PROCEDURE CHECKLIST

ELECTRICAL FEEDERLINES

I. PRE-MOBILIZATION
Receive recommendation from Costing Department signed by Operations Manager
Conduct actual inspection/survey at site for estimate validation
Reconciliation and comparison of materials needed between Estimate Engineer and
actual surveyor (implementing person)
Request the materials needed for implementation of projects thru MR (Material Request)
Coordinate with client prior mobilization for work permit purpose

II. MOBILIZATION
Delivery of materials and tools at site
Mobilization of workers (Electrician & Helper) at site
III. IMPLEMENTATION PROCESS
Cutting and fabricating of hangers and supports
Installation of hangers and supports
Installation of conduits, boxes and fittings
Installation of wires/cables (cable pulling), panelboards and ECB's
Termination of cables at tapping point and load point
IV. TESTING AND COMMISSIONING (ENERGIZATION)
Request the client to witness the testing of feederlines
Conduct continuity test (using continuity tester)
Conduct insulation resistance test (must pass the standard passing rate of client)
Energization of feederlines (c/o client)
Conduct phase sequence test (to avoid reverse phasing failure)
Submit test result to client (make sure that the result is signed and conformed by witnessed)
Submit as-built plan of works done if required
V. DE-MOBILIZATION
Cleaning of work area
List down all remaining/scrap materials, tools and equipment for pull-out
HILMARC'S
HILMARC'S
HILMARC'S
HILMARC'S CONSTRUCTION
CONSTRUCTION
CONSTRUCTION CONSTRUCTION
Request
CORPORATION
CORPORATION
CORPORATION pull-out permit and gate pass from client CORPORATION
E. Rodriguez Sr. Ave, Cubao, 1835
.HILMARC'S
.HILMARC'S
E..HILMARC'S
E. Rodriguez Rodriguez
E. CONSTRUCTION
Sr. Ave,
Rodriguez CONSTRUCTION
Sr.Sr.
Ave,CONSTRUCTION
Ave,
Cubao,
Cubao, Q.CQ.C
Cubao, 1835
Q.C
1835
1835
Tel Request
No.:
Tel
CORPORATION Tel
No.:
+632
CORPORATIONNo.:
+632
+632
CORPORATION personnel
726-9471
726-9471
726-9471
to 73to*73
to
+632
73
* +632 at head
*726-9475
+632
726-9475
726-9475 tooffice to audit the materials
to to 77 and tools
.Q.C
for pull-out
Tel No.: +632 726-9471 to 73 * +632
77 Fax
.HILMARC'S 77 No.:
.HILMARC'S
E.HILMARC'S
E. Rodriguez +632
.Rodriguez
E. Rodriguez723-8539
CONSTRUCTION
Sr. Ave, CONSTRUCTION
Sr.Sr.
Ave,CONSTRUCTION
Cubao,
Ave,
Cubao,
Cubao,
Q.CQ.C1835
Q.C
1835
1835 726-9475 to 77
Fax
Tel Egress
No.:
No.:
Tel
CORPORATION Fax
Tel +632
No.:
CORPORATIONNo.:
+632
No.:
+632 of
723-8539
+632
726-9471
+632
CORPORATION all
726-9471
726-9471pull-out
723-8539
to 73to*73
to
+632
73
* +632 items
*726-9475
+632
726-9475
726-9475
to to 77
to Fax No.: +632 723-8539
.77
E. Fax
HILMARC'S 77 No.:
HILMARC'S +632
HILMARC'S
Rodriguez
. E. . Rodriguez
E. Rodriguez
Sr. 723-8539
CONSTRUCTION
Ave,
Sr. CONSTRUCTION
Sr.
Ave,CONSTRUCTION
Cubao,
Ave,
Cubao,
Cubao,
Q.CQ.C1835
Q.C
1835
1835
FaxNo.:
Tel No.:
Tel Fax
Tel +632
No.:No.:
+632
No.: 723-8539
+632+632
726-9471
+632 723-8539
726-9471
726-9471
to 73to*73
to
+632
73
* +632
*726-9475
+632
726-9475
726-9475
to to 77
to
CORPORATION
CORPORATION
CORPORATION
77 Fax
.E.77
E.No.:
.E. Rodriguez +632
.Rodriguez
Rodriguez723-8539
Sr. Ave,
Sr. Sr.
Ave,
Cubao,
Ave,
Cubao,
Cubao,
Q.CQ.C1835
Q.C
1835
1835
Fax No.:
Fax +632
No.:723-8539
+632 723-8539
Prepared by:
Tel No.:
TelTel
No.:
+632
No.:
+632
726-9471
+632
726-9471
77 Fax77No.: +632 723-8539
726-9471
to 73to*73
to
+632
73
* +632
*726-9475
+632
Checked by:
726-9475
726-9475
to to 77
to
Noted by:
Fax No.:
Fax+632
No.:723-8539
+632 723-8539
Santiago Jancilan Jr. Dani P. Villados
Project Engineer Project Manager Operations Manager
HILMARC'S CONSTRUCTION
CORPORATION
.E. Rodriguez Sr. Ave, Cubao, Q.C 1835
Tel No.: +632 726-9471 to 73 * +632 726-9475 to 77
Fax No.: +632 723-8539

You might also like