1.Project Statement:
In this document will explain why we started this project and what will achieve. The
following topics will be described. : the formal client, the project leader and the team
members ,current situation, the problem description, the goal of our project, the
deliverables and non-deliverables,
the constraints and the risks.
3.Project Team:
-Project leader:
Name: Andre Samuel Rieuwpassa.
Email : a.rieuwpassa@student.fontys.nl
-Secretary:
Name: Lama Naser Eddin.
Email: lamanasereddin@student.fontys.nl.
-Note maker:
Name: Teodor Galinov Genov
Email: t.genov@student.fontys.nl
-meeting minute:
Name: Kaloyan Atanasov Babev
Email: k.babev@student.fontys.nl
2
4.Current Situation:
The company wants to organise a food festival that starts on Friday morning and
continues until the end of the weekend. The event will take place on a big terrain
with a lot of space for visitors/tents, whatever the event requires.
Part of the terrain is reserved for the camping ground, where visitors can stay for the
night. The company is going to make a website that informs people about the event
and allow them to buy ticket and allows reservation of camping spots. The company
want to make profit by selling food, drinks, souvenirs etc.
The company will make an application to support the shops (food, drink, souvenirs).
It’s not possible to the customer to pay with cash because of that there will be
machine on the terrain to allow visitors to transfer money from their bank account
to their event account. In this case the company will need an application that
changes the balance of the visitors.
The company needs also a software system that is going to be used to manage the
event. Our company going to provide application to help the event management
team to see the overall status of the event.
5.Project justification:
Because the event started to attract more visitors, it has become impossible to
manage them without a proper software solution, that’s why the company is going
to make a website and some applications to control everything.
6.Project Goal
The system will be composed of balance application, check in and check application,
loan stand app, event overview application, out which will be used to manage the
event. The system must provide
3
day.
4
Deliverables:
Project plan – first draft
Group name and logo
Project plan
Database ERD
Static website
Web app
App for scanning ticket
App for shop management
App for loan stands
App for event
Database
Presentation
Deployed applications and website
Non-deliverables:
gps track on the bracelet
client wishes to add other features to the or recoding the c# app after a long
time(due to restricted time/we are busy with our new clients/projects and we cant
do that)*
8.Project Constraints:
Constraint 1: Time
In every week, we need to have a meeting to always plan the next step.
The company require to make an application and website with in 20 weeks
5
9.Project risks:
Risk 1: Illness amongst team member
Probability: small
Impact on project: high (due to small team)
Steps to prevent: have one backup team member
Clean up action: push unavailable teammates’ deadlines to another teammate(s).
10.Project phasing:
Initiation Design Build Test Deploy
Build Test
Design
Apps
Start 6
Project
Deploy
Apps
Document Build
Project Database
M1 M2 M3 M4 M5
wk1 wk3 wk6 wk13 wk15 wk16
Phase 1: Initiation
Action: Start project
Tasks:
1. Interview client
2. Discuss current situation, problems and end application
3. Set a goal
4. Organize team
Estimated duration: Done
Deliverables for Milestone 1
7
Estimated duration: 14 october
Design tasks:
1. Design application
2. Design database
3. Design UI of website
Estimated duration: Two weeks.
Deliverables for Milestone 2 are:
Project plan
Database ERD
Static website
Phase 3: Build
Action: Build
Tasks:
1. Build and populate database
Estimated duration: 13 november
Deliverables are:
Web app
App for scanning ticket
App for shop management
App for loan stands
App for event
Database
Phase 4: Test
Action: Test applications and website
Tasks:
1. Database check
2. Test event apps
3. Test website
8
4. Improve if needed
Estimated duration: between November 13 – January 6
Deliverables:
Phase 5: Deploy
Action: Deploy applications
Tasks:
1. Deploy applications and website
2. Create a presentation
Estimated duration:
Deliverables:
Presentation
Deployed applications and website
9
11. Management Plans:
1. Skill
Making application on c#
Making website
Database basic
Documentation making
Application and database connection
2. Information
In charge of all the document is : Andre
In charge of the website is: Theodor
In charge of the application is : kaloyan
In charge of the database is: lama
(note: everyone going to make everything but the one that in charge of the above
are those people)
3. Time
In every week at least 1 time meeting with the tutor
In every week at least 1 time meeting not with the tutor
before the 13 January everything should be done