1.2 m
FOOTING
REBAR
F1: 9 x 2 x 1.5 x 16 = 432 m3
F2: 7 x 2 x 1.2 x 2 = 33.6 m3
1.2 m
423 + 33.6 = 465.6 m3
465.6
1.5 m
No. of RSB = 6 = 79 pcs (Therefore 79-16mm ∅)
TIRE WIRE
F1: 9 X 9 X 16 = 1296
F2: 7 X 7 X 2 = 98 F2
1296 + 98 = 1394 F1 THICKNESS = 0.30 m
0.3 𝑥 2 THICKNESS = 0.35 m L = 1.2 m
1394 ( ) = 15.78𝑘𝑔 ≈ 16 kg W = 1.2 m
53 L = 1.5 m
W = 1.5 m 7 x 7 bars
CONCRETE WORKS 9 x 9 bars
V1.5m = 1.5 x 1.5 x 0.35 x 16 = 12.6 m3
V1.2m = 1.2 x 1.2 x 0.30 x 2 = 0.864 m3
Vtotal = 13.646 m3
GRAVEL BEDDING
VF1gravebed: 1.5 x 1.5 x 0.1 x 16 = 3.6 m3
VF2gravelbed: 1.2 x 1.2 x 0.1 x 2 = 0.288 m3
Total Volumegravelbed: 3.6 m3 + 0.288 m3 = 3.888 m3
EXCAVATION
VF1excavation: 1.5 x 1.5 x 1.6 x 16 = 57.6 m3
VF2excavation: 1.2 x 1.2 x1.3 x 2 = 3.744 m3
Vtotalexcavation: 57.6 + 3.744 = 61.344 m3
BACKFILL
Excavation – Volume – Gravel Bedding
61.344 – 13.464 – 3.888 = 43.992
COLUMN
CONCRETE WORK
L1 = 1.15 + 4 = 5.15 m
VL1F1 = 5.15 x 0.35 x 0.35 x 16 = 10.094 m3
L2 = 0.9 + 4 = 4.9 m
VL2F2 = 5.15 x 0.35 x 0.35 x 16 = 0.882 m3
Vtotal = 10.976 m3
Column 1:
4[350 − 2(40)] + (2)(4)(10) = 1160mm ≈ 1.2 m
(4)(190) + (2)(4)(10) = 840 mm ≈ .85 m
42 x 1.2 x 16 = 806.4
42 x 0.85 x 16 = 571.2
806.4 + 571.2 = 1377.6
1377.6
= 229.6 ≈ 230 (230-10mm∅)
6
Column 2:
4[300 − 2(40)] + (2)(4)(10) = 960 mm ≈ 1 m
(4)(155) + (2)(4)(10) = 700 mm ≈ .7m
41 x 1 x 16 = 82
41 x .7 x 16 = 57.4
82 + 57.4 = 139.16
139.16
= 23.193 ≈ 24 (24-10mm∅)
6
TIE WIRE
C18RSB: 42 x 8 x 16 = 5376
C28RSB: 41 x 8 x 2 = 656
5375 + 656 = 6032
C14RSB: 42 x 4 x 16 = 2688
C24RSB: 41 x 4 x2 = 328
2688 + 328 = 3016