You are on page 1of 11

Projects Engineering Department

Engineering Standard

BES-A004 03 September, 2008


Vendor Data & Documentation Requirements

Contents

1.0 INTRODUCTION ............................................................................. 3


2.0 VENDOR SUPPLY DATA AND DOCUMENTS ............................... 3
3.0 DATA AND DOCUMENT REQUIREMENTS ................................... 3
4.0 DELIVERY OF DATA AND DOCUMENTS ...................................... 4
ATTACHMENT 1 - DATA AND DOCUMENTS REQUIRED WITH TENDER . 6
ATTACHMENT 2 - MECHANICAL DATA AND DOCUMENTS ...................... 7
ATTACHMENT 3 - ELECTRICAL DATA AND DOCUMENTS ........................ 8
ATTACHMENT 4 - INSTRUMENTATION DATA AND DOCUMENTS ......... 10

Page 1 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements

REVISION RECORD

Date Originator Reviewed Approved Description

27/08/06 ESD AKD AMA For implementation


03/09/08 ESD NOE AMA 1.1, 1.2, 3.2, 3.4, 3.6, 3.14, 3.17, and 4.2 added

Page 2 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements

1.0 INTRODUCTION

1.1 PURPOSE

This is the general standard for the supply of VENDOR data and documents in accordance with applicable
project documents. VENDOR shall be responsible for the supply of all required data and documents in
accordance with the requirements stated in the purchase requisition.

1.2 DEFINITIONS AND ABBREVIATIONS

For the purpose of this standard the following definitions shall apply:

"PURCHASER" means the party or its duty appointed representative, which is contracted to purchase the
materials and or equipment as described by this specification.

"VENDOR" means the party, which is contracted to manufacture and/or supply materials, equipment and
services to perform the duties as described by this specification.

2.0 VENDOR SUPPLY DATA AND DOCUMENTS

2.1 The VENDOR shall deliver the manufacture, test and delivery schedules in linked bar-chart format. These shall
include as applicable: engineering and design, documentation review and approvals, ordering and delivery of
materials, fabrication and assembly, factory inspection, PURCHASER third party inspection, factory acceptance
test, painting and coating, packing and marking, shipment and arrival at place of destination.

2.2 The VENDOR shall deliver progress reports. These shall comprise VENDOR document register list, detailed
schedule with a status line of the date of issue, description of all activities executed in the last period, scheduled
to be done in the next period, reasons for delays (if any) and what measures will be taken to achieve agreed
delivery dates.

3.0 DATA AND DOCUMENT REQUIREMENTS

3.1 The VENDOR is required to supply the data and documents specified, in the quantities and format within the
submission time marked per position, all in accordance with these terms and instructions. The information
required may be combined within documents provided, however no concession is granted to a uniform and clear
interpretation of the required information.

3.2 The VENDOR shall be responsible for the supply of sub-vendor documentation/drawings to the PURCHASER.
The VENDOR shall ensure that his sub-vendors' documentation meets all the requirements set forth in the
purchase requisition and this specification prior to submittal.

3.3 All submitted data, drawings, and documents shall be recorded on a document register, which shall be kept up to
date by the VENDOR. The VENDOR shall prepare a document register, which shall be submitted with progress
reports.

3.4 The VENDOR shall prepare and maintain a document register and shall include all the relevant information
regarding documents and drawings. The number of the drawings shall be of the format,

BNV-A?-????? BNV - vendor drawing designation


A? - drawing size
????? - drawing number to be provided by the PURCHASER

3.5 The VENDOR document register shall contain the following information, as a minimum; PURCHASER’s order
reference number, document number, document description, tag, item or equipment number, revision number
with corresponding date, status of documents submitted by the VENDOR and commented and/or approval return
dates.

Page 3 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements

3.6 The VENDOR shall prepare and maintain a bought out items schedule. This shall list all the items required for
the project, purchase requisition number, purchase order date, delivery details, sub-vendor details, latest status,
and remarks etc.

3.7 VENDOR shall submit data and documents clearly identifying their issue status i.e. “Information Only”,
“For Approval”, “Approved”, “Released for Construction” which will also be reflected in the document register.

3.8 VENDOR shall seek approval of documents in advance of the scheduled activities affected by those documents
by taking into consideration of 3 working weeks for data and document review. However, 4 working weeks shall
be allowed for review of certain key documents. Key documents shall be determined with the VENDOR after
contract award.

3.9 Documents that are “Not Approved” or “Approved except as Noted” shall be revised having taken the comments
into consideration. The revision and dates shall be increased and the documents shall be re-submitted “For
Approval” in the quantities as originally required.

3.10 Reviews, comments or approvals of documents does not alter any of the terms and conditions of the purchase
requisition nor relieve the VENDOR from any responsibility or liability for the accuracy and completeness of the
data and documents included therein, nor shall it be interpreted as an assumption or imposition on the purchase
requisition of any liability or responsibility as a result of such review.

3.11 All data, documents, drawings, and literature shall be in the English language.

3.12 For units of measurements the Imperial System shall be applied. Other applicable standards and units of
measurements i.e. Metric, System International SI, US shall be applied if indicated on data sheets or technical
specifications.

3.13 All drawings shall be prepared in A1, A2, A3, or A4 formats as appropriate.

3.14 All drawings shall be preferable prepared in AutoCAD (Release version to be confirmed with PURCHASER at
time of requisition).

3.15 The text on drawings shall be in block letters, which shall not be less then 3 mm high.

3.16 VENDOR is to leave space on drawings for the inclusion of a PURCHASER’s title block, of 150 x 75 mm, just
above the drawing title block.

3.17 Prior “Approval” of the applicable data and documents is required before commencing manufacture. If
manufacture commences before approval is received, then this shall be at the sole risk and to the account of the
VENDOR.

4.0 DELIVERY OF DATA AND DOCUMENTS

4.1 Prints (P) Hard copies suitable for photocopying or scanning;


For printed matter, original transparencies or digital files are required.
Transparencies (T) On polyester 3.5 mil/90 micron;
Digital Format (D) On CD

4.2 Final documentation includes the VENDORS data reports, drawings and documents at “Final” or “As Built”
status. Documents are to be prepared using MS Office software.

4.3 All documents in the final documentation shall be legible and of quality suitable for reproduction, size reduction
and scanning, irrespective of their origin.

4.4 All prints of documents and drawings that are to be included in the final documentation shall be reduced in size
to A4 and A3 size where reproduction results in legible copies, otherwise prints shall be supplied in A1 or A2
size (maximum) folded to A4 and supplied in clear plastic envelopes.

Page 4 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements

4.5 Final documentation once approved, shall be dispatched by the VENDOR. Preparation, printing, binding,
mailing, and delivery shall be the VENDOR’s responsibility.

4.6 Final documentation shall be delivered as one complete package, indexed and sorted logically to equipment
number, tag number, etc. and compiled into 4 ring binders (or other binding as approved by the PURCHASER )
per set, front sheets and spine with project relevant descriptions, suitable for continued use and storage.

Page 5 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements

Attachment 1 - DATA AND DOCUMENTS REQUIRED WITH TENDER

Vendor shall deliver, with the Tender, the following documents as indicated in the requisition.

Required Documents Prints With Tender


General company description
Photographs and brochures
Catalogue information
Prequalification information
Reference list of similar jobs (incl. Sub-vendors)

Quality plan
List of contact names (incl. Sub-vendors)
Manufacture, test- and delivery schedule
List of deviations

Construction, start-up, commissioning spares


Spare parts list for two years operation
Quotation for special tools

Completed data sheets


Noise level data

PFD
P & ID’s
Equipment list
Utility consumption requirements
General arrangement drawing
Dimensional drawings
Dimensional drawing with weights

Installation instructions
Operating instructions
Maintenance instructions

Page 6 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements

Attachment 2 - MECHANICAL DATA AND DOCUMENTS

Vendor shall deliver the following data and documents as indicated in the requisition.

Required Documents Weeks No. of Weeks No. of Final


After Prints for After Prints for Documents
Award Approval Approval Final Issue
List of drawings
PFD
P & ID’s
Equipment list
Utility consumption requirements
Equipment data sheets
General arrangement drawings
Dimensional drawings with weights
Anchor bolt plan
Foundation drawings, loads, clearances
Assembly & sectional drawings
Fabrication & shop drawings
Piping drawings
Support drawings
Bill of materials
Design calculations
Stress calculations
Vibration calculations
Welding calculations
Welding procedures WPS & PQR
Nameplate details
Noise level data (actual)

Material certificates
Painting certificates

Test procedures
Test reports
Test curves
Fabrication reports

Storage instructions
Painting procedure / specification
Trouble shooting procedure

Part list, incl. Sectional drawings


Spare parts interchangeability records (SPIR)

Lubrication specification
Inspection procedures
Lifting details
Installation instructions
Operating instructions
Maintenance instructions

Page 7 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements

Attachment 3 - ELECTRICAL DATA AND DOCUMENTS

Vendor shall deliver the following data and documents as indicated in the requisition.

Required Documents Weeks No. of Weeks Number of Final


After Prints for After Prints for Documents
Award Approval Approval Final Issue
List of drawings
PFD
P & ID’s
Equipment list
Utility consumption requirements
Equipment data sheets
General arrangement drawings
Dimension drawings with weights
Hazardous area classification drawing
Single line diagrams
Consumers list
Cable list
Block diagrams
Selective/coordination protection diagrams
Layout drawings
Layout sub stations and buildings
Layout electrical equipment
Cable routing drawings
Terminal box drawings
List of component drawings
List of nameplates

Logic diagrams
Circuit diagrams
Wiring diagrams

Sizing cables calculations


Lighting calculations
Battery & charger size calculations
Cathodic protection calculations
Heat tracing calculations
Earthing calculations

Certificate of compliance
Test certificates
Type test certificates
Enclosure and IPP certificates
Authorization app. test
Functional test
Performance test curve
Material certificates
Painting certificates

For continuation see next page -- -- -- -- --

Page 8 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements

Attachment 3- ELECTRICAL DATA AND DOCUMENTS (cont’d)

Vendor shall deliver the following data and documents as indicated in the requisition.

Required Documents Weeks No. of Weeks No. of Final


After Prints for After Prints for Documents
Award Approval Approval Final Issue
Storage instructions
Painting procedure / specification
Trouble shooting procedure

Part list, incl. Sectional drawings


Spare parts interchangeability records (SPIR)

Lubrication specification
Inspection procedures

Installation instructions
Operating instructions
Maintenance instructions

Page 9 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements

Attachment 4 - INSTRUMENTATION DATA AND DOCUMENTS

Vendor shall deliver the following data and documents as indicated in the requisition.

Required Documents Weeks Number of Weeks No. of Final


After Prints for After Prints for Documents
Award Approval Approval Final Issue
List of drawings
PFD
P & ID’s
Equipment list
Utility consumption requirements
Cause and effects diagrams
Hazardous area drawing
Instrument index
Instrument data sheets

Alarm and trip setting list


Cause and effect diagram
Dimensional drawing with weights
Control and functional block diagrams
Functional logic diagrams and write-up
Instrument loop/sequence diagrams
Instrument location layouts
Junction box schedule, connections, layouts
Hook-up drawings
Interconnection diagrams

General layout drawings


Control room layout drawings
Control equipment layout drawings
Wiring drawings
Cabinet layouts (internal/external)
Installation drawings

Cable list
Cable termination diagrams
Cable schedules
Cable layouts

Noise level data (actual)


Sizing calculations
Vibration calculations

Air consumption calculations


Power supply calculations
Reliability calculations
Heat dispersion calculations
Sample transport calculations

I/O lists
List of nameplates (including details)
Graphic layouts
Report layouts

For continuation see next page --- --- --- --- ---

Page 10 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements

Attachment 4- INSTRUMENTATION DATA AND DOCUMENTS (cont’d)

Vendor shall deliver the following data and documents as indicated in the requisition.

Required Documents Weeks No. of Weeks Number of Final


After Prints for After Prints for Documents
Award Approval Approval Final Issue
Certificate of compliance
Compliance with NACE requirements
Material certificates
Calibration certificates
Enclosure and IP certificates
Test certificates

Functional test procedures


Performance procedures
Painting procedures / specification
Trouble shooting procedure

Part List, incl. sectional drawings


Spare parts interchangeability records (SPIR)

Inspection procedures

Installation instructions
Operating instructions
Maintenance instructions

Page 11 of 11