Professional Documents
Culture Documents
QUERY NO. :
NACAP-THIESS JV CONSORTIUM
DATE :
ASIA PACIFIC SDN BHD
TECHNICAL QUERY
GAS TRANSMISSION AND DISTRIBUTION PROJECT
FOR BRANCH LINE ONSHORE (SAKERNAN – KUALA TUNGKAL)
QUESTIONAIRE:
1. The following PSV will be sized (load calculation) based on what case (fire, block discharge or others), please
clarify!
No.
2. TAQ No. Case
PS
V
210
21
loa
d
cap
acit
y is
sa
me
with
PS
V
210
22
loa
d
cap
acit
y.
Ple
ase
Cla
rify!
P&I
D
No.
3.
PS
V
210
12
loa
d
cap
acit
y is
sa
me
with
PS
V
210
11
loa
d
cap
acit
y.
Ple
ase
Cla
rify!
4.
PS
V
220
21
loa
d
cap
acit
y is
sa
me
with
PS
V
220
22
loa
d
cap
acit
y.
Ple
ase
Cla
rify!
5.
PS
V
220
13
&
220
14
loa
d
cap
acit
y is
sa
me
with
PS
V
220
11
&
220
12
loa
d
cap
acit
y.
Ple
ase
Cla
rify!
ANSWER:
PREPARED BY : APPROVED BY :