Professional Documents
Culture Documents
Engineering Standard
Contents
Page 1 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements
REVISION RECORD
Page 2 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements
1.0 INTRODUCTION
1.1 PURPOSE
This is the general standard for the supply of VENDOR data and documents in accordance with applicable
project documents. VENDOR shall be responsible for the supply of all required data and documents in
accordance with the requirements stated in the purchase requisition.
For the purpose of this standard the following definitions shall apply:
"PURCHASER" means the party or its duty appointed representative, which is contracted to purchase the
materials and or equipment as described by this specification.
"VENDOR" means the party, which is contracted to manufacture and/or supply materials, equipment and
services to perform the duties as described by this specification.
2.1 The VENDOR shall deliver the manufacture, test and delivery schedules in linked bar-chart format. These shall
include as applicable: engineering and design, documentation review and approvals, ordering and delivery of
materials, fabrication and assembly, factory inspection, PURCHASER third party inspection, factory acceptance
test, painting and coating, packing and marking, shipment and arrival at place of destination.
2.2 The VENDOR shall deliver progress reports. These shall comprise VENDOR document register list, detailed
schedule with a status line of the date of issue, description of all activities executed in the last period, scheduled
to be done in the next period, reasons for delays (if any) and what measures will be taken to achieve agreed
delivery dates.
3.1 The VENDOR is required to supply the data and documents specified, in the quantities and format within the
submission time marked per position, all in accordance with these terms and instructions. The information
required may be combined within documents provided, however no concession is granted to a uniform and clear
interpretation of the required information.
3.2 The VENDOR shall be responsible for the supply of sub-vendor documentation/drawings to the PURCHASER.
The VENDOR shall ensure that his sub-vendors' documentation meets all the requirements set forth in the
purchase requisition and this specification prior to submittal.
3.3 All submitted data, drawings, and documents shall be recorded on a document register, which shall be kept up to
date by the VENDOR. The VENDOR shall prepare a document register, which shall be submitted with progress
reports.
3.4 The VENDOR shall prepare and maintain a document register and shall include all the relevant information
regarding documents and drawings. The number of the drawings shall be of the format,
3.5 The VENDOR document register shall contain the following information, as a minimum; PURCHASER’s order
reference number, document number, document description, tag, item or equipment number, revision number
with corresponding date, status of documents submitted by the VENDOR and commented and/or approval return
dates.
Page 3 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements
3.6 The VENDOR shall prepare and maintain a bought out items schedule. This shall list all the items required for
the project, purchase requisition number, purchase order date, delivery details, sub-vendor details, latest status,
and remarks etc.
3.7 VENDOR shall submit data and documents clearly identifying their issue status i.e. “Information Only”,
“For Approval”, “Approved”, “Released for Construction” which will also be reflected in the document register.
3.8 VENDOR shall seek approval of documents in advance of the scheduled activities affected by those documents
by taking into consideration of 3 working weeks for data and document review. However, 4 working weeks shall
be allowed for review of certain key documents. Key documents shall be determined with the VENDOR after
contract award.
3.9 Documents that are “Not Approved” or “Approved except as Noted” shall be revised having taken the comments
into consideration. The revision and dates shall be increased and the documents shall be re-submitted “For
Approval” in the quantities as originally required.
3.10 Reviews, comments or approvals of documents does not alter any of the terms and conditions of the purchase
requisition nor relieve the VENDOR from any responsibility or liability for the accuracy and completeness of the
data and documents included therein, nor shall it be interpreted as an assumption or imposition on the purchase
requisition of any liability or responsibility as a result of such review.
3.11 All data, documents, drawings, and literature shall be in the English language.
3.12 For units of measurements the Imperial System shall be applied. Other applicable standards and units of
measurements i.e. Metric, System International SI, US shall be applied if indicated on data sheets or technical
specifications.
3.13 All drawings shall be prepared in A1, A2, A3, or A4 formats as appropriate.
3.14 All drawings shall be preferable prepared in AutoCAD (Release version to be confirmed with PURCHASER at
time of requisition).
3.15 The text on drawings shall be in block letters, which shall not be less then 3 mm high.
3.16 VENDOR is to leave space on drawings for the inclusion of a PURCHASER’s title block, of 150 x 75 mm, just
above the drawing title block.
3.17 Prior “Approval” of the applicable data and documents is required before commencing manufacture. If
manufacture commences before approval is received, then this shall be at the sole risk and to the account of the
VENDOR.
4.2 Final documentation includes the VENDORS data reports, drawings and documents at “Final” or “As Built”
status. Documents are to be prepared using MS Office software.
4.3 All documents in the final documentation shall be legible and of quality suitable for reproduction, size reduction
and scanning, irrespective of their origin.
4.4 All prints of documents and drawings that are to be included in the final documentation shall be reduced in size
to A4 and A3 size where reproduction results in legible copies, otherwise prints shall be supplied in A1 or A2
size (maximum) folded to A4 and supplied in clear plastic envelopes.
Page 4 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements
4.5 Final documentation once approved, shall be dispatched by the VENDOR. Preparation, printing, binding,
mailing, and delivery shall be the VENDOR’s responsibility.
4.6 Final documentation shall be delivered as one complete package, indexed and sorted logically to equipment
number, tag number, etc. and compiled into 4 ring binders (or other binding as approved by the PURCHASER )
per set, front sheets and spine with project relevant descriptions, suitable for continued use and storage.
Page 5 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements
Vendor shall deliver, with the Tender, the following documents as indicated in the requisition.
Quality plan
List of contact names (incl. Sub-vendors)
Manufacture, test- and delivery schedule
List of deviations
PFD
P & ID’s
Equipment list
Utility consumption requirements
General arrangement drawing
Dimensional drawings
Dimensional drawing with weights
Installation instructions
Operating instructions
Maintenance instructions
Page 6 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements
Vendor shall deliver the following data and documents as indicated in the requisition.
Material certificates
Painting certificates
Test procedures
Test reports
Test curves
Fabrication reports
Storage instructions
Painting procedure / specification
Trouble shooting procedure
Lubrication specification
Inspection procedures
Lifting details
Installation instructions
Operating instructions
Maintenance instructions
Page 7 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements
Vendor shall deliver the following data and documents as indicated in the requisition.
Logic diagrams
Circuit diagrams
Wiring diagrams
Certificate of compliance
Test certificates
Type test certificates
Enclosure and IPP certificates
Authorization app. test
Functional test
Performance test curve
Material certificates
Painting certificates
Page 8 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements
Vendor shall deliver the following data and documents as indicated in the requisition.
Lubrication specification
Inspection procedures
Installation instructions
Operating instructions
Maintenance instructions
Page 9 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements
Vendor shall deliver the following data and documents as indicated in the requisition.
Cable list
Cable termination diagrams
Cable schedules
Cable layouts
I/O lists
List of nameplates (including details)
Graphic layouts
Report layouts
For continuation see next page --- --- --- --- ---
Page 10 of 11
BES-A004 03 September, 2008
Vendor Data & Documentation Requirements
Vendor shall deliver the following data and documents as indicated in the requisition.
Inspection procedures
Installation instructions
Operating instructions
Maintenance instructions
Page 11 of 11