Professional Documents
Culture Documents
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Ah = 0.075
(0.16*1.5*2.5)/(2*4)
Circumferential angle φ = 0
Qiw = 0.84
(0.866*(1-((0/5.4)^2))*TANH(0.866*13.5/5.4)
Piw = 0.03
(0.84*0.075*10.1*9.81*5.4*COS(PI()/180*0)
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
= 0.246
(0.5625*COSH(3.674*0/13.5))/COSH(3.674*5.4/13.5)
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(0.246*0.075*1000*9.81*5.4*13.5)*(1-((1/3)*COS(PI()/180*0)*COS(PI()/180*0)))*COS(PI()/180*0)/(1000)
= 0.16
(1.125*((5.8/13.5)-(4/3)*(5.8/13.5)^3)*1/COSH(3.674*5.4/13.5)
(0.16*0.075*10.1*9.81*13.5)
(0.075*25*0.3*9.81)
convective pressure
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Av = 0.0495
26.484351 kN/m
2
Pv =
P = 27.06 kN/m2
Since hydrodynamic pressure is less than hydrostatic pressure, design of Primary sludge thickner has been done with
hydrostatic Pressure
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur