Re: PUHOI VIADUCT-INSTRUMENTATION MONITORING DATA #3
-------------------------------------------------------------------------------------------------------------------------
1. PURPOSE
Monitoring survey pins were installed, and monitoring work carried out as per the IFC
drawing P2Wk-DRG-SE-18-0016-Rev.01.
2. REFERENCES
3. SUMMARY OF RESULTS
4. CONCLUSIONS
Measured total settlement of the survey pins are lower than the expected.
1
1 18
11 14
3
ANNEX 2 – SETTLEMENT MONITORING GRAPH
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT NORTH ABUTMENT ELEMENT NORTH ABUTMENT
DATE 16/06/2020 DATE 16/06/2020
Monitoring Points
θ
SET 9
SET
10
ALARM Reference
0.010 0.010
ACTION
0.005 0.005
Displacemt (m)
Differential settlement(m)
0.000 0.000
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
DATES DATES
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT PIER B ELEMENT PIER B
DATE 16/06/2020 DATE 16/06/2020
Monitoring Points
SET 11
SET 12
0.005 0.005
Displacemt (m)
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
DATES DATES
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT PIER C ELEMENT PIER C
DATE 16/06/2020 DATE 16/06/2020
Monitoring Points
SET 13
θ
SET 14
0.005 0.005
Displacemt (m)
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
DATES DATES
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT PIER D ELEMENT PIER D
DATE 16/06/2020 DATE 16/06/2020
Monitoring Points
SET 15
SET 16
0.005 0.005
Displacemt (m)
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
DATES DATES
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT PIER E ELEMENT PIER E
DATE 16/06/2020 DATE 16/06/2020
Monitoring Points
SET 17
SET 18
0.010 ACTION
0.010
Reference
0.000 0.000
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
DATES DATES
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT PIER F ELEMENT PIER F
DATE 16/06/2020 DATE 16/06/2020
Monitoring Points
SET 19
SET 20
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
DATES DATES
PUHOI TO WAKWORTH MOTORWAY PUHOI TO WAKWORTH MOTORWAY
STRUCTURES MONITORING REPORT STRUCTURES MONITORING REPORT
STRUCTURE PUHOI VIADUCT STRUCTURE PUHOI VIADUCT
ELEMENT SOUTH ABUTMENT ELEMENT SOUTH ABUTMENT
DATE 16/06/2020 DATE 16/06/2020
Monitoring Points
SET 21
SET 20
-0.005 -0.005
-0.010 -0.010
-0.015 -0.015
-0.020 -0.020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
12/10/2019
20/01/2020
10/03/2020
29/04/2020
18/06/2020
1/12/2019
7/08/2020
DATES DATES