To: DJV
From: CJV
Re: P2Wk-PUHOI VIADUCT-MONITORING DATA #2
-------------------------------------------------------------------------------------------------------------------------
1. PURPOSE
Monitoring survey pins were installed, and monitoring work carried out as per the IFC
drawing P2Wk-DRG-SE-18-0016-Rev.01.
2. REFERENCES
3. SUMMARY OF RESULTS
4. CONCLUSIONS
Measured total settlement of the survey pins are lower than the expected.
1
1 18
11 14
3
ANNEX 2 – SETTLEMENT MONITORING GRAPH
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT NORTH ABUTMENT ELEMENT NORTH ABUTMENT
DATE 2/06/2020 DATE 2/06/2020
Monitoring Points
θ
SET 9
SET
10
ALARM Reference
0.010 0.010
ACTION
0.005 0.005
Displacemt (m)
Differential settlement(m)
0.000 0.000
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
DATES DATES
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT PIER B ELEMENT PIER B
DATE 2/06/2020 DATE 2/06/2020
Monitoring Points
SET 11
SET 12
0.005 0.005
Displacemt (m)
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
DATES DATES
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT PIER C ELEMENT PIER C
DATE 2/06/2020 DATE 2/06/2020
Monitoring Points
SET 13
θ
SET 14
0.005 0.005
Displacemt (m)
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
DATES DATES
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT PIER D ELEMENT PIER D
DATE 2/06/2020 DATE 2/06/2020
Monitoring Points
SET 15
SET 16
ALERT SE_18_SPSS_PIER_C
0.015 0.015
ALARM SE_18 DIFF SETTLEMENT
0.010 ACTION 0.010 Reference
0.005 0.005
Displacemt (m)
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
DATES DATES
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT PIER E ELEMENT PIER E
DATE 2/06/2020 DATE 2/06/2020
Monitoring Points
SET 17
SET 18
0.000 0.000
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
DATES DATES
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT PIER F ELEMENT PIER F
DATE 2/06/2020 DATE 2/06/2020
Monitoring Points
SET 19
SET 20
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
DATES DATES
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT SOUTH ABUTMENT ELEMENT SOUTH ABUTMENT
DATE 2/06/2020 DATE 2/06/2020
Monitoring Points
SET 21
SET 20
0.005 0.005
Displacemt (m)
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
DATES DATES