Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in

Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number:
PST-I-STR-01 ABI SVK/JTP 0

Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur

HYDRO DYNAMIC PRESSURE FOR CIRCULAR TANK

DESIGN HORIZONTAL SEISMIC CO-EFFICIENT

Zone Factor Z = 0.16

Response Reduction Factor R = 4

Importance Factor I = 1.5

Height of the Structure H = 4

Time Period T = 0.21

Average Response Acceleration Sa/g = 2.5

Ah = 0.075

(0.16*1.5*2.5)/(2*4)

IMPULSIVE HYDRODYNAMIC PRESSURE

1.)LATERAL PRESSURE ON THE WALL,(Piw)

Distance of a point on tank wall from y = 0.000 m

Mass density of liquid ρ = 10.10 kN/m^3

Acceleration due to gravity g = 9.81 m/s

Maximum depth of liquid h = 5.40 m

Circumferential angle φ = 0

inner diameter of tank D = 13.5 m

Coefficient of impulsive hydrodynamic pressure on wall

Qiw = 0.84

(0.866*(1-((0/5.4)^2))*TANH(0.866*13.5/5.4)

Piw = 0.03

(0.84*0.075*10.1*9.81*5.4*COS(PI()/180*0)
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number:
PST-I-STR-01 ABI SVK/JTP 0

Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur

2.)Impulsive hydrodynamic pressure in vertical direction on base slab

Horizontal distance of a point on X = 5.8 m


base of tank in the direction of
seismic force,from center of tank

length of the strip in the direction of seismic forc l' = 11.6 m

Pib = 0.03 kN/m2


(0.866*0.075*10.1*9.81*5.4*SINH(1.732*5.8/5.4))/COSH(0.866*11.6/5.4)

CONVECTIVE HYDRODYNAMIC PRESSURE

1).Lateral convective pressure on the wall:

= 0.246

(0.5625*COSH(3.674*0/13.5))/COSH(3.674*5.4/13.5)
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number:
PST-I-STR-01 ABI SVK/JTP 0

Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur

Pcw = 0.009 kN/m2

(0.246*0.075*1000*9.81*5.4*13.5)*(1-((1/3)*COS(PI()/180*0)*COS(PI()/180*0)))*COS(PI()/180*0)/(1000)

2).Convective pressure on base slab

= 0.16

(1.125*((5.8/13.5)-(4/3)*(5.8/13.5)^3)*1/COSH(3.674*5.4/13.5)

Pcb = 0.02 kN/m2

(0.16*0.075*10.1*9.81*13.5)

PRESSURE DUE TO WALL INERTIA

Mass density of tank wall = 25 kN/m^3

wall thickness = 0.3 m

Pww = 5.52 kN/m2

(0.075*25*0.3*9.81)

impulsive hydrodynamic pressure

Lateral hydrodynamic impulsive pressure on the wall, piw piw 0.03

Impulsive hydrodynamic pressure on base slab Pib 0.03

convective pressure

Lateral convective pressure on the wall pcw Pcw 0.01


Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number:
PST-I-STR-01 ABI SVK/JTP 0

Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur

Convective pressure in vertical direction, on the base slab Pcb 0.02

PRESSURE DUE TO VERTICAL EXCITATION

Av = 0.0495

26.484351 kN/m
2
Pv =

MAXIMUM HYDRO DYNAMIC PRESSURE

P = 27.06 kN/m2

Since hydrodynamic pressure is less than hydrostatic pressure, design of Primary sludge thickner has been done with
hydrostatic Pressure
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-
Gas including Operation and Maintenance for ten years at Chennai.

19-EPE-CMWSSB-STP-120MLD- Prepared Checked Approved Rev


Document Number:
PST-I-STR-01 ABI SVK/JTP 0

Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur

You might also like