Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification,
including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of
21 sides and bottom and backfilling with approved material as per approved drawing or as directed by the Engineer-in-
Charge.

1 Escape Hoist Platform Aks Volume 1 132.3+119.35/2 3.70 465.55


2 Road Bridge Aks Volume 1 227.32+209.47/2 3.70 808.06
3 Aks Volume Of D/S Wing Wall & Return Wall 2 584.03+476.19/2 3.80 4028.83
4 Aks Volume Of U/S Wing Wall &Return Wall 2 75.19+75.69/2 3.00 452.64
Aks Volume For Cross Regulator Abutment
2 Hoist 2 38.36+32.06/2 3.60 253.51
Aks Volume For Cross Regulator Abutment
3 Road Bridge 2 73.29+63.84/2 3.60 493.67
Aks Volume Of R/S D/S Wing Wall & Return Of
5 Cr 1 149.35+131.5/2 3.60 505.53
Aks Volume Of R/S U/S Wing & Return Wall Of
6 Cr 1 144.44+125.29/2 3.60 485.51

7 Aks Volume D/S L/S Wing & Return Wall Of Cr 1 149.35+131.5/2 3.60 505.53
8 Tail channel Qty 200.00 (44.7+35.7)/2 3.00 24120.00
TOTAL 32118.83

Excavation in ordinary rock without blasting for foundations of canal cross drainage and other
22 appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off
the same as directed, as per approved drawing or as directed by the Engineer-in-Charge.

1 Escape Hoist Platform Hdr Volume 1 119.35+89.25/2 8.60 896.98


2 Road Bridge Hdr Volume 1 209.47+164.32/2 8.60 1607.29

3 Hdr Volume Of D/S Wing & Return Wall Escape 2 476.19+142.19/2 7.00 4328.66
Hdr Volume Of U/S Wing & Return Wall
4 Escape 2 75.19+120.8/2 7.10 1391.53
1 Hdr Volume For Cr Abutment Hoist 2 24.5+32.06/2 4.32 244.34
2 Hdr Volume For Cr Road Bridge Above (Cbl) 2 52.5+63.84/2 4.32 502.59
3 Hdr Volume For Cr Below Cbl Hoist 2 3.50 10.20 4.18 298.45
Hdr Volume Cr Abutnent Below Cbl Road
4 Bridge 2 5.25 12.70 4.18 557.40
6 Middle Pier 2Nd &3Rd 2 12.25 4.90 3.44 412.97
7 End Piers 1St & 4Th Road Bridge 2 7.00 4.60 3.44 221.54
8 End Piers 1St &4Th Hoist Platform 2 3.50 4.20 3.44 101.14
9 End Piers 1St &4Th Cut Water Portion 2 1.85 4.90 3.44 62.37
Cr Hdr Volume Of U/S R/S Wing Wall Below
10 Cbl & Return 1 31.83+15.26/2 7.90 1.50 279.01
Hdr Volume Of U/S R/S Wing Wall Above Cbl &
11 Return 1 186.00+144.44/2 7.90 4.32 713.75
Hdr Volume Of D/S R/S Wing Wall & Return
12 Below Cbl 1 14.98+32.91/2 8.60 2.38 490.10
Hdr Volume Of D/S R/S Wing Wall & Return
13 Above Cbl 1 205.93+449.35/2 8.60 4.32 767.40
Hdr Volume D/S L/S Wing & Return Wall Of Cr
14 Above Cbl 1 205.93+149.35/2 4.32 767.40
Hdr Volume Of D/S L/S Wing & Return Of Cr
15 Below Cbl 1 14.98+32.91/2 8.60 2.38 491.03
Tail channel Qty 200.00 (20.7+35.7)/2 5.00 28200.00
TOTAL 42333.95

1/14
S.NO/
BOQ NO DESCRIPTION NO.S L B D QTY

Providing & constructing Sand filling below foundations including cost of materials, machinery, labour,
S3 - 13 watering, ramming etc., complete with initial lead upto 50m and all lifts as per specifications and
approved drawing or as directed by the Engineer-in -charge.

1 Slrb Abutment sand filling 1x2 13.00 5.40 0.30 42.12


2 Hoist abutment sand filling 1x2 10.50 3.65 0.30 23.00
3 Eescape pier hoist platform portion 1 3.50 3.80 0.30 3.99
4 Pier at road bridge portion 1 5.25 4.60 0.30 7.24
5 Cut water portion 2 1.75 4.90 0.30 5.14
6 D/s r/s wings & returns sand filling 1 25.53 7.60 0.15 29.09
7 D/s l/s wing wall sand filling for foundation 1 25.53 7.60 0.15 29.09
8 U/s l/s wing wall sand filling 1 17.60 6.75 0.30 35.64
9 U/s r/s wing wall sand filling 1 31.15+19.4/2 6.90 0.30 52.31
10 D/S wings& returns sand filling 1 31.01+15.83/2 7.60 0.30 53.40
11 D/S wings& returns sand filling 1 31.01+15.83/2 7.60 0.30 53.40
12 For end piers road bridge 2 5.25 4.60 0.30 14.49
13 For end piers 1st & 4th( hoist platform) 2 3.50 4.20 0.30 8.82
14 For end piers 1st & 4th cur water portion 4 4.90 1.75 0.30 10.29
15 For middle piers 2nd &3rd 2 12.25 4.90 0.30 36.01
16 Hoist abutment of CR sand filling 2 10.50 3.65 0.30 22.99
17 Road bridge abutment of cr sand filling 2 13.00 5.40 0.30 42.12

18 Sand filling for u/s r/s wing wall & return of CR 1 29.91+16.13/2 6.90 0.30 47.65
TOTAL 516.79

Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15 n/sq mm)
grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub
23 structure/ super structure works including cost of all materials cost of all materials, machinery, labour,
formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing,
curing etc., complete for plain concrete works as per approved drawing or as directed by the Engineer-
in-Charge.
1 Slrb Abutment pcc 1x2 13.00 5.40 0.15 21.06
2 Hoist abutment pcc 1x2 10.50 3.65 0.15 11.50
3 Escape pier hoist platform portion 1 3.50 3.80 0.15 1.99
4 Road bridge portion 1 5.25 4.60 0.15 3.62
5 Cut water portion 2 1.75 4.90 0.15 2.57
((15.58+16.64)+
6 For d/s r/s wing wall 1 (7.35+11.48))/2 7.60 0.15 29.09
((15.58+16.64)+
7 For d/s l/s wing wall 1 (7.35+11.48))/2 7.60 0.15 29.09
8 U/S wings& returns rhs pcc 1x1 31.15+19.4/2 6.90 0.15 26.16
9 U/S wings lhs pcc 1x1 17.60 6.75 0.15 17.82
10 Escape u/s apron 1 14.50 (24.13+6.69)/2 0.60 134.06
11 Escape u/s apron in 0.3 meter portion 1 0.30 (6.69+6.33)/2 (.6+.75)/2 1.32
12 U/s cut off wall 1 0.60 (23.4+24.13)/2 1.06 15.11
13 U/s cut water portion in vents 2 1.00 4.50 1.59 14.28
14 Apron at hoist 2 3.50 4.50 2.33 73.39
15 Apron at slrb in 2.07m portion 2 2.07 4.50 (2.33+1.3)/2 33.81
16 Apron at slrb in 3.18m portion 2 3.18 4.50 1.30 37.21
17 D/s cut water prtion in vents 2 1.00 4.50 1.30 11.70
18 D/s apron beside cut water portion 1 1.32 (8.07+8.53)/2 1.30 14.24
19 D/s apron in middle 5m portion 1 5.00 (8.53+12.46)/2 1.05 55.10
20 D/s apron in last 5m portion 1 5.00 (12.46+16.4)/2 0.95 68.54
21 D/s cut off wall 1 0.60 20.70 2.43 30.18
22 D/s drop wall 1 4.43 (20.7+12.9)/2 0.44 32.75
23 Apron in groves portion 4 1.00 0.50 2.33 4.66
24 Slrb abutment pcc 1x2 13.00 5.40 0.15 21.06
25 Hoist abutment pcc 1x2 10.50 3.65 0.15 11.50
26 End pier 1st &4th road bridge 2 5.25 4.60 0.15 7.25
27 End piers 1st & 4th hoist platform 2 3.50 4.20 0.15 4.41
28 End piers 1st & 4th cut water portion 4 1.75 4.90 0.15 5.14

2/14
S.NO/
BOQ NO DESCRIPTION NO.S L B D QTY

29 Middle piers 2nd & 3rd 2 12.25 4.90 0.15 18.01


Leveling coarse for d/s r/s wing wall & return
30 of CR 1 31.01+15.83/2 7.60 0.15 26.70
Leveling coarse for d/s l/s wing wall & return
31 of CR 1 31.01+15.83/2 7.60 0.15 26.70
Levelling coarse for u/s r/s wing wall & return
32 of CR 1 29.91+16.13/2 6.90 0.15 23.83
33 D/s apron in last 5.6m portion 1 24.78+25.6/2 5.60 1.00 141.08
34 D/s apron in middle 5m portion 1 25.6+26.35/2 5.00 1.20 155.85
35 D/s apron in first 5m portion 1 30.50 4.18 1.80 229.48
36 D/s apron in first 5m (after slrb) 1 26.35+26.48/2 0.82 1.80 38.99
37 D/s apron in 1.07m portion slrb 1 30.50 1.07 1.8+2.33/2 67.39
38 D/s drop wall trapezium portion 1 28.80 1.40 0+0.28/2 5.64
39 D/s drop wall rectangular portion 1 28.80 0.60 0.28 4.84
40 D/s wing walls apron on rafts 2 11.42 2.00 0.50 22.84
41 D/s cut off wall 1 24.78 0.60 1.75 26.02
42 U/s apron 1 24.78+26.4/2 10.30 0.60 158.15
43 U/s cut off wall 1 24.78 0.60 1.06 15.76
44 Hoist apron 1 30.50 3.50 2.34 249.80
45 Apron in grooves portion 10 1.00 0.50 2.34 11.70
46 Pier deducation in hoist 4 3.50 2.00 2.34 -65.52
47 Pier deducation in slrb 4.18m 4 4.18 2.00 1.80 -60.19
48 Pier deducation in slrb 1.07m 4 1.07 2.00 2.34+1.8/2 -17.72
49 Pier deducation d/s cut water 4 3.142*1^2/2 1.80 -11.31
50 Pier deducation u/s cut water 4 3.142*1^2/2 2.34+2.18/2 -14.21
TOTAL 1772.43

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement
concrete using 20 mm down size approved, clean, hard, graded aggregates for Piers & Pier Foundations including cost of all
S3-9 materials, labour, machinery, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating,
finishing, curing etc., complete with initial lead upto 50 m and all lifts as per approved drawings or as directed by the Engineer-
in -charge.

1 Escape abutment l/s hoist platform 1 3.50 3+1.5/2 9.23 72.69


2 Escape abutment l/s road bridge 1 5.25 3+1.5/2 9.35 110.45
3 Escape abutment l/s grow deducation 1 -1.00 0.50 9.23 -4.62
4 Escape abutment r/s hoist platform 1 3.50 3+1.5/2 9.23 72.69
5 Escape abutment r/s road bridge 1 5.25 3+1.5/2 9.35 110.45
6 Escape abutment r/s grow deducation 1 -1.00 0.50 9.23 -4.62
7 U/s r/s wing & return wall of escape 1 26.83 1+0.5/2 7.81 157.16
8 U/s l/s wing wall return wall of escape 1 17.27+6.77/2 1+.5/2 7.81 70.41
9 D/s l/s wing & return wall of escape 1 27.53 .5+1.3/2 8.70 215.56
10 D/s r/s wing wall return of escape 1 27.53 0.5+1.3/2 8.70 215.56
11 U/s r/s wing wall raft of escape 1 13.15+19.4/2 6.60 1.00 166.81
12 U/s l/s wing wall raft of escape 1 17.28 6.60 1.00 114.05
13 D/s l/s wing wall raft 1 25.23 7.30 1.00 184.14
14 D/s r/s wing wall raft 1 25.23 7.30 1.00 184.14
15 L./s abutment raft hoiest 1 10.20 3.50 1.50 53.55
16 L/s abutment raft road bridge 1 12.70 5.25 1.50 100.01
17 R/s abutment raft hoiest 1 10.20 3.50 1.50 53.55
18 R/s abutment raft road bridge 1 12.70 5.25 1.50 100.01
19 pier raft in hoist portion 1 3.50 3.80 0.60 7.98
20 pier raft in road bridge portion 1 5.25 4.60 0.60 14.49
21 pier raft in cut water portion 2 1.60 4.60 0.60 8.83
22 pier wall slrb sub structure 1x1 5.25 2.00 9.23 96.92
23 pier wall hoist up to chamber 1x1 3.50 2.00 9.35 65.45
24 Round coaping 1x1 3.142x1^2x7.23 22.71
25 hoist abutment 1x2 3.50 1.13 6.80 53.55
26 pier wall chamber to hoist 1x1 3.50 1.25 6.80 29.75
27 L/s abutment of CR hoist raft 1 10.20 3.50 1.50 53.55
28 L/s abutment of CR raft road bridge 1 12.70 5.25 1.50 100.01
29 R/s abutment of CR raft hoist raft 1 10.20 3.50 1.50 53.55

3/14
S.NO/
BOQ NO DESCRIPTION NO.S L B D QTY

30 R/s abutment of CR road bridge raft 1 12.70 5.25 1.50 100.01


31 CR l/s d/s wing & return wall raft 1 23.27 7.30 1.00 169.87
32 CR r/s u/s wing wall & return raft 1 22.86 6.60 1.00 150.88
33 CR r/s d/s wing wall & return raft 1 23.27 7.30 1.00 169.87
34 CR l/s abutment hoist walls 1 3.50 2.25 9.23 72.69
35 CR l/s road bridge abutment wall 1 5.23 2.25 9.35 110.03
36 CR l/s abutment grow deducation 1 -1.00 0.50 9.23 -4.62
37 CR r/s abutment hoist wall 1 3.50 2.25 9.23 72.69
38 CR r/s abutment road bridge walls 1 5.25 2.25 9.35 110.45
39 CR r/s abutment grow deducation 1 -1.00 0.50 9.23 -4.62
40 CR pier 1 raft at hoist plaform 1 3.50 4.20 0.60 8.82
41 CR pier 1 raft at road & d/s cut water 1 6.85 4.60 0.60 18.91
42 CR pier 1 raft at cut water u/s 1 1.60 4.60 0.60 4.42
43 CR PIER 2 raft 1 11.95 4.60 0.60 32.98
44 CR pier 3 raft 1 11.95 4.60 0.60 32.98
45 CR pier 4 raft at hoist platform 1 3.50 4.20 0.60 8.82
46 CR pier 4 raft at road& d/s cut water 1 6.85 4.60 0.60 18.91
47 CR pier 4 raft at u/s cut water 1 1.60 4.60 0.60 4.42
48 Piers walls under slrb 4 5.25 2.00 9.23 387.66
49 Piers walls undar chamber 4 3.50 2.00 9.35 261.80
50 Coaping 1x4 3.142x1^2x7.23 90.85
51 Abutment hoist super structure 2 3.50 1.13 6.80 53.55
52 Piers hoist tantetive super structure 4 3.50 1.25 6.80 119.00
53 CR u/s r/s wing and return wall 1 24.58 0.75 7.82 144.08
54 CR d/s l/s & r/swing and return wall 2 25.58 0.90 8.70 400.69
TOTAL 5013.90

Providing and laying insitu vibrated M-25 (28 days cube compressive strength not less than 25 N / sq mm)
grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for
25 columns and beams including cost of all materials, machinery, labour, formwork, centering,
scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.
complete for as per approved drawing or as directed by the Engineer-in-Charge.

1 Slrb slab 1x2 5.25 6.50 0.40 27.30


2 Abutment bed block slrb 1x2 5.25 1.50 0.30 4.73
3 dirt wall 1x2 5.25 0.50 0.48 2.49
4 pier bed block 1x1 5.25 2.00 0.30 3.15
5 Slrb slab 1x5 5.25 6.50 0.40 68.25
6 Abutment bed block 1x2 5.25 1.50 0.30 4.73
7 Abutment dirt wall 1x2 5.25 0.50 0.48 2.49
8 Pier bed block 1x4 5.25 2.00 0.30 12.60
125.74

Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade
cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of
all materials,machinery, labour, formwork, scaffolding,leaning, batching,mixing, placing in position, levelling, vibrating,
S6-2
finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 380 kg / cum with use of super
plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--65:35, FA : 0.46 cum) If water is to be brought
from other place add only lead charges @ 500 ltr /cum.

1 Slrb slab crush barrior 1x2 15.00 0.40 0.35 4.20


2 Slrb slab sidde walls 1x2 15.00 0.18 0.75 3.94
3 Gates grove concrete abutment 1x2 0.53 0.15 9.35 1.47
4 Gates grove concrete abutment 1x2 0.53 0.26 9.35 2.55
5 Gates grove concrete abutment 1x2 1.00 0.15 9.35 2.81
6 Gates grove concrete pier 1x2x2 0.52 0.15 9.35 2.92
7 Gates grove concrete pier 1x2x2 0.52 0.26 9.35 5.09
8 Gates grove concrete pier 1x2x2 1.00 0.15 9.35 5.61
9 Gates grove concrete pier 1x2x2 1.00 0.15 6.80 4.08
10 Slrb slab crush barrier 1x2 32.50 0.40 0.35 9.10
11 Slrb slab crush barrier side walls 1x2 32.50 0.18 0.75 8.53
12 Gates grove concrete abutment 1x2 0.53 0.15 9.35 1.47
13 Gates grove concrete abutment 1x2 0.52 0.26 9.35 1.27

4/14
S.NO/
BOQ NO DESCRIPTION NO.S L B D QTY

14 Gates grove concrete abutment 1x2 1.00 0.15 9.35 1.40


15 Gates grove concrete pier 1x4x2 0.53 0.15 9.35 5.89
16 Gates grove concrete pier 1x4x2 0.53 0.26 9.35 10.21
17 Gates grove concrete pier 1x4x2 1.00 0.15 9.35 11.22
18 Gates grove concrete pier 1x4x2 1.00 0.15 6.80 8.16
TOTAL 89.92

Providing and laying insitu vibrated M-30 ( 28 days cube compressive strength not less than 30 N / sq mm )
grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for
S3-12 Wearing Coat including cost of all materials, machinery, labour, formwork, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead
upto 50 m and all lifts as per specifications and approved drawing or as directed by the Engineer-in
-charge.
1 slrb slab wearing coat 1x2 4.25 6.50 0.08 4.14
2 Slrb slab wearing coat 1x5 4.25 6.50 0.08 10.36
TOTAL 14.50

Providing and laying insitu vibrated M-30 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade
cement concrete using 20 mm down size approved, clean, hard, graded aggregates for Piers & Pier Foundations including
S6-1
cost of all materials, labour, machinery, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling,
vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.

1 Aproch slab 1x2 5.25 3.50 0.15 5.51


2 Aproach slab 1x2 5.25 3.50 0.15 5.51
TOTAL 11.02
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm )
grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for
S3-10 Wearing Coat including cost of all materials, machinery, labour, formwork, scaffolding, cleaning,
batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead
upto 50 m and all lifts as per specifications and approved drawing or as directed by the Engineer-in
-charge.
1 Escape u/s wearing coat 1 28.8+11.00/2 14.50 0.15 43.28
2 Escape d/s wearing coat 1 20.7+11/2 12.72 0.15 30.24
3 Drop wall wearing coat d/s 1 20.70 0.60 0.15 1.86
4 Escape slrb portion wearing coat 2 5.25 4.50 0.15 7.08
5 Pier deducation CR of wearing coat 8 3.142*1^2/2 0.15 -1.88
6 hoist under wearing coat 1x2 3.50 4.50 0.15 4.73
7 CR u/s wearing coat 1 28.8+30.5/2 10.30 0.15 45.81
8 CR d/s wearing coat 1 28.8+30.5/2 11.42 0.15 50.79
9 CR slrb portion wearing coat 1 30.50 5.25 0.15 24.01
10 CR pier deducation in slrb portion 4 5.25 2.00 0.15 -6.30
11 CR pier deducation u/s d/s cut water 8 3.142*1^2/2 0.15 -1.88
12 Hoist under wearing coat 1x5 3.50 4.50 0.15 11.81
TOTAL 209.55

Providing and laying insitu M-35 (28 days cube compressive strength not less than 30 N / sqmm) grade
cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat
27 including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in
position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar
etc., complete as per approved drawing or as directed by the Engineer-in-Charge

1 Aproach slab wearing coat 1x2 5.25 4.00 0.08 3.15


2 Aproach slab wearing coat 1x2 5.25 4.00 0.08 3.15
TOTAL 6.30

28 Supply of expansion joint filler board conforming to IS: 1838 for buildings, columns, beams and slabs
20 mm Thick as per approved drawing or as directed by the Engineer-in-Charge.

1 slrb slab portion 1x3 5.25 0.48 7.48


2 Slrb slab portion 1x6 5.25 0.48 14.96
TOTAL 22.44
Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all materials,
33 labour, drilling 8 mm dia holes etc. complete with all leads and lifts as per approved drawing or as
directed by the Engineer-in-Charge.

5/14
S.NO/
BOQ NO DESCRIPTION NO.S L B D QTY

1 D/s l/s wing & return wall 1 40.00 40.00


2 D/s r/s wing amd return wall 1 40.00 40.00
3 U/s r/s wing & return wall 1 42.00 42.00
4 U/s l/s wing return wall 1 4.00 4.00
5 D/s wing & return portion 2 42.00 84.00
6 U/s wing & return portion rhs 1 42.00 42.00
TOTAL 252.00

35 Supply and providing of 310 mm wide PVC water stopper including cost of all materials and labour
charges etc complete as per approved drawing or as directed by the Engineer-in-Charge.
1 slrb abutment & hoist abutment 1x2 6.55 13.10
2 Slrb abutment & hoist abutment 1x2 6.55 13.10
TOTAL 26.20

Providing Semi- pervious/ pervious casing hearting embankment using soil collected from heaps in
embankment area as a part of disposal of excavated soil from canal including cost of all materials,
7 machinery labour, all operations such as excavation, sorting out, transportation, spreading in layers of
25 cm before compaction , breaking clods, sectioning, watering and compacting each layer to density
control of not less than 98 percent or stipulated by the sheep foot roller/ Vibratory roller 8 to 10 tone
power roller etc. complete as per approved drawing or as directed by the Engineer-in-Charge.

1 Under aproach slab gravel filling 1x2 3.50 5.25 0.23 8.27
2 Under aproach slab gravel filling 1x2 3.50 5.25 0.23 8.27
3 Road bridge aproaches of c.r 1x2 5.25 19+8.5/2 9.22 1331.14
4 Road bridge aproaches of c.r 1X2 5.25 2+0.5/2 1.00 13.13
5 Road bridge aproaches of escape 2 5.25 19+8.5/2 9.22 1331.14
6 Road bridge aproaches of escape 2 5.25 2+0.5/2 1.50 19.69
s TOTAL 2711.63
Supply and providing of Drainage spouts including cost of all materials and labour charges etc complete
30 as per approved drawing or as directed by the Engineer-in-Charge.

1 Slrb bridge slab portion 1x2 4.00 8.00


2 Slrb bridge slab portion 1x5 4.00 20.00
TOTAL 28.00

6/14
DETAILED MEASUREMENT

BOQ Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting,
No.29 bending, hooking, lapping, welding wherever required, tying with 1.25 mm dia soft annealed steel wire, including cost of all
materials, machinery, labour etc., complete with initial lead upto 50 and all lifts as per approved drawing or as directed by the
Engineer-in-Charge.

UNIT TOTAL
S.NO DESCRIPTION DIA SPACING NO.S LENGTH
WEIGTH WEIGTH
54.275@ ESCAPE CUM CR
Escape Abutment hoist steel
1 Abutment hoist raft bottum main bars lhs 25mm 135mm 1x2x27 6.85 3.85 1424.12
2 Raft bottum mate main bars rhs 16mm 125mm 1x2x29 6.85 1.58 627.73
3 Raft bottum mat distributers 16mm 125mm 1x2x83 5.20 1.58 1311.40
4 Raft top mat distributers 16mm 125mm 1x2x83 5.20 1.58 1311.40
5 Raft top mate main bars 16mm 110mm 1x2x33 11.70 1.58 1220.08
9 Abutment hoist inner side verticle main bars 16mm 100mm 1x2x36 12.85 1.58 1461.82
10 Hoist inner side verticle disributors 16mm 100mm 1x2x110 4.45 1.58 1546.82
11 Hoist outer side varticle main bars up to 110.350 25mm 125mm 1x2x29 8.00 3.85 1786.40
12 Hoist outer side varticle main bars 110.350 to 115.354 25mm 250mm 1x2x15 5.20 3.85 600.60
13 Hoist outer side verticle disributors 16mm 100mm 1x2x116 4.40 1.58 1612.86
14 Hoist side verticle bars 16mm 100mm 1x2x31x2 11.90 1.58 2331.45
15 Hoist side disributors 16mm 100mm 1x110x2x2 2.15 1.58 1494.68
16 Abutment hiost plate form outer verticle main bars 16mm 150mm 1x25x2 9.00 1.58 711.00
17 Abutment hiost plate form inner verticle main bars 16mm 150mm 1x25x2 8.80 1.58 695.20
18 Abutment hoist plate form inner side distributors 16mm 150mm 1x47x2 9.74 1.58 1446.58
19 Abutment hoist plate form outer side distributors 16mm 150mm 1x42x2 7.10 1.58 942.31
20 Abutment hoist sides verticle bars 16mm 150mm 1x7x2x2 7.10 1.58 314.10
21 Abutment hoist sides verticle distributors 16mm 150mm 1x45x2x2 0.92 1.58 261.65
Escape Abutment slrb bridge steel
1 Abutment slrb raft bottum main bars lhs 25mm 125mm 1x2x43 6.45 3.85 2135.60
2 Abutment slrb raft bottum main bars rhs 16mm 125mm 1x43x2 9.75 1.58 1324.83
3 Slrb raft bottum mat distributors 16mm 125mm 1x103x2 6.75 1.58 2196.99
4 Slrb raft top mat main bars 16mm 110mm 1x49x2 15.00 1.58 426.60
5 Slrb raft top mat distributors 16mm 125mm 1x103x2 6.75 1.58 2196.99
6 Slrb inner side verticle main bars 20mm 200mm 1x2x28 12.73 2.47 1760.81
7 Slrb inner side verticle disributors 20mm 200mm 1x2x55 5.15 2.47 1399.26
8 Slrb outer side vertical main bars up to 110.350 25mm 125mm 1x2x43 8.00 3.85 2648.80
9 Slrb outer side varticle main bars 110.350 to 114.579 25mm 250mm 1x2x22 4.73 3.85 764.84
10 Slrb outer side verticle disributors 20mm 200mm 1x2x55 6.25 2.47 1698.13
11 Slrb side verticle main bars 20mm 200mm 1x15x2 12.73 2.47 943.29
12 Slrb side distributors 20mm 200mm 1x55x2 2.15 2.47 584.16
Escape Pier steel
1 pier foundation raft bottum &top main bars 16mm 125mm 1x2x97 5.10 1.58 1563.25
2 pier raft top & bottum distributors 12mm 250mm 1x2x20 12.45 0.89 443.22
3 pier varticle main bars up to 114.700 25mm 150mm 1x131 11.80 3.85 5951.33
4 water cutter verticle bars up to fsl 25mm 150mm 1x38 8.80 3.85 1287.44
5 pier distributors up to fsl 10mm 300m 1x28 28.10 0.62 487.82
6 pier hoist & slrb side verticle main bars 25mm 150mm 1x2x14 3.50 3.85 377.30
7 pier hoist & slrb side verticle distributor bars 10mm 300mm 1x8 23.50 0.62 116.56
8 pier hoist plate form verticles bars 25mm 300m 1x42 8.80 3.85 1422.96
9 pier hoist plate form distributors 10mm 300mm 1x24 10.38 0.62 154.45
10 piers hoist plate form sides verticle main bars 25mm 300m 1x8x2 8.80 3.85 542.08
11 piers hoist plate form sides verticle distributor bars 10mm 300mm 1x24x2 0.92 0.62 27.38
Escape D/S wings & returns steel

7/14
UNIT TOTAL
S.NO DESCRIPTION DIA SPACING NO.S LENGTH
WEIGTH WEIGTH
1 D/s wings & returns raft bottum mat main bars lhs 20mm 150mm 1x217x2 4.20 2.47 4502.32
2 Raft bottum mat main bars rhs 12mm 125mm 1x159x2 5.63 0.89 1591.99
3 Raft bottum mat distributors 12mm 125mm 1x60x2 27.39 0.89 2876.50
4 Raft top mat main bars 20mm 120mm 1x243x2 8.20 2.47 9843.44
5 Raft top mat distributors 12mm 125mm 1x59x2 27.39 0.89 2876.50
6 Wings & returns inner side verticle main bars 12mm 125mm 1x232x2 11.10 0.89 4583.86
7 Wings & returns inner side verticle distributors 12mm 125mm 1x79x2 29.40 0.89 4134.23
8 Wings & returns outer side verticle main bars 25mm 125mm 1x215x2 11.50 3.85 19038.25
9 Wings & returns outer side verticle distributors 12mm 125mm 1x2x79 27.50 0.89 3867.05
10 Side verticle bars 12mm 125mm 1x12x2x2 11.10 0.89 474.19
11 Side distributors 12mm 125mm 1x79x2x2 0.80 0.89 224.99
Escape U/S R/S wings& returns steel
1 U/s r/s wings&returns raft bottam mat main bars lhs 20mm 150mm 1x208x1 4.30 2.47 2209.17
2 U/s r/s wings&returns raft bottam mat main bars rhs 12mm 125mm 1x1x154 5.00 0.89 685.30
3 U/s r/s wings&returns raft bottam distributors 12mm 125mm 1x54 26.10 0.89 1254.37
4 U/s r/s wings&returns raft top mat main bars 20mm 150mm 1x168 7.60 2.47 3153.70
5 U/s r/s wings&returns raft top mat distributors 12mm 125mm 1x54 26.10 0.89 1254.37
6 U/s r/s wings&returns inner side verticle main bars 12mm 125mm 1x221 10.30 0.89 2025.91
7 U/s r/s wings&returns inner side distributors 12mm 125mm 1x72 28.40 0.89 1819.87
8 U/s r/s wings&returns outer side verticle main bars 25mm 125mm 1x208x1 10.30 3.85 8089.62
9 U/s r/s wings&returns outer side distributors 12mm 125mm 1x74 26.70 0.89 1758.46
10 Side verticle bars 12mm 125mm 1x10x2 10.30 0.89 183.34
11 Side distributors 12mm 125mm 1x74x2 1.30 0.89 171.24
Escape U/S L/S wings& returns steel
1 U/s lhs wing wall raft bottam mat main bars lhs 20mm 150mm 1x117 4.30 2.47 1242.66
2 U/s lhs wing wall raft bottam mat main bars rhs 12mm 125mm 1x140 5.00 0.89 623.00
3 Raft bottum mat distributors 12mm 125mm 1x54 18.50 0.89 889.11
4 Raft top mat main bars 20mm 150mm 1x115 7.50 2.47 2130.38
5 Raft top mat distributors 12mm 125mm 1x54 18.50 0.89 889.11
6 Inner side verticle main bars sloped portion 12mm 125mm 1x84 4.80 0.89 358.85
7 Inner side verticle distributors sloped portion 12mm 125mm 1x72 5.25 0.89 336.42
8 Outer side varticle main bars bars sloped portion 25mm 125mm 1x84 4.80 3.85 1552.32
9 Outer side varticle destributors sloped portion 12mm 125mm 1x72 5.25 0.89 336.42
10 Inner side verticle main bars strighte portion 12mm 125mm 1x57 10.10 0.89 512.37
11 Inner side verticle distributors strighte portion 12mm 125mm 1x72 7.50 0.89 480.60
12 Outer side varticle main bars strighte portion 25mm 125mm 1x57 10.20 3.85 2238.39
13 Outer side varticle distributor strighte portion 12mm 125mm 1x72 7.50 0.89 480.60
14 Side verticle bars 12mm 125mm 1x8 10.10 0.89 71.91
15 Side distributors 12mm 125mm 1x72 0.65 0.89 41.65
16 D/s drope wall rings 12mm 200mm 1x105 3.40 0.89 317.73
17 D/s drope wall main bars 12mm 200mm 1x16 17.20 0.89 244.93
Escape SLRB bridge steel
1 Slrb abutment bed block 2 legged rings 12mm 150mm 1x35x2 3.80 0.89 236.74
2 Bed block main bars 16mm 1x10x2 5.15 1.58 162.74
3 Dirt wall 2legged rings 12mm 150mm 1x35x2 2.50 0.89 155.75
4 Dirt wall main bars 12mm 125mm 1x2x9 5.15 0.89 82.50
5 Pier bed block master ring 12mm 150mm 1x35 4.60 0.89 143.29
6 Pier bed block distributor ring 12mm 150mm 1x35 2.60 0.89 80.99
7 Pier bed block main bars 12mm 1x16 5.15 0.89 73.34
8 Aproch slab bottum & top main bars 12mm 150mm 1x35x2x2 3.40 0.89 423.64
9 Aproch slab top & bottum distributors 12mm 150mm 1x23x2x2 5.15 0.89 421.68
10 Slrb slab bottum main bars 20mm 200mm 1x28x2 6.80 2.47 940.58
11 Slrb slab bottum distributors 12mm 200mm 1x34x2 5.15 0.89 311.68

8/14
UNIT TOTAL
S.NO DESCRIPTION DIA SPACING NO.S LENGTH
WEIGTH WEIGTH
12 Slrb slab top main bars 12mm 300mm 1x19x2 6.80 0.89 229.98
13 Slrb slab top distributors 12mm 300mm 1x23x2 5.15 0.89 210.84
14 Crush barriar stirrups 10mm 200mm 1x66x2 2.10 0.62 171.86
15 Parepet walls stirrups 10mm 200mm 1x66x2 3.30 0.62 270.07
16 Cranck bars 10mm 200mm 1x66x2 1.30 0.62 106.39
17 Outer side distributors 10mm 200mm 1x7x2 13.00 0.62 112.84
18 Inner side distributors 10mm 200mm 1x8x2 13.00 0.62 64.48
CR Abutment hoist raft steel
1 Hoist raft bottum main bars lhs 25mm 135mm 1x27x2 6.85 3.85 1424.12
2 Bottum mat main bars rhs 16mm 125mm 1x29x2 5.00 1.58 458.20
3 Bottum mat Distributors 16mm 125mm 1x82x2 5.00 1.58 1295.60
4 Top mat distributors 16mm 125mm 1x82x2 5.00 1.58 1295.60
5 Top mat main bars 16mm 110mm 1x33x2 11.70 1.58 1220.08
6 Inner side verticle main bars 16mm 100mm 1x36x2 11.25 1.58 1279.80
7 Inner side Distributors 16mm 100mm 1x110x2 4.45 1.58 1546.82
8 Outer side verticle bars up to 110.350 25mm 125mm 1x29x2 8.50 3.85 1898.05
9 Outer side verticle bars up to 115.354 25mm 250mm 1x15x2 5.10 3.85 589.05
10 Outer side Distributors 16mm 100mm 1x117x2 4.50 1.58 1663.74
11 Side verticle bars 16mm 100mm 1x31x2x2 11.30 1.58 2213.90
12 Side distributors 16mm 100mm 1x110x2x2 3.00 1.58 2085.60
13 Abutment hoist verticle main bars 114 .700 to 121.500 16mm 150mm 1x61x2 8.80 1.58 1696.29
14 Abutment hoist distributor bars 114 .700 to 121.500 16mm 150mm 1x47x2 9.74 1.58 1446.58
15 Abutment hoist plate form side verticles 16mm 150mm 1x7x2x2 8.30 1.58 367.19
16 Abutment hoist plate form side destributors 16mm 150mm 1x46x2x2 1.70 1.58 494.22
CR Abutment road bridge raft steel
1 Slrb bridge abutment raft bottum main bars lhs 25mm 125mm 1x44x2 6.45 3.85 2185.26
2 Abtment raft bottum main bars rhs 16mm 125mm 1x44x2 9.75 1.58 1355.64
3 Bottum mat distributors 16mm 125mm 1x103x2 6.75 1.58 2196.99
4 Top mat main bars 16mm 110mm 1x49x2 15.00 1.58 2322.60
5 Top mat distributors 16mm 125mm 1x103x2 6.75 1.58 2196.99
6 Inner side verticle main bars 20mm 200mm 1x27x2 12.10 2.47 1613.90
7 Iinner side distributors 20mm 200mm 1x54x2 7.20 2.47 1920.67
8 Outer side verticlemain bars up to 110.35 25mm 125mm 1x43x2 6.20 3.85 2052.82
9 Outer side verticle main bars up to 114.549 25mm 250mm 1x22x2 4.93 3.85 797.18
10 Outer side distributors 20mm 200mm 1x55x2 7.20 2.47 2134.08
11 Side verticle main bars 20mm 200mm 1x16x2 12.10 2.47 956.38
12 Side distributors 20mm 200mm 1x55x2 3.00 2.47 815.10
CR Pier raft steel
1 Pier raft bottum & top main bars 16mm 125mm 1x96x2x4 5.12 1.58 6212.81
2 Pier raft bottum & top distibutors 16mm 250mm 1x19x2x4 12.45 1.58 2989.99
3 Pier varticle main bars up to FSL 25mm 150mm 1x131x4 10.80 3.85 21787.92
4 Pier water cutter varticle bars up to FSL 25mm 150mm 1x38x4 8.80 3.85 5149.76
5 Pier distributors up to FSL 10mm 300mm 1x27x4 25.56 0.62 1711.50
6 Pier verticle bars FSL TO 114.7 25mm 150mm 1x159x4 2.20 3.85 5386.92
7 Pier distributor bars FSL TO 114.7 10mm 300mm 1x9x4 22.30 0.62 497.74
8 Pier hoist verticle main bars 114 .7 to 121.5 25mm 300 mm 1x30x4 8.80 3.85 4065.60
9 Pier hoist distributor bars 114 .7 to 121.5 10mm 300mm 1x24x4 10.30 0.62 613.06
10 Pier verticle bars sides FSL TO 114.7 25mm 150mm 1x14x2x4 2.70 3.85 1164.24
11 Pier verticle distributor bars sides FSL TO 114.7 10mm 300mm 1x8x2x4 2.40 0.62 95.23
12 Pier hoist side verticles 25mm 300mm 1x4x2x4 8.30 3.85 1022.56
13 Pier hoist side distributors 10mm 300mm 1x24x4x2 1.40 0.62 166.66
CR Road bridge slab steel

9/14
UNIT TOTAL
S.NO DESCRIPTION DIA SPACING NO.S LENGTH
WEIGTH WEIGTH
1 SLRB bridge slab bottum main bars 20mm 200mm 1x27x5 6.80 2.47 2267.46
2 SLRB bridge slab bottum distributors bars 12mm 200mm 1x33x5 5.57 0.89 817.95
3 SLRB bridge slab top main bars 12mm 300mm 1x23x5 6.80 0.89 574.94
4 SLRB bridge slab top distributor bars 12mm 300mm 1x22x5 5.60 0.89 548.24
5 Crush barriors stirrups 10mm 200mm 1x165x2 2.10 0.62 169.26
6 Parapet walls rings 10mm 200mm 1x165x2 3.30 0.62 675.18
7 Parapet walls cranck bars 10mm 200mm 1x165x2 1.10 0.62 225.06
8 Crash barriors inner main bars 10mm 200mm 1x7x2x5 32.50 0.62 1410.50
9 Crush barriors outer main bars 10mm 200mm 1x7x2x5 32.50 0.62 1410.50
10 C.R abutment bed bolck 2- legged stirrups 12mm 150mm 1x35x2 3.70 0.89 230.51
11 C R abutment bed block main bars 16mm 1x10x2 5.15 1.58 162.74
12 C.R abutment dirt wall 2- legged stirrups 12mm 150mm 1x35x2 2.35 0.89 146.41
13 C R abutment dirt wall main bars 12mm 150mm 1x9x2 5.15 0.89 82.50
14 Pier bed block 4- legged 1st stirrups 12mm 150mm 1x35x4 4.84 0.89 603.06
15 Pier bed block 2nd stirrups 12mm 150mm 1x35x4 2.60 0.89 323.96
16 Pier bed block main bars 16mm 1x16x4 5.15 1.58 520.77
17 Aprouch slab bottum &top main bars 12mm 150mm 1x35x2x2 3.40 0.89 423.64
18 Aprouch slab top & bottum distributors 12mm 150mm 1x23x2x2 5.15 0.89 421.68
CR D/S wings & returns raft steel
1 D/s wings& returns raft bottum mat main bars lhs 20mm 150mm 1x206x2 4.60 2.47 4681.14
2 Raft bottum mat main bars rhs 12mm 125mm 1x137x2 5.63 0.89 1371.71
3 Wings & returns bottum mat distributors 12mm 125mm 1x60x2 27.20 0.89 2904.96
4 D/s wings& returns raft top mat main bars 20mm 125mm 1x192x2 8.20 2.47 7777.54
5 Raft top mat distributors 12mm 125mm 1x60x2 27.20 0.89 2904.96
6 D/S wings & returns inner side varticle bars 12mm 125mm 1x215x2 10.50 0.89 4018.35
7 D/S wings & returns inner side disributor bars 12mm 125mm 1x80x2 27.00 0.89 3844.80
8 D/S wings & returns outer side varticle bars 25mm 125mm 1x197x2 11.40 3.85 17292.66
9 D/S wings & returns outer side distributor bars 12mm 125mm 1x80x2 25.30 0.89 3602.72
10 Side verticle bars 12mm 125mm 1x8x2 10.50 0.89 149.52
11 Side distributors bars 12mm 125mm 1x80x2 0.80 0.89 113.92
CR U/S R/S wings & returns raft steel
1 U/s rhs wings & returns raft bottum main bars lhs 20mm 150mm 1x198 4.40 2.47 2151.86
2 U/s rhs wings & returns raft bottum main bars rhs 12mm 125mm 1x127 5.00 0.89 565.15
3 U/s rhs wings & returns raft bottum mat distributors 12mm 125mm 1x54 24.20 0.89 1163.05
4 Raft top mat main bars 20mm 150mm 1x154 7.50 2.47 2852.85
5 Raft top mat distributors 12mm 125mm 1x54 24.20 0.89 1163.05
6 Inner side verticle main bars 12mm 125mm 1x206 10.50 0.89 1925.07
7 Inner side distributor bars 12mm 125mm 1x72 26.75 0.89 1714.14
8 Outer side varticle main bars 25mm 125mm 1x188 10.50 3.85 7599.90
9 Outer side distributors bars 12mm 125mm 1x72 25.75 0.89 1627.14
10 Side verticle bars 12mm 125mm 1x8x2 10.50 0.89 149.52
11 Side distributor bars 12mm 125mm 1x72x2 0.75 0.89 96.12
12 D/s drope wall stirrups 12mm 150mm 1x205 3.60 0.89 656.82
13 D/s drope wall distributors 12mm 150mm 1x26 29.50 0.89 682.63
Total (Kg) 319529.00

10/14
ESCAPE KM 54.275 ABSTRUCT
S.NO/ BOQ. NO DESCRIPTION OF ITEM UNIT QUANTITY
21 AKS CUM 5755.08
22 HDR CUM 8224.46
S3-13 SAND FILLING CUM 227.67
23 CC M15 40 MSA CUM 669.25
S3-9 M20 20 MSA CUM 2271.66
S6-2 M25 20 MSA CUM 43.03
25 M25 20 MSA CUM 27.3
26 M30 20 MSA CUM 5.51
S3-12 M30 20 MSA WEARING COAT CUM 4.14
S3-10 M20 20 MSA WEARING COAT CUM 85.31
27 M35 20 MSA WEARING COAT CUM 3.15
28 MASTIC PADS SQM 7.48
33 WEEP HOLES NO.S 126
35 WATER STOPER RMT 13.1
30 DRAINAGE SPOTS NO.S 8
KRAFT PAPER SQM 21
7 BACK FILLING CUM 8634.77
32 APROACH SLABS UNDER GRAVEL FILLING CUM 8.27
29 STEEL KGS 145116.94

C.R CUM ESCAPE KM 54.275 ABSTRUCT


S.NO/ BOQ. NO DESCRIPTION OF ITEM UNIT QUANTITY
21 AKS CUM 32118.83
22 HDR CUM 42333.95
S3-13 SAND FILLING CUM 516.84
23 CC M15 40 MSA CUM 1772.43
S3-9 M20 20 MSA CUM 5013.89
S6-2 M25 20 MSA CUM 89.92
25 M25 20 MSA CUM 125.74
S6-1 M30 20 MSA CUM 11.02
S3-12 M30 20 MSA WEARING COAT CUM 14.5
S3-10 M20 20 MSA WEARING COAT CUM 209.55
27 M35 20 MSA WEARING COAT CUM 6.3
28 MASTIC PADS SQM 22.443
33 WEEP HOLES NO.S 252
35 WATER STOPER RMT 26.2
30 DRAINAGE SPOTS NO.S 28
KRAFT PAPER SQM 73.5
7 BACK FILLING CUM 16130.769
7 APROACH SLABS UNDER GRAVEL FILLING CUM 2711.63
29 STEEL KGS 319559.29
C.R KM 54.275 ABSTRUCT
S.NO/ BOQ. NO DESCRIPTION OF ITEM
21 AKS
22 HDR
S3-13 SAND FILLING
23 CC M15 40 MSA
S3-9 M20 20 MSA
S6-2 M25 20 MSA
25 M25 20 MSA
26 M30 20 MSA
S3-12 M30 20 MSA WEARING COAT
S3-10 M20 20 MSA WEARING COAT
27 M35 20 MSA WEARING COAT
28 MASTIC PADS
33 WEEP HOLES
35 WATER STOPER
30 DRAINAGE SPOTS
KRAFT PAPER
7 BACK FILLING
32 APROACH SLABS UNDER GRAVEL FILLING
29 STEEL
UNIT QUANTITY
CUM 2243.75
CUM 5909.49
CUM 289.17
CUM 1103.18
CUM 2742.23
CUM 77.08
CUM 68.25
CUM 5.51
CUM 10.36
CUM 124.24
CUM 3.15
SQM 14.963
NO.S 126
RMT 13.1
NO.S 20
SQM 52.5
CUM 7495.999
CUM 8.27
KGS 174442.35