You are on page 1of 22

Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
1.0 Finishing

1.1 Hollow Block Works


All works of this bill shall be of Concrete blocks Grade 35
of high quality standards and as per specifications.
Block works shall be measured in meter square. The
net measurement of the complete elevations, excluding
all openings and voids more than 0.1 M. S. in area.
No allowance for thickness used other than those shown
in the drawings.
Rates of Block works include:-
Vertical and horizontal joints.
Cement and mortar,
Galvanized angles butter fly ties (at joints and between
walls in cavity walls.
Concrete filling at all ends including reinforcing steel to
cavities at quoins and door and window openings,
reveals, sills for windows and the like.
R.C. Door Walls and jambs for doors AND others as per
detailed drawings
Lintels and bond beams to the full lengthg of the wall,, min
20 cm. High and in the same wall thickness of reinforced
concrete grade B-200 with due reinforcement steel, on
top of doors and windows or as specified per drawings.

Window jambs of min. 20 cm width and in same wall


thickness to full height of window.
And all needed to complete job as per drawings and
specifications.
1.1.1 Supply and Build Concrete Block Walls, 'Grade 35’ of
any size blocks.Price for all block work shall include for a
20cm reinforced concrete door and window jamb, as
well as a reinforced concrete lintel above all openings.

Hollow Blocks (10 Ten) cm. Thick. m2 40


1.1.2 Double Hollow Blocks (15 & 10 ) cm. Thick for external
walls, price to include 3cm thick polyurethane rigid m2 385
insulation between the two block walls.
1.1.3 Double Hollow Blocks (10 & 7 ) cm. Thick for external
walls, price to include 3cm thick polyurethane rigid m2 45
insulation between the two block walls.
1.1.4 Hollow Blocks (20 twenty) cm. Thick for internal
partitions and for parapet. m2 350

Total For Section 1.1

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
1.0 Finishing

1.2 Plastering Works


Preambles
PLASTERING to all areas shall be measured net,
including openings, which are less than 0.25 Meter Sq.

The price shall include for running rules , all narrow


widths, for taking out joints on block walls or backing
concrete face for key, for making good to frames
around pipes and other fittings , plastering to jambs
and reveals of openings, side of columns, window sills;
all of which shall be measured as plastering .
Price shall also include Expanded metal lath heavy
gauge "German", angle beads at all appeared corners
for the entire height, labor, curing, erecting and
dismantling of scaffoldings, additives, pigments and all
incidentals required as specified and / or detailed on the
Drawings. Price to includes guides places every wall
places at 1m on center.
Two coats of cement and sand plaster over one slurry
coat to walls and ceilings and where required including
metal lath, angle beads, and all required as per
specifications and drawings.
1.2.1 Internal plaster wherever indicated on drawings and
according to specifications for walls and ceilings m2 1,550
including drop beams.
1.2.2 Ditto, but for plastering for parapet walls, price to include
waterproofing additive (W290) with the last face and m2 80
supercryl paint.
1.2.3 Two Coats of Cement and additional external render
coat (Shliht Acryli 40 ) color Hush White OW 221B by
Titan or equivalent to external walls and where required
including metal Lath, angle beads, plaster stops and all m2 700
required as per Specifications and Drawings. Price
includes two coats waterproofing external quality
supercryl paint.

Total For Section 1.2

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
1.0 Finishing

1.3 Tiling Works


Preambles
1. All tilling works shall be measured net in square
meters. Deducting all opening and voids more than 0.25
M.S.
2. Marble works for steps and treads of stairs shall be
measured in linear meter. The tread, the riser, flight
skirting and water stop shall all be measured as a single
unit in linear meter.
3. Marble works for window sills and other openings
shall be measured in square meter.
4. Parapet coping shall be measured in square meter.
5. Rate shall include preparation of surfaces under tiles
including one coat plaster, Finish to falls and cross falls,
special tile pieces for edges and the like, tile surface
finishing, Plastic spacers. Pointing and cleaning and all
incidentals as per specifications.
6. Tiles to be first choice and free from all defects, Grade
"A" approved by Palestine Standards Institution. Price
includes cement sand fill ratio 1:6, pointing with ready
mix mortar type Mapei, Vitra, or equivalent, and cleaning
of site. All as per drawings and specifications. Engineer
shall approve size and color of tiles.

1.3.1 Supply and Install Granite Porcelain wall tiles Italian


made blue ceramica "Gold Art color cementline creama"
or equivalent size 20*20*0.8 cm. Price to include white
m2 170
round aluminum edges, Price to include one base
plater on which the tiles will be laid.

1.3.2 Supply and Install Non Slip Granite Porcelain Floor Tiles
Italian made blue ceramica "Gold Art color cementline m2 60
creama" or equivalent size 20*20*0.85 cm .
1.3.3 Supply and Install Local Marble Sills, Thresholds, and
wherever needed (3 cm. thick), including parapets.
Set in cement mortar bedding price to include grouting,
m2 53
polishing of face and seen edges.

Total For Section 1.3 Page -1-

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
1.0 Finishing

1.3 Tiling Works


1.3.4 Supply and Install polished Local Marble Chip Terrazzo
Tiles size (30x30x3) cm, for floors and stair landings.
Price to include skirting size (30 * 7 * 2) cm, bedding
cement mortar, grouting, and on site polishing.
All as per Drawings and Specifications. m2 550
1.3.5 Supply and install local marble stairs, price to include the
following:
Treads of 3 cm thick and Risers of 2 cm. thick. Price
shall include supplying and installing local marble for
stair flight skirting in parallel setting to the nosing line at
an average height of 12 cm. and 20 mm. thickness,
15cm wide coping for nosing, and local marble water
stop (5cm wide x 3cm thick x length as wide as the tread
of the stair minus riser thickness) fixed at the end of
treads. Also the price to include filling under tiles with
cement and sand 1: 6 ratio, bedding in cement mortar,
grouting, pointing, polishing of face and all related works.

Note: The measurement for each stair will be from the


adjacent wall to the external edge of the water stop of
that stair. mr 68
1.3.6 Supply and install (1000mm high x 600 mm deep x 30
mm thick) local marble partitions between urinals
embedded 200 mm minimum into walls tiles, and
supported on concrete floor slab. No. 2

Total For Section 1.3 Page -2-

Total For Section 1.3 Page 1-2

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
1.0 Finishing

1.4 Carpentry
Preambles
Sizes of carpentry works given in the Bills of Quantities
are finished sizes and shall be as per Drawings.

Sizes of doors and other items mentioned in the Bills of


Quantities shall allow for tolerance to suit the structural
openings shown in the Drawings.
· Wooden doors and pair of doors shall be measured in
number for each structural opening, unless stated
otherwise in the Bills of Quantities.
· Blackboards shall be measured in number or in
squared meters as mentioned in the Bills of Quantities.

· Wall protection wooden rubbing rails shall be measured


in linear meter.
· Cloth hangers and hanger wooden base shall be
measured in number or in linear meter as stated in the
Bills of Quantities.
Rates for carpentry and joinery work shall include :
a) Shop and coordinated drawings.
b) Frames, architrave, chalk holders and other holders
and 20 cm. high “U” shape kick plates.
c) Allowance for plastering and tiling and the like.
d) Cutting and fitting around obstructions, Bedding and
painting.
e) Grounds, blocking and backings.
f) Plugging concrete, block work, and stone work, and
making well.
g) Ironmongery "Wally" or equivalent handles, cylinders,
cylindrical locks with master key for all the doors,
stainless steel stoppers, screws, temporary fixing, re-
fixing, oiling and adjusting. All to be silver color.

h) Providing three keys for each lock including tagging.

i) Providing and fixing wall mounted wooden keys


cabinet, (70*70*10) cm. varnish finished with all
ironmongery including cylindrical lock.
k) Steel legs, brackets, bearers and other supports
including painting.
l) Glass and glazing including cutting to size and putty
where indicated on drawings.
n) Preparing surfaces to receive finishes.
o) Painting, varnishing, polishing, oiling, and the like, to
any area or width in any location including work in
multicolor and cutting in edges and putty.

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
1.0 Finishing

1.4 Carpentry
1.4.1 Supply and Fix Wooden Doors 4.5 cm thick single or
double sashes. Brazilian made or equivalent With
(Frame) (4.5*3.5) cm hard wood edging. Wood parts
spray painted only, with 2 base coats, 2 finishing non-
glossy lacquer coats. Price includes temporary frame of
Swedish Wood "Sub Frame" to be installed prior to
block wall and plastering. Final spray painted door and
frame to be installed over the temporary frame after the
finish with the wall paint works. Frames of hardwood
(Swedish) width according to the wall thickness’ and
Allowance of 4 - 6 cm. thickness for plastering and tiling
purposes, immersed in wood preservative before
erection then embedded completely in sand - cement
mortar and completely anchored as per
specification.Architrave of Hardwood(Swedish) (7*1.2)
cm, price to include ironmongery, kick plates of
aluminum 10cm height for bath room doors, U shaped
both sides, gaskets.All as per Detailed Drawings),
specification and instructions of supervisor engineer.

1.4.1.a WD1 No. 11

1.4.1.b WD2 No. 7

WD3 (but with bathroom cylinder type(keyless) type


1.4.1.c No. 1
"Domicile" Model 002004/B213 stainless steel)
1.4.2 Supply and Fix Wooden Pergola, immersed in wood
preservative before erection then embedded completely
in sand - cement mortar and completely anchored as per No. 1
drawings and specification.
1.4.3 Supply and install kitchen cabinets, including granite
counter top. mr 3

Total For Section 1.4

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
1.0 Finishing

1.5 Metal Works


Preambles.
Metal works shall be measured in number.
Rates for metalwork shall include for :
Preparing shop drawings,
Drilling, counter sinking, screwing, bolting and riveting.

Lugs, plugs, holdfasts and the like.


Gaskets, sashes, double weather strips and external and
internal silicon filling around frames.
Ironmongery including cylinders, cylindrical locks (Union
or equal), stoppers, handles, temporarily fixing, re-fixing,
oiling and adjusting.
Providing three keys for each lock and padlock including
tagging and a master key for all doors.
Hardware including cramps, dowels and the like.
Glass and glazing to be 6mm thick with color as directed
by the engineer, including cutting to size, putty and
rubber.
Preparing surfaces for painting one coat of primer before
fixing.
Sealing and Painting to any area or width in any location
including work in multicolor and cutting in edges.

Price includes the supply and installation of painted


galvanized steel sheets size 25x25cm fixed on 16mm ply
wood to be installed next to each door. Price also
includes the supply and installation of the directory
plates size as shown in the attached form.
All other accessories and incidentals required to execute
the work. All aluminum works, windows and shutters and
all accompanying accessories to be Nabco or
equivalent, locally produced materials.

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
1.0 Finishing

1.5 Metal Works


Supply, fix and operate sliding Aluminum
Windows.Extrusion Section 7700 Nabco or equal three
channel, with protective electrostaticaly applied polyester
powder paint of 70-80 microns. In color approved by the
1.5.1 Engineer.Price to include, 6 mm .double tinted Float
colored glazing , fly screen and all other accessories and
fittings to complete works as per drawings and
specifications.

1.5.1.a Window Type AW-1 No. 20

1.5.1.b Window Type AW-2 No. 2

1.5.1.c Window Type AW-3 No. 1

1.5.1.d Window Type AW-4 No. 1


1.5.2 Supply and install Nabco aluminum curtain walls. Price
includes double pane glass with 6mm thick tempered
outer pane and 6mm tempered inner pane, fittings,
hinges, locks, sand blasting patterns, bolts, and all
connections as manufactured by Dorma or equivalent,
fittings colors same as aluminum color. Price also
includes window openings including fly screen panes.
Price also includes the vertical and horizontal panels for
the sky lights. Contractor to supply all shops drawings
prior to execution of work. Price includes all necessary
steel structure, including galvanizing and painting of all
elements, all supports, brackets, etc… Price also
includes aluminum sheet cladding of all exposed
concrete and steel elements as shown on drawings.

CU m2 13
1.5.3 Stairs Handrails of 60x40x4mm hollow steel profile and
14x14mm square section. Price to include Fixing
complete, oil paint three coats in addition to primer coat. mr 19
(Seen Height 75 cm.) as in drawing)
Ditto, as (a) above but single pipe attached to walls as in
1.5.4 drawings. mr 16

1.5.5 Supply and Fix Steel Doors (ready made M-T lock with
master key type "SuperNimer" or equivalent SN2000) as
per drawings, specification and instructions of supervisor
engineer. Price to include fixing complete, ironmongery,
cylinders, cylindrical locks handles (Approved by
Palestine Standards Institution). 6 mm. glazing, gaskets,
oil Paint in three coats in addition to two primer coats. as
in drawing)
1.5.5.a Steel Door Type MD1. No. 1

1.5.5.b Steel Door Type MD2. No. 1


Supply and install mirrors50x50cm with aluminum frame.
1.5.6 No. 12

Total For Section 1.5

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
1.0 Finishing

1.6 False Ceiling Works


Preambles.
Gypsum Board Partitions, ceilings, and acoustic tiles
ceilings and the like shall be measured net in meter
square.
The Contractor rates shall include for supply of all
materials, workmanship, samples, primers, surface
preparation, protection of surfaces, application to all
heights as required of works, repair of all damaged
surface at the contractor’s expenses, and all other
requirements as stated in the Specifications.
1.6.1 Supply and install metal false ceiling, using L & Z section
frames and heavy duty USG or equivalent T sections
and USG or equivalent hangers. Panels shall be as
specified in the specifications.
m2 58
1.6.2 Supply and install tegular edge acoustic tiles, using L &
Z section frames and heavy duty USG or equivalent T
sections and USG or equivalent hangers. Tiles shall be
non-combustible type as specified in the specifications.
m2 103
1.6.3 Supply and install gypsum board steps. m2 106

Total For Section 1.6

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
1.0 Finishing

1.7 Painting Works


Preambles
Painting and decorating to walls, ceilings and the like
shall be measured net in meter square.
Painting to other works shall be included in the related
items. Color as specified by engineer.
Paints shall be supplied to site in sealed container, as
approved by the Engineer, and site mixing shall not be
permitted.
The Contractor rates shall include for supply of all
materials, workmanship, samples, primers, surface
preparation, protection of painted surfaces, application to
all heights as required of works, repair of all damaged
surface at the contractor’s expenses, and all other
requirements as stated in the Specifications.
All paint types should be approved and having a
supervision certificate from the PSI.
1.7.1 Supply and paint high quality emulsion paint, for walls as
per indicated in finishing tables, on one priming coat and
two finishing coats, using three coats of complete putty,
as per satisfaction of the supervisor engineer.
engineer
m2 570
1.7.2 Ditto, but semi gloss oil paint. m2 500
1.7.3 Supply and paint three coats Aracid paint for ceilings of
high quality (Approved by Palestine Standards
Institution). m2 480
1.7.4 Supply and paint gypsum board steps. m2 106

Total For Section 1.7

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
1.0 Finishing

1.8 Proofing Works


Preambles
All finishes shall be measured superficially net unless
other wise stated clearly.
All finishes, include triangular shaped fillets except
cement and sand lining to gutters, shall be measured on
the slab surface only, parapets and column stubs to be
included in the price and not to be measured.
Cement and sand lining to gutters shall be measured in
linear meter, unless other wise stated clearly.
Rates for cement and sand work shall include for :
Hacking concrete, applying cement slurry or raking out
joints of block work to form key. Application to any
surface.
Finish to surface, to falls, cross-falls and currents.
Forming bays including joints. Finish to edges and arises.

Making good around steel sections, pipes, tubes, bars,


brackets, outlets, and the like.
Measurement for concrete screed and waterproofing
membrane shall be for horizontal projection of roof area
as calculated on roof plan between plastered surfaces of
parapets and walls only. Corner chamfers and vertical
waterproofing shall not be measured. Expansion joint
waterproofing shall not be measured, and is included in
expansion joint unit prices.
Rates for waterproofing and roof sheeting shall include
for
Preparation of surface, cutting in edges. Overlaps
priming and treatment at the corners and floor drains.
Dressing over parapets and stub columns including
forming groove to receive edge of plasticized bitumen
membrane and sealing with elastic sealer.
Side and end laps, Fittings including bolts, hook bolts,
screws and washers,
Sheets of any width or length.
Supply and apply acrylic waterproofing compound Sica
1.8.1 Litic Plastic or equivalent, two coats as per the
manufacturers instructions, to cover roof slab. m2 340
Supply and apply hot asphalt (75/25) for sanitary units in
special rooms flooring above ground floor only. applied
1.8.2 in two layers stiffened with fiber glass sheet to the full
area of floor and up to 1.5 cm high of walls m2 60
Lean mix concrete to encase projected columns of roof,
price to include plastering single layer torch applied
1.8.3 polyester membrane, turn up and asphlat-base
aluminum coating. m3 3

Total For Section 1.8

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
2.0 Mechanical Works
All mechanical works items mentioned in here and
after for all project facilities and Units shall include
installation, adjustment, testing commissioning, and
all required materials, equipment and workmanship
to execute the items of construction in accordance
with the specifications, drawings, and supervising
engineers instructions, complete in place and ready
for handing over.

Measurements for items with (L.m.) or (M2) Units will


be based on net liner distance or net area of the
products.
2.1 Water Piping :
2.1.1 Galvanized Steel Pipes:
Supply and install galvanized steel pipes sch. 40. with
all necessary fittings like elbow, t, vent.....etc., Of
approved quality.
Note : measurements are based on true length of
center line of pipe
2.1.1.a 3/4" nominal pipe size mr 25

2.1.1.b 1"nominal pipe size mr 50


2.1.2 Cold & Hot Water Collectors
supply and install the following copper collectors
equipped with shutoff valves on main and branches, air
vents and all fittings and accessories required for
complete installation.

2.1.2.a 3/4" diameter. (3 outlets) No. 2

2.1.2.b 3/4" diameter. (4 outlets) No. 2

2.1.2.c 3/4" diameter. (6 outlets) No. 3

2.1.2.d 3/4" diameter. (8 outlets) No. 1

2.1.3 Isolating Vlaves (Ball Valves)


Supply and install ball valves (Italian made), 10 bars, for
water system, of the following diameters, (this item does
not cover vales mentioned elsewhere as part of other
items such as valves included in the item of pumps.

1" diameter No. 2

Total For Section 2.0 page -1-

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
2.0 Mechanical Works
2.2 Electric Water Heater:
Supply and install of electic water heater internally
enamled which includes 2000 watt heating element,
thermostate, safety and drain valve, isolating valves,
steel base, and all required connections

60 LITER No. 2
2.3 Gas Cylinder:
Supply and install a set of two gas cylinders inside gas
cabinet. Use (48kg) each cylinder. Price to include
automatic regulators, pressure gauge, isolating valves,
3/8" gas copper pipes to be connected to the kitchen,
testing and cimmissioning ad nall related works steel
cover as per drawings and specifications.
L.S. 1
2.4 SanitaryFixtures & Pipes :
Internal sanitary sewers network shall be included in the
rates of sanitary fixtures and appliances to nearest riser
or manhole.The price includes the UPVC connection
pipes between sanitary fixtures & the main pipes & the
pex pipes connection between sanitary fixtures & cold &
hot water collectors.
2.4.1 Wash Basin:
Supply and install of white vitreous china wash basin
on counter. Complete with chrome single lever mixer.
2.4.1.a And all accessories for complete installation, i.e. chrome
plated 13 mm stop ). No. 11
2.4.1.b Ditto, but without counter No. 1

2.4.2 European Toilet


Supply and Install White Vitreous China European type
Toilet with concealed flush tank. No. 7

2.4.3 Hose Bib


Supply and Install of Chromium plated hose bib hand
spray for WC’s. No. 7

Total For Section 2.0 page -2-

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
2.0 Mechanical Works
2.4.4 Urinal
Supply and install of white vitreous china urine suit.
Complete with all accessories for complete installation
including chrome platef 13 mm stop valve and flush
valve Of approved quality. No. 3
2.4.5 Kitchen Sink
supply and Install Stainless steel single Bowl Kitchen
Sink with tray of dimensions 60/40 cm, the price is also
to include kitchen type mixer with all accessories.
No. 1
2.4.6 Floor Trap
Supply and install of 4" Floor traps . Price includes extra
heavy cast brass ferrule with countersunk head screw
and/or cast brass cover. Price includes also all drainage
piping up to main pipe or manhole. No. 7
2.4.7 Clean Out

Ditto but 4" Clean out. No. 6

25
2.5 Concrete Manholes:
Supply and Install of Precast Concrete Manholes In
compliance with specifications and Drawings.Price to
include excavation, B200 reinforced concrete for base,
back filling, cement plaster, benching, Medium duty Cast
Iron cover of weight as specified, drop if needed, and all
necessary works to comply with drawings and
specifications.
2.5.1 Diameter 60 cm and depth up to 100 cm No. 4

2.5.2 Diameter 80 cm and depth up to 150 cm No. 1

2.6 UPVC Pipes


Supply and install of Drainage and storm UPVC red for
risers use with all required fittings, hanging and testing.

2.6.1 Diameter 100 mm(4") mr 80

2.6.2 Diameter 150mm(6") mr 60

2.7 Rain Drain:


Supply, installation and commissioning of UPVC
rainwater roof drain 20cm x 20cm(quality approved). No. 4

2.8 Rain Water pipes:


UPVC rain water pipes down to a free discharge above
ground level, with all required digging, plastering,fittings
and vent caps, all as shown in drawings, specifications,
and approval of supervisor engineer.

Diameter 100 mm(4") mr 40

Total For Section 2.0 page -3-

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
2.0 Mechanical Works
2.9 Air Conditioning :

2.9.1 Air Ducts


Galvanized air ducts in various thickness as required in
(ASHREA) and as described and detailed, including
hanging, digging, sleeves, split and volume dampers and
all fittings. m2 200
2.9.2 Duct Insulation

2.9.2.a Internal acoustic duct insulation m2 25

2.9.2.b External duct insulation m2 150


2.9.3 Extract Fan
Supply, install and test of inline centrifugal extracting fan
of capacity 2700cfm ,0.3"head , Complete with all
2.9.3.a
required fittings , on/off switch and all electrical
connections. No. 1
Ditto,but inline extract fan of capacity 2050cfm,0.3"head
2.9.3.b No. 1

2.9.3.c ,
Ditto,but p y 100cfm
axial extract fan of capacity No. 7

2.9.4 Ceiling Supply Diffuser


Supply and install and balancing of white coated
aluminum ceiling mounted air diffuser , with volume
damper. Price includes connection to ducts with adapter
if required and sealant using.

2.9.4.a size9"/9" No. 1

2.9.4.b Ditto, but wall Supply Diffuser

size 75cm/20cm . No. 30

2.9.4.c size 70cm/20cm . No. 3

2.9.4.d Size 50cm/20cm No. 2

Ditto, but wall fresh air grills

2.9.4.e size 100cm/20cm . No. 5

2.9.4.f size 30cm/20cm . No. 1

2.9.5 Ceiling Return Grill


Supply and install of the following ceiling mounted
return air grill with filter, without damper .

2.9.5.a size24"/24" No. 12

2.9.5.b Ditto, but wall return grill

size 180cm/25cm . No. 3

2.9.5.c size 85cm/25cm . No. 3

Total For Section 2.0 page -4-

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
2.0 Mechanical Works
2.9.6 Ceiling Exhaust Grill
Supply and install of the following ceiling mounted
exhaust air grill , with register . Price includes flow rate
calibration.
2.9.6.a size 18"*18" No. 1

2.9.6.b Ditto, but wall exhaust grill

size 80cm/25cm . No. 4

2.9.6.c size 30cm/20cm . No. 1

2.9.7 Mini Central Unit


Supply and install of Split heat pump unit as specified
composed of condensing unit on wall with scroll
compressors and ducted type indoor unit . with flat filter,
control and power panel ,digital thermostat ,electrical
connection from main panel to unit,connections to the
nearest drain points, metal base to outdoor unit, gas 410
and power connections between condenser and indoor
unit, the p
price includes the drain system
y to be connected
to the existing one with all required fittings and
accessories as required by manufacturer .

0 0
Of capacity of 8.21 KW at 40C outdoor temp. and 23C
2.9.7.a indoor temp. No. 1

2.9.7.b Ditto but 15.83 KW No. 11

2.10 Fire fighting


2.10.1 Fire Extinguisher
Supply and install of 5 kg CO2 Fire extinguisher. Price
includes fixing in Location as decided by the Engineer
and as shown in drawings. No. 2
2.10.2 Fire Cabinet
Fire fighting cabinet including fire hose drum 50 cm. Dia.
on rotating hinges, incl. 25 m. of 3 / 4” high pressure
rubber hose, 1” dia quick opening ball valve, 25 m length
and multi purpose brass nozzle, , 6 kg. Powder
extinguisher including 0.80 x 0.80 x 0.30 m painted
metal sheet cabinet with door on hinges, isolating valve.
No. 2
2.10.3 Fire pipes
Galvanized seamless steel pipe ( SCH40 ) work to
ASTM A53 grade (A) schedule (40).

2.10.3.a 2" nominal pipe size mr 20


2.10.3.b
1 1/4" nominal pipe size mr 5

Total For Section 2.0 page -5-

Total For Section 2.0 page 1-5

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
3.0 Electrical Works
Preambles
- Rates for electrical installation shall include for :
a - Furnishing and installation including all required
materials .
b - Painting all exposed metal surfaces with one coat of
rust inhibitive primer and two coats if chlorinated rubber
paint .
c - Electrical works including all required materials,
accessories, labor and all required according to BOQ
and specifications.
d - Cutting and pinning including all making good
e - Forming or cutting holes, chases, channels etc. in
reinforced concrete structures and block works.
f - Plugging and screwing .
g - Jointing, saddles, clamps, brackets, hangers and
providing steel pipe sleeves with plates.
h - Bending, cutting threading, trunking fittings, tees ,
elbows , bends , cover-plates, bushes, locknuts,
stopping plugs, reducing bushes .
i - Forming holes for conduit entries in special boxes,
trunking, pin racks for supporting
g, p pp g cables,, chases

j - Draw wires, draw cables and the like .


k - Sinking ends of cables to expose to conductors and
capping ends of cables.
l - Cleaning conduits, ducts, trunking and the like.
m - Necessary trench or pit excavation, backfilling and
disposal of surplus excavated materials.
n - Preparation of all required workshop drawing and as
built drawings as specified.
o - Testing electrical installations as specified
including providing equipment and personnel necessary
for testing .
p - Protection of all electrical works .

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
3.0 Electrical Works
3.1 WIRING
Supply, install, connect and commission power points
as indicated to equipments including conduits, cables,
wires and disconnecting switches, terminated to relevant
panel board

3.1.1 Computer & TEL. patch panels cabinets. No. 1

3.1.2 Fire Alarm Panel. No. 1

3.1.3 Public address panel No. 1

3.1.4 Single phase centrifugal fan 2


Ex. Fan (including cable&isolating switch in WP
3.1.5 inclosure) No. 7

Three phase Split unit (Including 5*4mm2 cables &


3.1.6 3*20A isolating switch in WP inclosure) No. 12

Supply, install, test and commission as shown on


drawings and as per specifications. Automatic hand
3.1.7 dryer, 2000W including conduit, cables, junction box No. 3
and all necessaryy accessories

3.2 GROUNDING AND BONDING


Supply, install, test and commission complete earthing
system including earthing pits, copper rods, copper
conductor from earthing pit to main earthing bus as
specified and according to drawings
3.2.1 3 earth CU rods 3m length 19mm diameter including all
necessary accessories, clamps, manholes, and covers
etc. and connected to main earthing bus via uninsulated L.S. 1
CU cable as per drawings and engineers instructions.

3.2.2 10mm2 insulated earth cable for data rack earth L.S. 1
3.2.3 2*35mm2 insulated earth cable for ring earth including
CU bus bar 30*3*0.4mm in each floor with insulated CU L.S. 1
conductor 16mm2 routed to each floor panel
3.3 600 VOLT CABLE
Supply, install, test and commission as shown on
drawings and as per specifications 600 volt cables with
all required accessories that are required for proper
installation and operation, conduits, cable lugs, ties, …etc

3.3.1 5X10 mm² CU N2XY mr 9

3.3.2 5X16 mm² CU N2XY mr 78

3.3.3 3X95+50+50 mm² CU N2XY mr 91

Total For Section 3.0 Page -1-

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
3.0 Electrical Works
3.4 Power Sockets
Supply, install and commission power sockets as shown
on drawings and as per pecifications, including
conduits, wiring, cables, pull boxes sockets and
accessories as shown on drawings terminated to
relevant panel board.

3.4.1 Single phase wall mounted 16A, 3PIN socket. No. 13


Single phase wall mounted 16A, 3PIN socket water
3.4.2 proof . No. 4

3.4.3 Single phase wall mounted 16A, 3PIN, duplex. No. 13

3.5 LIGHTING FIXTURES


Supply, install, connect, test and commission the
following lighting fixtures, including painted sheet steel,
lamp, RF capacitor, reflector and diffuser as specified
and shown on the drawings.

3.5.1 Fixture Type A No. 45

3.5.2 Fixture Type


yp B No. 5

3.5.3 Fixture Type C No. 24

3.5.4 Fixture Type D No. 10

3.5.5 Fixture Type E No. 4

3.5.6 Fixture Type F No. 2

3.5.7 Fixture Type G No. 2

3.6 LIGHTING POINT


Supply, install and connect Lighting point including
conduits and wires, switches, push buttons terminated to
relevant panel board as shown on drawings and
according to specifications. No. 92
3.7 PANEL BOARDS
Supply, install, test and commission as shown on
drawings, complete panel board with main and branch
circuit breakers and all necessary accessories to
complete the work.

3.7.1 MDB L.S. 1

3.7.2 DB-F L.S. 1

3.7.3 DB-AC L.S. 1

Total For Section 3.0 Page -2-

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
3.0 Electrical Works
3.8 FIRE ALARM & DETECTION SYSTEM
Addressable
Supply, install, connect, test and commission complete
Analouge addressable fire alarm system as specified
and as shown on drawings including conduits and fire
resistant cables with all accessories required such as
fixing bolts …
Fire alarm main control unit 1Loops expandable , with
3.8.1 standby rechargeable batteries (8 hours duration), No. 1
protected by unswitched fused spur outlet

3.8.2 Photo-optical addressable smoke sensor No. 5

3.8.3 Addressable heat sensor No. 2

3.8.4 Manual addressable pull station break glass No. 2

3.8.5 Sounder 6" No. 2

3.8.6 Auto dialer No. 1

387
3.8.7 Horn strobe IP54 No
No. 1

3.8.8 Control module including box No. 1

3.9 COMPUTER SYSTEM :


Supply, install, commission as per specifications and as
shown on drawings, CAT6A cables, conduits & 3M
sockets.

3.9.1 Data socket RJ45 3M/CAT6A No. 14

3.9.2 24 Port patch panel 3M No. 1

3.9.3 Air patch panel No. 2

3.9.4 20U cabinet 70cm depth, 19" rack No. 1

3.9.5 Power strip including 16A MCB, with indicator lamp No. 1

3.9.6 24 Port switch PoE as per cisco 2960 or equal No. 1

3.9.6 Cat6a 1.25" from pillar to data rack cabinet mr 180

Total For Section 3.0 Page -3-

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS‐JMOC‐PTF‐ITB‐2010‐020

Project: Police Training Facility - PTF


F19 Classrooms Building - Finishing Package
Contract No:CON/JMOC/PTF/2010/XXX

Unit NIS Original BOQ


Item Description
Qty Amount
3.0 Electrical Works
3.10 VOIP :
As per JACQUES Electronics or approved equal, supply,
install test and commission the above- mentioned
system that indicates all listed devices including
3*1.5mm2 audio cables, fire rated conduits, pull boxes
and all accessories needed to complete the job as per
specifications attached and engineer's approval.

Note:VOIP system included in data rack.

3.10.1 Access intercom slave station as per VSL- 351 No. 1

3.10,2 VOIP pa Controller as per PAC-3E 1 series No. 1

3.11 PA Amplifiers
As per Bosch or approved equal
Supply, install, connect, test and commision a complete
public address as specified and as shown on the
drawings with all necessary conduits, 3*1.5mm2 audio
cables and standby batteries ( for fix hours)

3.11.1 Rack mount 60 watt mixing amplifier complete No. 1

3.11.2 6w surface speakers including fire dome boxes No. 3

Total For Section 3.0 Page -4-

Total For Section 3.0 Page 1-4

UNOPS, Jerusalem Operations Centre (JMOC), 8 Nour Ad‐Din Street, East Jerusalem, oPT,| Tel: +972 2 626 1881 | Fax: +972 2 262 7586 |
Operational excellence for results that matter UNOPS-JMOC-PTF-ITB-2010-020

Summary Sheet for BoQ Schedule

Project: Police Training Facility (PTF), Jericho Contractor:

Work Area: F19 - Finishing Works Contract Value:

Contract No: CON/JMOC/PTF/2010/XXX

CONTRACT SUMMARY- BSP-(B)

Item Description Amount Value Cpltd % Cptd

1.0 Finishing Works

1.1 Hollow Concrete Block Works

1.2 Plastering Works

1.3 Tiling Works

1.4 Carpentry Works

1.5 Metal Works

1.6 False Ceiling Works

1.7 Painting Works

1.8 Proofing Works

2.0 Mechanical Works

3.0 Electrical Works

FORECAST CONTRACT VALUE % Change = #DIV/0!