You are on page 1of 14

Temporary Construction Facility

Contract No: 660004138

JSA Scaffolding Erection, Dismantling and Modifications.

S# JOB STEPS/LIST OF Potential HAZARDS HAZARDS CONTROL RESPONSIBLE PARTY


ACTIVITIES
1  All workforce shall undergo HSE
training orientation from the client. Permit Reciever
Site Preparation Permit Issuer
 Untrained Personal  Specific training for additional work Scaffolding Supervisor
shall be attended for additional HSE Manager
knowledge. HSE Officer

 Tool Box Talk and Total safety


instruction shall be conducted
prior to any activity

 Substandard Equipment  All full body harness to be used


shall conform ANSI Z359.1

 Suspension trauma shall be


attached with Full body harness
Temporary Construction Facility
Contract No: 660004138

2  Scaffolding skills to complete the task


 General Planning correctly.

 Scaffolder with third party


certification only are allowed to
perform scaffolding task.

 Saudi Aramco certified Scaffolding


supervisor shall be present to conduct
inspection on the scaffolding Erection
modification alteration work.
 Inadequate Training
 Hard barricade must be in place

 Scaffolding upto 6m shall be


inspected by Saudi Aramco certified
supervisor

 Scaffolding above 6m shall be


inspected by both SA certified
Supervisor and SA certified Inspector
Temporary Construction Facility
Contract No: 660004138

 All the contractors/sub-contractors


must ensure that Scaffolding work
permit and elevated work permit are
completed and approved before
starting the activity

 Permits shall be signed by Scaffolding


 Unsuitable scaffold due supervisor and HSE department
to lack of competency in
erection  For special scaffolds 38m and higher
shall have an approved Engineer
design by PMT/CSD attached to the
permit.

 Scaffolding supervisor contineousely


monitoring the situation.

 Work will be stopped in case of


Supervisor not present on site.
Temporary Construction Facility
Contract No: 660004138

3 Permit Reciever
 Erection of base  Sole boards to be correct length for Permit Issuer
frame standard and  Unsupported frame or soft ground Scaffolding Supervisor
bracing standard being erected at HSE Manager
ground level  3 planks to be used for temporary HSE Officer
work plateform Scaffolding Inspector
Work Engineer
 Base plates and screw jack used under
all the frame and standards

 Foundation to be level or screw jack to


be used
 Ledgers and transom shall be spaced
vertically not morethan 2m apart
Temporary Construction Facility
Contract No: 660004138

4 Erection of working  Manual handling  2 persons to pass material to high lift Permit Reciever
platform. Permit Issuer
 Split uneven decks installed  Working decks to be at same height at Scaffolding Supervisor
least 12-inch overlap on every HSE Manager
scaffolding plank whenever necessary.
HSE Officer
 Base frames not adequately
braced or supported.

5 . Erection of edge  Climbing on the outside of  climbing on the outside of scaffold will Permit Reciever
protection, ladder & scaffold be prohibited. Permit Issuer
toe board and Gin Scaffolding Supervisor
wheel  Ladder will be installed to serve as safe HSE Manager
access to all scaffold users
HSE Officer
Scaffolding Inspector

 Falling object  Ground level shall be properly Permit Reciever


barricaded to restrict unauthorized Permit Issuer
entry and post warning signs Scaffolding Supervisor
“SCAFFOLD WORK IN PROGRESS KEEP HSE Manager
AWAY.
 Canvas bucket with the attachment of HSE Officer
18mm rope shall be use and visually
inspected prior use.
Temporary Construction Facility
Contract No: 660004138

 Falling from height  When getting the materials in the Permit Reciever
canvas bucket, worker / scaffolder shall Permit Issuer
comply with 100% tie off on permanent Scaffolding Supervisor
structure or installed lifelines HSE Manager
 Scaffolder / worker shall not stand in HSE Officer
the edge of a scaffold platform to get
the materials from canvas bucket.
Implement double hook
 Scaffold adequately braced to prevent Permit Reciever
movement while edge protection is Permit Issuer
 Movement of Scaffold
fixed Scaffolding Supervisor
 Handrail positioned not below 950mm HSE Officer
and above 1150mm of the working
platform on all sides Scaffolding Inspector

 Edge protection incomplete  Mid rail, top rail and toe board shall be Permit Reciever
installed Permit Issuer
Scaffolding Supervisor
HSE Officer
Temporary Construction Facility
Contract No: 660004138

 No Rope and Gin wheel Permit Reciever


Gin wheel shall be mounted on a Permit Issuer
cantilevered horizontal tube projecting Scaffolding Supervisor
outward from the scaffold and shall be HSE Officer
kept minimum distance, not greater
that 750mm. Tube shall be fixed with Scaffolding Inspector
right angle coupler to two scaffold post
(standard)

 Material to be raised shall not exceed


50kg. The rope shall be of the correct
size to suit the gin wheel but not less
than 18mm
 Inappropriate access to Permit Reciever
working deck  No climbing up or down the outside of Permit Issuer
the scaffold Scaffolding Supervisor
 Ladder access to be installed HSE Officer
 Fixed Ladder to be positioned internally
for scaffold more than 3 meters in Scaffolding Inspector
height and at the appropriate angle 1:4
i.e. for every 4 meters in height 1 meter
out from the base
 Ladder to be secured at the top and
bottom
 Ladder to project at least 1 meter
above the working platform.
Temporary Construction Facility
Contract No: 660004138

 Access openings through working


platforms shall be protected by a sturdy
guardrail system with a self-closing
drop bar/self-closing swing gate (at top
rail height)
6  Erection of 12mm  Fall hazards Permit Reciever
wire rope Life line.  Personnel shall not be exposed to Permit Issuer
12mm unprotected sides or fall greater than 6 Scaffolding Supervisor
ft. (1.8 meter). HSE Manager
 when installing the wire rope / life line,
work will not be permitted during sand HSE Officer
storms, rains and high winds. Work Engineer
 Installation of wire rope must be done Scaffolding inspector
one at a time, from one scaffold to
another
 Remove unnecessary materials on the
work area that will pose trip hazards.
 Use double lanyard full body harness
and always Implement 100 % tie off on
scaffold while doing the installation
 Implement buddy system
Temporary Construction Facility
Contract No: 660004138

 Nylon rope attached to the end of the


wire rope will be provided to transfer
the other end of the wire rope to other
side of the scaffold were it will also be
attached to lessen the movement of
workers on the roof.
7 Scaffold Inspection Improper tagging / Use of Scaffolding Supervisor
unsafe scaffold.  Red tag scaffold must be hang in the Scaffolding Inspector
access ladder during duration of
erection.

 The scaffold shall be inspected as per


SA standard; GI 008.001 shall be
observed/ follow for inspection and
tagging.

 The scaffolds 6 meters or less shall be


tagged by scaffold supervisor.

 Scaffold with more than 6-meter height


shall be inspected by both SA certified
Supervisor and inspector
8  Modification,  Fall from Elevated Heights Permit Reciever
Alteration and  100% fall protection required during Permit Issuer
Dismantling of disassembly. Scaffolding Supervisor
Temporary Construction Facility
Contract No: 660004138

scaffold HSE Officer


 Personnel shall not be exposed to
unprotected sides or falls greater than
6 ft. (1.8 meter).
 Personnel shall wear double lanyard full
body harness and implement 100% tie
off procedure
 Vertical lifeline shall be secured to an
anchor point 5,000 lbs. (2,267.9kg) per
individual.
 Weather conditions must be
considered when erecting, dismantling
or moving scaffold boards and poles.

 Collapse of scaffold Permit Reciever
 All Scaffolds shall be properly braced Permit Issuer
and planks shall be fixed securely in Scaffolding Supervisor
position HSE Manager
 All Scaffold shall be designed to enable
them to safely support 4 times the HSE Officer
intended load Scaffolding Inspector
 Lower dismantled scaffold components Work Engineer
safely. Do not throw from the scaffold.
 Scaffold frames and components made
by different manufacturers shall not be
inter mixed unless the parts and
materials are specifically made to
Temporary Construction Facility
Contract No: 660004138

compatible.
 Scaffold frames and components made
by different manufacturers shall not be
inter mixed unless the parts and
materials are specifically made to
compatible.

  Using defective tools Scaffolding Supervisor


 Supervisor shall check all hand tools are HSE Officer
properly inspected with current Permit Reciever
monthly color code. Tools must be
appropriate for the specific task.
 Supervisor shall ensure that all tools are
standard prior to use.
 Fabricated / homemade tools are not
allowed to use
9  . Housekeeping  Slip and Trips Permit Reciever
 Wearing of all mandatory PPE is Scaffolding Superviso
required to all workers even during HSE Officer
housekeeping. Construction Supervisor
 Remove all unwanted materials from
the work area and return all tools to
site store.
 All tools unused shall be return to store
for safe keeping
 Remove tubular and scaffold materials
Temporary Construction Facility
Contract No: 660004138

from walkways
 Always implement proper
housekeeping during, before and after
work.
10  Demobilization  Vehicular accident Permit Reciever
 Ensure PWAS on equipment is Permit Issuer
functional. Scaffolding Supervisor
 Ensure PWAS on equipment is HSE Manager
functional.
 Reflective vest shall be utilized HSE Officer
Construction Manager

11  Emergency response  Inadequate emergency


response  Inform to Azmeel Emergency contacts Scaffolding Supervisor
numbers in case of emergency HSE Manager
 Ensure that all the staff understands HSE Officer
the action required during emergency
situation.
 Ensure availability of the first aiders,
ambulanced with driver and first aid kit
as per SA requirement.
 The emergency contact phone numbers
shall be displayed at site in visible
location.
 All the staff should be familiar with the
Temporary Construction Facility
Contract No: 660004138

closest ambulance point at site and


emergency contact numbers.

Activity: Scaffolding Erection Dismantling, Modification JSA


Approval Name Date Signatures

SAPM Safety
Temporary Construction Facility
Contract No: 660004138

JSA Azmeel Staff Name Date Signatures

Project Manager Engineer Muhammad Fatayar

HSE Manager Saad Al Doosry

Safety Officer