You are on page 1of 2

Structural Calculations

Wind Load Calculation


Wind Velocity = 38m/s
Code: EN 1991-1-4:2005+A1:2010 Section 7.4.3
Method: Force coefficient
Terrain category = II

Gate Sign
Width, b = 1.2m
Height, h = 1.2m
Zg = 10.7m
Reference height, ze = zg + h/2
Reference area, Aref = b . h
Basic Wind Velocity, vb = cdir.cseason.vb,0
Air density, p = 1.25kg/m3

Calculation of Peak Velocity Pressure


Reference area and height
Ze = Zg + h/2 = 10.7 + 1.2/2 = 11.3m
Aref = b x h = 1.2 x 1.2 = 1.44m2

Basic Wind Velocity


vb = cdir.cseason.vb,0
Cdir = 1.0
Cseason = 1.0
Vb,0 = 1.0
vb = 38m/s
Terrain roughness
For terrain category II the corresponding values are z0 = 0.050m and zmin = 2.0m
kr = 0.19 x (z0 / z0,II )0.07 = 0.19 x (0.050/0.050)0.07 = 0.1900
For ze ≥ zmin:
cr (ze) = kr x ln(ze /z0) = 0.1900 x ln(11.3 / 0.050) = 1.0299

Orography factor
c0 (ze) = 1.0

Mean Wind Velocity


vm(ze) = cr(ze) x c0(ze) x vb = 1.0299 x 1.000 x 38.00m/s = 39.14m/s

Wind turbulence
For ze ≥ zmin:
Iv(ze) = kI / [ c0(ze) x ln(ze / z0) ] = 1.000 / [ 1.000 x ln(11.3 m / 0.050 m) ] = 0.1845
Turbulence factor, kI = 1.00

Basic velocity pressure


qb = (1/2) x p x vb2 = (1/2) x 1.25 x (38.00 m/s) = 0.902 kN/m
Peak velocity pressure
qp(ze) = (1 + 7 x Iv(ze)) x (1/2) x p x vm (ze)2 = (1 + 7 x 0.1845) x (1/2) x 1.25 x 39.14 = 2.193 kN/m2
Exposure factor, ce (ze)
ce(ze) = qp(ze) / qb = 2.193 kN/m2 / 0.902 kN/m2 = 2.4305

Wind Force
Wind force, Fw = cscd x cf x qp(ze) x Aref
Structural factor, cscd = 1.00
Force coefficient, cf = 1.80
Fw = 1 x 1.8 x 2.193x 1.44 = 5.686kN

Screen Unit
Width, b = 1.03m
Height, h = 1.3m
Zg = 6.72m

Calculation of Peak Velocity Pressure


Reference area and height
Ze = 6.72 + 1.3/2 = 7.3m
Aref = 1.03 x 1.3 = 1.34m2
cr (ze) = 0.1900 x ln(7.37 / 0.050) = 0.9487

Mean Wind Velocity


vm(ze) = 0.9487 x 1.000 x 38.00m/s = 36.05m/s

Wind turbulence
For ze ≥ zmin:
Iv(ze) = 1.000 / [ 1.000 x ln(7.37 m / 0.050 m) ] = 0.2003

Basic velocity pressure


qb = (1/2) x 1.25 x (38.00 m/s) = 0.902 kN/m

Peak velocity pressure


qp(ze) = (1 + 7 x 0.2003) x (1/2) x 1.25 x 36.05 = 1.951 kN/m2
Exposure factor, ce (ze)
ce(ze) = 1.951 kN/m2 / 0.902 kN/m2 = 2.1618
Wind Force
Fw = 1 x 1.8 x 1.951x 1.34 = 4.702kN

Analysis with StaadPro v8i design package

You might also like