inverter
For procurement of the project. The project will generate a total of 3481
Project Status/Remarks housing units. 2000 units are targeted for completion in 2020 and 1481 in
2021
* To be accomplished for projects included under New Works/listed under WPB Form 1a
Project Name : Construction of 1700 Permanent Housing units for Earthquake Affected
Families in Kidapawan, Cotabato
Intended Beneficiaries :
Earthquake affected families living in high risk areas in Kidapawan City
Project Features :
sewer lines
grease trap
280 W Solar Panel with 1000 W Solar Inverter
Project implementation already started. The project will generate a total of
Project Status/Remarks 1700 housing units. 841 units are targeted for completion in 2020 and 859
units in 2021
* To be accomplished for projects included under New Works/listed under WPB Form 1a