PEMERINTAH KOTA PALEMBANG

FORMULIR PENGUJIAN PENETROMETER KONUS DINAMIS


DINAS PEKERJAAN UMUM DAN PENATAAN
RUANG TEST DYNAMIC CONE PENETROMETER FORMULIR
PALEMBANG CITY SEWERAGE PROJECT PACKAGE A2
Location : ABR ZONA 3 Date : 28-11-20
Tested by : M.LUKY
Device S.N. : DCP-01 Signature :
Conus Angle : 60°

Standard : Surat Edaran Menteri Pekerjaan Umum No. 04/SE/M/2010

Formula : for coarse material test using 60ᵒ conus angle


Log10(CBR) = 2.4771 - 1.125 Log10(DCP(mm/blow))

CBR = 10^(2.4771 - 1.125Log(DCP(mm/blow)))


Bacaan DCP Kumulatif Penetrasi
Banyak Tumbukan Kumulatif Tumbukan DCP CBR
No DCP Reading Cumulative Penetration
Number of Blow Cumulative of Blow (mm) (mm) (mm/blow) (%)
1
0 0 75 0 0 0
2
1 1 150 75 75.0 2.33
3
1 2 205 130 65.0 2.74
4
1 3 255 180 60.0 3.00
5
1 4 291 216 54.0 3.37
6
1 5 322 247 49.4 3.73
7
1 6 359 284 47.3 3.91
8
1 7 390 315 45.0 4.14
9
1 8 426 351 43.9 4.26
10
1 9 462 387 43.0 4.36
11
1 10 494 419 41.9 4.49
12
1 11 529 454 41.3 4.57
13
1 12 563 488 40.7 4.64
14
1 13 601 526 40.5 4.67
15
1 14 639 564 40.3 4.69
16
1 15 680 605 40.3 4.69
17
1 16 719 644 40.3 4.70
18
1 17 763 688 40.5 4.67
19
1 18 839 764 42.4 4.42

CUMM. BLOW
0 4 8 12 16 20
0
100
200
CUMM. PENETRATION (CM)

300
400
500
600
700
800
900
1000

CONTRACTOR CMC EMPLOYER


Name : Name : Name :

Signature : Signature : Signature :

Date : Date : Date :


PEMERINTAH KOTA PALEMBANG
FORMULIR PENGUJIAN PENETROMETER KONUS DINAMIS
DINAS PEKERJAAN UMUM DAN PENATAAN
RUANG TEST DYNAMIC CONE PENETROMETER FORMULIR
PALEMBANG CITY SEWERAGE PROJECT PACKAGE A2
Location : ABR ZONA 3 Date : 28-11-20
Tested by : M.LUKY
Device S.N. : DCP-01 Signature :
Conus Angle : 60°

Standard : Surat Edaran Menteri Pekerjaan Umum No. 04/SE/M/2010

Formula : for coarse material test using 60ᵒ conus angle


Log10(CBR) = 2.4771 - 1.125 Log10(DCP(mm/blow))

CBR = 10^(2.4771 - 1.125Log(DCP(mm/blow)))


Bacaan DCP Kumulatif Penetrasi
Banyak Tumbukan Kumulatif Tumbukan DCP CBR
No DCP Reading Cumulative Penetration
Number of Blow Cumulative of Blow (mm) (mm) (mm/blow) (%)
1
0 0 63 0 0 0
2
1 1 173 110 110.0 1.52
3
1 2 259 196 98.0 1.73
4
1 3 311 248 82.7 2.09
5
1 4 355 292 73.0 2.40
6
1 5 401 338 67.6 2.62
7
1 6 444 381 63.5 2.81
8
1 7 485 422 60.3 2.98
9
1 8 525 462 57.8 3.13
10
1 9 564 501 55.7 3.26
11
1 10 602 539 53.9 3.38
12
1 11 645 582 52.9 3.45
13
1 12 684 621 51.8 3.54
14
1 13 731 668 51.4 3.57
15
1 14 779 716 51.1 3.59
16

17

18

CUMM. BLOW
0 5 10 15
0
100
200
CUMM. PENETRATION (CM)

300
400
500
600
700
800
900
1000

CONTRACTOR CMC EMPLOYER


Name : Name : Name :

Signature : Signature : Signature :

Date : Date : Date :


PEMERINTAH KOTA PALEMBANG
FORMULIR PENGUJIAN PENETROMETER KONUS DINAMIS
DINAS PEKERJAAN UMUM DAN PENATAAN
RUANG TEST DYNAMIC CONE PENETROMETER FORMULIR
PALEMBANG CITY SEWERAGE PROJECT PACKAGE A2
Location : ABR ZONA 3 Date : 28-11-20
Tested by : M.LUKY
Device S.N. : DCP-01 Signature :
Conus Angle : 60°

Standard : Surat Edaran Menteri Pekerjaan Umum No. 04/SE/M/2010

Formula : for coarse material test using 60ᵒ conus angle


Log10(CBR) = 2.4771 - 1.125 Log10(DCP(mm/blow))

CBR = 10^(2.4771 - 1.125Log(DCP(mm/blow)))


Bacaan DCP Kumulatif Penetrasi
Banyak Tumbukan Kumulatif Tumbukan DCP CBR
No DCP Reading Cumulative Penetration
Number of Blow Cumulative of Blow (mm) (mm) (mm/blow) (%)
1
0 0 21 0 0 0
2
1 1 74 53 53.0 3.45
3
1 2 115 94 47.0 3.94
4
1 3 157 136 45.3 4.11
5
1 4 200 179 44.8 4.17
6
1 5 247 226 45.2 4.12
7
1 6 300 279 46.5 3.99
8
1 7 329 308 44.0 4.25
9
1 8 380 359 44.9 4.16
10
1 9 444 423 47.0 3.94
11
1 10 529 508 50.8 3.61
12
1 11 589 568 51.6 3.55
13
1 12 644 623 51.9 3.53
14
1 13 719 698 53.7 3.40
15
1 14 779 758 54.1 3.36
16

17

18

CUMM. BLOW
0 3 6 9 12 15
0
100
200
CUMM. PENETRATION (CM)

300
400
500
600
700
800
900
1000

CONTRACTOR CMC EMPLOYER


Name : Name : Name :

Signature : Signature : Signature :

Date : Date : Date :


PEMERINTAH KOTA PALEMBANG
FORMULIR PENGUJIAN PENETROMETER KONUS DINAMIS
DINAS PEKERJAAN UMUM DAN PENATAAN
RUANG TEST DYNAMIC CONE PENETROMETER FORMULIR
PALEMBANG CITY SEWERAGE PROJECT PACKAGE A2
Location : ABR ZONA 3 Date : 28-11-20
Tested by : M.LUKY
Device S.N. : DCP-01 Signature :
Conus Angle : 60°

Standard : Surat Edaran Menteri Pekerjaan Umum No. 04/SE/M/2010


Formula : for coarse material test using 60ᵒ conus angle
Log10(CBR) = 2.4771 - 1.125 Log10(DCP(mm/blow))

CBR = 10^(2.4771 - 1.125Log(DCP(mm/blow)))


Bacaan DCP Kumulatif Penetrasi
Banyak Tumbukan Kumulatif Tumbukan DCP CBR
No DCP Reading Cumulative Penetration
Number of Blow Cumulative of Blow (mm) (mm) (mm/blow) (%)
1
0 0 15 0 0 0
2
1 1 78 63 63.0 2.84
3
1 2 130 115 57.5 3.14
4
1 3 181 166 55.3 3.28
5
1 4 230 215 53.8 3.39
6
1 5 274 259 51.8 3.54
7
1 6 311 296 49.3 3.74
8
1 7 348 333 47.6 3.89
9
1 8 390 375 46.9 3.96
10
1 9 425 410 45.6 4.09
11
1 10 459 444 44.4 4.21
12
1 11 499 484 44.0 4.25
13
1 12 532 517 43.1 4.35
14
1 13 570 555 42.7 4.39
15
1 14 608 593 42.4 4.43
16
1 15 659 644 42.9 4.37
17
1 16 707 692 43.3 4.33
18
1 17 741 726 42.7 4.39
19
1 18 779 764 42.4 4.42
20
1 19 815 800 42.1 4.46
21
1 20 855 840 42.0 4.48

CUMM. BLOW
0 4 8 12 16 20
0
100
200
CUMM. PENETRATION (CM)

300
400
500
600
700
800
900
1000

CONTRACTOR CMC EMPLOYER


Name : Name : Name :

Signature : Signature : Signature :

Date : Date : Date :