You are on page 1of 4

WHITE WASHING (3 COATS) COST

MATERIAL REQUIREMENT ANALYSIS FOR 100M2 AREA


for 1 COAT LIME REQUIRED 10.00 kg
LIME FOR 3 COATS 30.00 kg

RATE ANAL
ITEM NAME : 12mm THICK CEMENT PLASTERING IN C
(B) Material Cost Analysis
SR.NO MATERIAL QUANTITY

1 LIME POWDER 30.00 kg


2 FEVICOL LUMSUM
3 INDIGO LUMSUM
4 SUNDRIES LUMSUM
5
6
7
8
9

(A) Labour Cost Analysis


SR.NO LABOUR NUMBERS

1 WHITE WASHER 2.00


2 LABOUR 2
3 SUNDRIES -
4
5
6

(B) Equipment Cost Analysis


SR.NO Equipment Name

1
2 -
3 -
TOTAL COST
NOTES
- Material, Labour,and Equipment price is change as per location and time
- Material and equiment requirement is as per your uses.
- This is most common Rate Analysis Sheet which is majorly used
construction.
SHING (3 COATS) COST ANALYSIS

EA

RATE ANALYSIS SHEET


HICK CEMENT PLASTERING IN CEMENT MORTAR (1;3), QUANTITY (100 SQURE METER)

RATE PER AMOUNT


RS/- RS/-
5 kg 150
- - 50
- - 25
- - 10

TOTAL COST RS/- 235

RATE PER AMOUNT


RS/- RS/-
200 DAY 400
200 DAY 400
- - 10

Total Cost 810

(A) MATERIAL COST 235


HIRE CHARGES (B) LABOUR COST 810
RS/- Ps. (C)EQUIPMENT COST 0
0 0
0 0 TOTAL COST OF LABOUR & EQUIPMENT
0 0 1 A+B+C 1045
TOTAL COST 0 2 1.5% WATER CHARGE 15.675
3 10% CONTRACTOR'S PROFIT 104.5
TOTAL COST RS/- 1165.175
s per location and time FOR 100 SQUARE METER RS/- 1165.175
r uses. FOR 1 SQUARE METER RS/- 11.65175
s majorly used

You might also like