Report No.

RI/ONGC-CARLTON-EPM/022/HRG/FR-
FLASH REPORT 01 Date- 28.12.2020 Security level: RINA/CL/SENSITIVE

1 - Reference Section

Client: Oil Natural Gas Corporation Ltd. Project: Revamping of Gas Dehydration Unit
(GDU) at NQP Process Platform of MH
Asset on LSTK.   
Main Vendor: CARLTON INDUSTRIAL Sub Vendor: Emerson Automation Solution
ENGINEERS
Main Vendor PO &DT LOICIE/ONGC/GDU/GEN/072/2020- Sub Vendor PO No. CIE/ONGCIGDUIPT.TTIO22
21 dtd:24.7.2020. SO#18914981
Place of Inspection: Emerson Automation Solution Plot Contacted Person: Mr. Pankaj – Carlton
No.A-145/4,TTC Industrial Mr. Saif Muiz - Emerson Automation
Area, MIDC Pawne, N.Mumbai Solution

Date of Inspection 28.12.2020 Time in: 9.30AM Time out: 18.00PM


Inspection Notification e-mail dtd- 24th Dec 2020.

2 - Content Section

Material and quantity offered for Inspection as per P.O./ Work Order:-
P.O./Tag Item Item Description Ordered Qty Offered Qty

1 Supply of Temperature, Pressure & Differential Pressure Transmitter as attached Annexure A

A Temp. Transmitters 18 Nos. 18 Nos.

B Differential pressure transmitters 14 Nos. 14 Nos.

C Pressure transmitters 16 Nos. 16 Nos.

Reference Documents:-
1.PO – LOICIE/ONGC/GDU/GEN/072/2020-21 dtd:24.7.2020.
Scope of Inspection –
2.Sub PO - CIE/ONGCIGDUIPT.TTIO22 SO#18914981
Inspection as per approved ref. Documents.
3.PS for Transmitters - CIE-MH-NQ-PS-IN-TX-004N Rev A.

As per Inspection Notification e-mail dtd- 24th Dec 2020, Visited to Emerson Automation Solution Plot No. A-145/4,TTC
Industrial Area, MIDC Pawne, Navi Mumbai, Maharashtra,  India, for Inspection of Temperature, Pressure & Differential
Pressure Transmitter as attached Annexure A.
M/s Emerson Automation Solution , Pawane N.Mumbai Submitted Material Offer List attached herewith for Supply of
Temperature, Pressure & Differential Pressure Transmitters and observed that

1. Range of all Temp. Transmitters and Model No &Qty of Transmitters are different and not matching with the
Annexure-1 attached to PO- LOICIE/ONGC/GDU/GEN/072/2020-21 dtd:24.7.2020.

2. An agency appointed or nominated by the LSTK Contractor for inspection/witness at various stages of manufacturing of equipment’s as
per the terms of Contract is not available during Inspection. Neither the Inspection report is availabale with Emerson Automation
Solution , Pawane N.Mumbai.

Note: This Flash Report shall not be considered as Final Clearance Certificate for the dispatch of above materials.