Engineered timber panel
Architrave
DETAIL - A3
B B
ML-02-80519
220
EQ
2100
600
600
600mm Long 600mm Long
600mm Long Pull handle Pull handle
Pull handle
(Back to back fixing)
EQ
OUT IN
D D
DETAIL - A5
225
BLOCK 5C
ZONE 9B
ZONE 3C ZONE 3D ZONE 7C ZONE 7D
ZONE 1A
A
-
KEY PLAN
IN
1500
Finish Masonary opening width1500
02. Size 690(w) x 2032(h) Client DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA
03. Stile 32(t) x 50(w)mm hardwood with min density 650kg/m³ MINISTRY OF DEFENCE
04. Top, Bottom& Intermediate Rail 32(t) x 50(w)mm hardwood with min density 650kg/m³ Project
DEFENCE HEADQUARTERS COMPLEX - AKUREGODA
06. Lock Block 22(t) x 50(w)mm hardwood with min density 650kg/m³
Project Management & Procurement
OUT 07. Door Core 22 mm Particle board with min density 600kg/m³ PROJECT MANAGEMENT UNIT OF THE ARMED FORCES
08. face 3.6(t) mm MR plywood Architectural Consultant (with effect from 01-10-2016)
A
- 09. Lipping 10(t) x 40(w)mm Teak lipping CENTRAL ENGINEERING CONSULTANCY BUREAU
G 10. Finish 0.5mm Timber veneer with AC coating G
Engineering , Quantity Surveying & Construction Management
11. Glass Beading N/A
CENTRAL ENGINEERING CONSULTANCY BUREAU
415, Bauddhaloka Mawatha, Colombo 07.
TEL : 0112668800 FAX: 0112687369
Construction by
CONSTRUCTION MANAGEMENT UNIT OF THE ARMED FORCES
Drawing Title
DETAIL - A7 MAIN BUILDING
BLOCK 02
ML-02-80521 DOOR TYPE - A1f1(HARDWARE SET NO- 01)
TYPICAL DETAILED PLAN, ELEVATIONS & SECTION
Recommended
1 PLAN Designed
Drawn
YGAD ...............................................
CONSULTANT ARCHITECT / SENIOR ARCHITECT
H ANJ / KKD Approved H
- Scale 1:25 ........................................
Checked TOT DGM (Architectural)
Submitted Scale Date Status
TGRS 1:25 23.12.2020
CAD File P:\02_Bldgs\01_MB\MB_AR\ARPrint\TI\DETAILS\TIMBER DOORS\Block 2 TEN
Sheet Size Drawing No. Rev. No.
This drawing is sole property of CECB. Data contained on this drawing shall not to be used, reproduced, duplicated in whole or part without the A3 DHQC-CECB-MB-TI-AR-DW-ML-02-80505 -
prior permission of CECB. CECB shall not be held responsible for the unauthorized use of this drawing on Projects other than for which it was used.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 23 December 2020