You are on page 1of 1

Project No:

HAZOP REVIEW LOGSHEET


Sheet of
Project Title: Flowsheet No:

Process Block Being Review Panel


Reviewed + Duty

Guide Deviation Possible Causes Consequences Action Required


Word

Pump Failure 1.Possible Melting of superheater tubes and 3. Alarm indicator connected to
NONE No Flow
fire hazard due to ethanol contact with Temperature transmitter and Flow meter.
superheater furnace. 4. Installation of Secondary Pump.
5.Thermal/Fire Insulation on the
superheater and piping between the
superheater and reactor.
6.Devise & Implement a defect assessment
and repair plan

Valve # 6 - accidental closure (Operator 1.Pressure build up inside the reactor and 1.NO action required
Error) activation of relief valve
2. Process flow stops

Authorised By: Date: