You are on page 1of 3

ESTIMATE OF MATERIALS

 Cement, Gravel, Sand


1. FOOTINGS

F1
L W D No.
2 2 0.3 10

Volume = (2)(2)(0.3)(10)
Volume = 12m³
Using class "A" mix;
Cement = 12*9 = 108 Bags
Sand = 12*0.5 = 6 m³
Gravel = 12*1 = 12 m³
F2
L W D No.
4 2 0.3 2

Volume = (4)(2)(0.3)(2)
Volume = 4.8m³
Using class "A" mix;
Cement = 4.8*9 = 44 Bags
Sand = 4.8*0.5 = 2.4 m³
Gravel = 4.8*1 = 4.8 m³

2. FOOTING POST

L W H No.
0.4 0.4 2 14

Volume = (0.4)(0.4)(2)(14)
Volume = 4.48m³
Using class "A" mix;
Cement = 4.48*9 = 41 Bags
Sand = 4.48*0.5 = 2.3 m³
Gravel = 4.48*1 = 4.5 m³

4. BEAMS

 GROUND FLOOR BEAM


MB1

D W L
0.45 0.3 60.1

Volume = (0.45)(0.3)(60.1)
Volume = 8.1135m³
Using class "A" mix;
Cement = 8.1135*9 = 74 Bags
Sand = 8.1135*0.5 = 4.1 m³
Gravel = 8.1135*1 = 8.2 m³
MB2
EB

D W L D W L
0.45 0.3 17.85 0.45 0.3 17.6

Volume = (0.45)(0.3)(17.85) Volume = (0.45)(0.3)(17.6)


Volume = 2.40975m³ Volume = 2.376m³
Using class "A" mix; Using class "A" mix;
Cement = 2.40975*9 = 22 Bags Cement = 2.376*9 = 22 Bags
Sand = 2.40975*0.5 = 1.3 m³ Sand = 2.376*0.5 = 1.2 m³
Gravel = 2.40975*1 = 2.5 m³ Gravel = 2.376*1 = 2.4 m³

CB

D W L
0.45 0.3 14

Volume = (0.45)(0.3)(14)
Volume = 1.89m³
Using class "A" mix;
Cement = 1.89*9 = 18 Bags
Sand = 1.89*0.5 = 1 m³
Gravel = 1.89*1 = 1.9 m³
 ROOF BEAM
RB1 RB2

D W L D W L
0.4 0.25 24.9 0.4 0.25 44.5

Volume = (0.4)(0.25)(24.9) Volume = (0.4)(0.25)(44.5)


Volume = 2.49m³ Volume = 4.45m³
Using class "A" mix; Using class "A" mix;
Cement = 2.49*9 = 23 Bags Cement = 4.45*9 = 41 Bags
Sand = 2.49*0.5 = 1.3 m³ Sand = 4.45*0.5 = 2.3 m³
Gravel = 2.49*1 = 2.5 m³ Gravel = 4.45*1 = 4.5 m³

CB EB
D W L D W L
0.45 0.3 8 0.45 0.3 8.1
Volume = (0.45)(0.3)(8) Volume = (0.45)(0.3)(8.1)
Volume = 1.08m³
Using class "A" mix; Volume = 1.0935m³
Cement = 1.08*9 = 10 Bags Using class "A" mix;
Sand = 1.08*0.5 = 0.6 m³ Cement = 1.0935*9 = 10 Bags
Gravel = 1.08*1 = 1.1 m³ Sand = 1.0935*0.5 = 0.6 m³
Gravel = 1.0935*1 = 1.1 m³

5. SLAB
 GROUND FLOOR SLAB
D AREA
0.1 126.07

Volume = (0.1)(126.07)
Volume = 12.607m³
Using class "A" mix;
Cement = 12.607*9 = 114 Bags
Sand = 12.607*0.5 = 6.4 m³
Gravel = 12.607*1 = 12.7 m³