OMAN TANK TERMINAL COMPANY (OTTCO)

PROJECT: RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)

COMMENTS RESOLUTION SHEET

Document No: 9686-6130-PR-100-0008 Rev: A1

Document Title: WELDING BOOK Doc. Class: 2

CONTRACTOR Transmittal No: 9686-TR-CPP-5622 Date: 04-Apr-20


Comment Sheet No: CRS_9686-6130-PR-100-0008_A1 Date: 14-Apr-20
Document Status Code: Code 1 – Rejected; CONTRACTOR to revise and resubmit; Code 3 – No Comments;
3
Code 2 – Comments as Noted; Code 4 – Noted for information;

Sl. CONTRACTOR Response COMPANY Decision


COMPANY Comments (Identify Section/Page/Paragraph)
No. Date: Date:
PQR reference on all WPS.

The PQR (Procedure Qualification Record) is


compiled for each procedure and is including AS-
-Refer supporting PQR number in all WPS -Final PQR
RUN Records / NDT Reports / Mechanical Test
document is not prepared and included based on
1. Reports / Material Certificates. If the Company
qualification records
refers to a dedicated document called PQR, then
(APPENDIX 1 / 12 / ) the AS-RUN Detail Record can be considered
that document as it includes all the essential and
non-essential variables recorded during
procedure qualification.
Please refer to line pipe certificate no. 19-0196 /
page 24, included in the Welding Book. The line
Re check this values , C% base metal itself is having 0.10
pipe for WPQT (pipe no 6016/ heat no 476192)
2. % max,
has the C% = 0.04, therefore C% = max 0.06 is
(APPENDIX 1 / 12 / ) reported in the WPS. The C% = 0.10 is the
nominal value.
Reviewed by: _________

Endorsed by: _________

CRS_9686-6130-PR-100-0008_A1 Page 1 of 1