Comment Sheet No: CRS_9686-6130-PR-100-0008_A1 Date: 14-Apr-20 Document Status Code: Code 1 – Rejected; CONTRACTOR to revise and resubmit; Code 3 – No Comments; 3 Code 2 – Comments as Noted; Code 4 – Noted for information;
Sl. CONTRACTOR Response COMPANY Decision
COMPANY Comments (Identify Section/Page/Paragraph) No. Date: Date: PQR reference on all WPS.
The PQR (Procedure Qualification Record) is
compiled for each procedure and is including AS- -Refer supporting PQR number in all WPS -Final PQR RUN Records / NDT Reports / Mechanical Test document is not prepared and included based on 1. Reports / Material Certificates. If the Company qualification records refers to a dedicated document called PQR, then (APPENDIX 1 / 12 / ) the AS-RUN Detail Record can be considered that document as it includes all the essential and non-essential variables recorded during procedure qualification. Please refer to line pipe certificate no. 19-0196 / page 24, included in the Welding Book. The line Re check this values , C% base metal itself is having 0.10 pipe for WPQT (pipe no 6016/ heat no 476192) 2. % max, has the C% = 0.04, therefore C% = max 0.06 is (APPENDIX 1 / 12 / ) reported in the WPS. The C% = 0.10 is the nominal value. Reviewed by: _________
Challenges and Approaches for Selecting, Assessing and Qualifying Commercial Industrial Digital Instrumentation and Control Equipment for Use in Nuclear Power Plant Applications