DOCUMENT SUBMITTAL FORM -CONSTRUCTION CONTRACTORS

Contract No: 883 I Work Package: CN12


TITLE: Method Statement SUBMITTAL NO: 883-4-Z04-W04Z -C-CN12-RCC-SBT-C0-0115
TO: EHAF Consulting Engineers REV. NO.: 00
FROM: Ruwad Civil Construction (RCC) DATE: 07 July-2014
ATTN: Mr. Ahmed Atta (CRE) ORIG. REF: -

I
TYPE OF SUBMITTAL 0 PQD - Pre-Qualification
0 SDS - Shop Drawing Schedule 0 SMP - Samples 0 OMM - Operating & Maintenance Manuals
0 SCE - Program I Schedule 0 SHD -Shop Drawings 0 QPP - Quality Plans & Procedures -
0 ITP - Inspection & Test Plan 0 MUP - Mock Ups & QC Panels 0 INC - Insurance Certificates
1:8] MST - Method Statement 0 TST- Test reports 0 PBW - Bonds, Guarantees, Warranties

0 MPD - Product & Materials Data


0 ABO - As Built Drawings
0 OTH -Others-
SUBMITTAL DISCIPLINE & DESCRIPTION
1:8] C-Civil 0 S-Structural 0 A -Architectural 0 E-Eiectrical OM-Mechanical 0 G-General 0 0-Coordination
0 !-Interior Design 0 T-Sections 0 U-Urban I Master Planning
Method Statement for C01 Part 2/4 Casting

SPECIFICATION & BOQ REF:

SUBMITTED FOR
~ A-Approval
- Location I Use

D R-Review & Comments D Q-As Requested D !-Information I Records Only D N-Action D 0-0thers
Engr. Hani Aburaia
Submitted By Contractor's Rep.: (Construction Manager) Signature:

Name: Signature: Date:

CLIENT'S COMMENTS (optional)

Name: Signature: Date:


---
SUPERVISION CONSULTANT'S COMMENTS
D A -Approved D B -Approved As Noted, Work May D C- Approved With Comments, D D- Rejected D N -Noted
Proceed - Incorporate Comments Work May Not Proceed ,
& Resubmit Within ...... Days Revise & Resubmit

D R -Reviewed As Compliant D S- Reviewed As Noted , lncorp. Comments D T- Reviewed With Comments, Revise I Resubmit

For & On behalf


Name: Signature: Date:

Page 1 of 1 Doc./Form No: PSA-883-PP-02-06-FM Rev.2


Revision Date: 15-Mar-2011
/

DOCUMENT TRANSMITTAL FORM (DTF)


Contract No:883 Work Package:CN12

TO: M/S. EHAF Consulting Engineers TRANS. N0:883-4-Z04-W04Z-C-CN 12-RCC-ECE-TRN-HA-0202


FROM: Ruwad Civil Construction (RCC) DATE: July 07-2014
ATTN: Mr. Ahmed Atta (CRE) C/REF:

WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN:


[8l Documents [8l Approval D A -Approved

D Drawings/Sketch D Review & Comments D 8 -Approved as noted,


lncor orate Comments
D Report D As Requested D C- Approved with Comments,
Revise & Re-submit
D Change Order D Information I Records Only
D Letter D For Necessary Action D D- Rejected
D Invoice D Other: D N- Noted
D 80Q/Specification SENT VIA: D R- Reviewed as Compliant
[8l D S- Reviewed as Noted,
D Other: Method Statement Attached
lncor orate comments

D Separate Cover D T- Reviewed with comments,


Revise & Re-submit

Item Submittal or Document No. Rev. Date Description of Submittal or Copies


No. No. Document Title
883-4-Z04-W04Z-C-CN12-
00 07-July-14 Method Statement for C01 Part 2/4 Casting 3 Hard
RCC-SBT -C0-115
As per attached 2 Soft

Response: *Approval Status*: j

Item Submittal or Document


Rev Date Description of Submittal ~Document Title Status
No. Ref. No. ~ . ~
//'.~~ ~ .. , J'l) ~
(/~···;/ ~~--~
~ ~ ~\ *
1{\ ~ ~' 1 ~-
• .--,.'
;,-;
''~
~ J

Sender Name:
Designation: 6:~~;~~~9~ ·····-··..··

Received By Recipient Date Title


Copy Distribution
D Jabal Omar Development Co 1:8:1 Hill International D D

*Legends: A- Approved 8- Approved As Noted, Incorporate Comments C- Approved With Comments, Revise & Resubmit D- Rejected
R- Reviewed As Compliant S-Reviewed As Noted, Incorporate Comments T -Reviewed with comments, Revise & Resubmit N- Noted
Page 1 of 1 DocJForm No: PSA-883-PP-02-05-FM Rev.O