ONGOING CONSTRUCTION
ACTIVITIES

• Ongoing nighttime closure on I-95


from NW 8 Street to NW 29 Street for
concrete replacement on southbound
lanes
*•This schedule
Ongoing does
bridge not reflect
approach days added to the contract for
slab
holidays, weather days or special events
replacement

• Concrete pavement replacement is


approximately 90% complete

3
ONGOING AND UPCOMING
CONSTRUCTION ACTIVITIES

* This schedule does not reflect days added to the contract for
holidays, weather days or special events

4
ONGOING LANE THREE MONTH LOOK
CLOSURES AHEAD

* This ANTICIPATED
schedule does NIGHTTIME
not reflect days added
LANE to the contract
CLOSURES ON THEfor I-95 CORRIDOR:
holidays, weather days or special events
• Nighttime lane closure along I-95 between NW 8 Street and NW 29
Street
• Closure of I-95 entrance/exit ramps at NW 8 Street
• I-95 ramps to I-395 and SR 836
• Lane closure hours – 9 p.m. to 5:30 a.m. weeknights, and 11 p.m. to 11
a.m. on Fridays and Saturdays
• Full I-95 closures are anticipated for approach slab replacement work

5
ONGOING AND UPCOMING
CONSTRUCTION ACTIVITIES

• Ongoing widening of the


eastbound SR 836 ramp to
northbound I-95 for an additional
* Thislane
schedule does not reflect days added to the contract for
holidays, weather days or special events
• Contractor has started installing
steel bridge beams for ramp
widening

1-25-2021

6
ONGOING AND UPCOMING
CONSTRUCTION ACTIVITIES

* Ongoing widening on eastbound


This schedule does not reflect days added to the contract for
SR 836 from NW 10 Avenue to I-95
holidays, weather days or special events

1-25-2021

7
ONGOING AND UPCOMING
CONSTRUCTION ACTIVITIES

Removal of median area on SR 836


from NW 12 Avenue to NW 17 Avenue
completed
* This schedule does not reflect days added to the contract for
holidays, weather days or special events

1-25-2021

8
ONGOING AND UPCOMING
CONSTRUCTION ACTIVITIES

AUGER CAST PILE (ACP)


FOUNDATIONS

• • Total of 507 ACP


Ongoing willand
footer be used for construction between the Toll Gantry and NW 17
column
viaduct foundations. 257 installed
Avenue
to date.

• Ongoing footer and column


construction on SR 836 median
between the toll gantry and NW
17 Avenue

1-25-2021

9
ONGOING AND UPCOMING
CONSTRUCTION ACTIVITIES

• Ongoing footer and column construction between the Toll Gantry and NW 17
Avenue

10
CASTING YARD FOR DOUBLE-DECKED
SR 836 BRIDGE CAPS

* This schedule does not reflect days added to the contract for
holidays, weather days or special events

Total number of CAPs – 140


CAPs cast to date - 13

11
SR 836 BRIDGE CAP AND BEAM INSTALLATION

* This schedule does not reflect days added to the contract for
holidays, weather days or special events

12
ONGOING LANE THREE MONTH LOOK
CLOSURES AHEAD

* This schedule does not reflect days added to the contract for
holidays, weather days or special events
ANTICIPATED NIGHTTIME LANE CLOSURES ON SR 836 CORRIDOR:

• Single and double lane closures along eastbound and westbound SR 836
• SR 836 ramps to northbound and southbound I-95
• Arterial roads under SR 836
• NW 17 Avenue and NW 12 Avenue ramps to SR 836
• Lane closure hours – 9 p.m. to 5:30 a.m. weeknights, and 11 p.m. to 7
a.m. on Fridays and Saturdays

13
ONGOING AND UPCOMING
CONSTRUCTION ACTIVITIES

• Ongoing Auger ACP


installation for signature bridge
Arches # 5 foundation, Arch #
4 ACP completed.
SR 836 UPCOMING CONSTRUCTION ACTIVITIES
Segmental ACP – 355/857
Signature ACP – 286/520

Arches #1 and #2 Completed

1-25-2021

14
ONGOING AND UPCOMING Segments erected to date: 260
CONSTRUCTION ACTIVITIES

11-24-2020 1-25-2021

15
ONGOING AND UPCOMING
CONSTRUCTION ACTIVITIES

16
ONGOING AND UPCOMING Second segmental erection crew working
CONSTRUCTION ACTIVITIES just west of NW 1 Place and south of I-395

SR 836 UPCOMING CONSTRUCTION ACTIVITIES

11-24-2020 1-25-2021

17
ONGOING AND UPCOMING
CONSTRUCTION ACTIVITIES

18
ONGOING AND UPCOMING
CONSTRUCTION ACTIVITIES

Integral pier for eastbound I-395 collector


distributor bridge
Total number of I-395 piers: 94
Total number completed to date: 30

19
ONGOING AND UPCOMING Closure of NW Miami Court and NW 13
CONSTRUCTION ACTIVITIES Street for installation of bridge segments

20
UPCOMING & ONGOING
CONSTRUCTION ACTIVITIES

* This schedule does not reflect days added to the contract for
holidays, weather days or special events

1 Traffic shift on Biscayne Boulevard from NE 13 Street to NE 11 Terrace.


Shift lanes to the outside. There will be three NB Lanes (two through
lanes and one left turn lane onto NE 13 Street) and three SB Lanes (two
through lanes and one left turn lane onto EB MacArthur Causeway).
2 Close Bayshore loop ramp to EB MacArthur Causeway (March 2021)

21
SEGMENTAL CASTING YARD

SR 836 UPCOMING CONSTRUCTION ACTIVITIES

22
SEGMENTAL CASTING YARD

SR 836 UPCOMING CONSTRUCTION ACTIVITIES

Total Segments: 1949


Total Segments Cast to Date: 562

23
ONGOING LANE THREE MONTH LOOK
CLOSURES AHEAD

ANTICIPATED NIGHTTIME LANE CLOSURES ON I-395 CORRIDOR:


SR 836 UPCOMING CONSTRUCTION ACTIVITIES
• Lane closures along eastbound and westbound I-395
• Lane closures along Biscayne Boulevard and other arterial roadways
adjacent to I-395
• Permanent closure on NW Miami Court implemented between NW 13
Street and NW 12 Street
• Closure hours – 10 p.m. to 5:30 a.m. on weeknights, and 1 a.m. to 7
a.m. on Saturdays and Sundays

24
COMMUNITY OUTREACH

PROJECT WEBSITE

• www.i-395miami.com

• Sign-up for project alerts/updates


Lane closure information
Upcoming construction activities
Presentations

• Calendar of events

OUTREACH OFFICE IN THE OVERTOWN COMMUNITY

• 1035 NW 3 Avenue, Miami, Florida 33136 (CLOSED AT


THIS TIME)

STAKEHOLDER MEETINGS
• Stakeholder meetings will be held virtually until further
notice. Next meeting TBD.