TANGUB CITY, MISAMIS OCCIDENTAL – MUNICIPALITY OF TUBOD, LANAO DEL NORTE
STA. 0+000 ~ STA. 3+169
3,169m
PANGUIL BAY BRIDGE (bridge ID to confirm with UPMO)
APPROVED:
SUBMITTED: RECOMMENDED :
KEON YONG KIM SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
PROJECT MANAGER NKG JV PROJECT DIRECTOR OFFICER-IN-CHARGE ASSISTANT SECRETARY UNDERSECRETARY
ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN FOR TECHNICAL SERVICES FOR TECHNICAL SERVICES
(MULTILATERAL) UPMO
DATE : December 16 2020 DATE : DATE : DATE : DATE :
DRAWING INDEX
TABLE OF CONTENTS
DRAWING
ITEMS NO. TITLE REMARKS
NO.
42
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-000
KEON YONG KIM OF TUBOD, LANAO DEL NORTE DRAWING INDEX MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
1. GENERAL NOTES
LOCATION MAP
Ap
pr (36
oa 0m
ch )
Ro
0+
ad
00
0
1
T A N G U B
0+0
00
00
0+3
0+10
00
0+2
0
C I T Y
0+
50
0
1+
Pa
00
ng (2,2
0
uil 40
Ba m)
yB
rid
1+
T U B O D
g
50
e
L
0
I
U
G Y
2+
00
N A
0
A B
P
Ap
pr (56
2+
oa 9m
50
ch )
0
Ro
0+200
ad
0+10
0+3
00
2
0
0+00
3+0
00
ILIGAN CITY
OZAMIZ CITY
MUKAS TOWN
PANGUIL BAY
BRIDGE
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-001
KEON YONG KIM OF TUBOD, LANAO DEL NORTE LOCATION MAP MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
GENERAL NOTES (1/3)
Engineering Design, "As-Staked", Revised, and "As-Built" Plans for Highway, CON’C CONCRETE LVC LENGTH OF VERTICAL CURVE ST’L STEEL
Bridge and Water Projects CONST.JT. CONSTRUCTION JOINT MAX. MAXIMUM TBM TEMPORARY BENCH MARK
• D.O. NO.32, Series of 2011, Re : BOD Checklist of Requirements CONT.JT. CONTRACTION JOINT MIN. MINIMUM THK. THICKNESS
• D.O. NO.50, Series of 2002, Re : Approval of Design Plans DEP. DEPTH MSL MEAN SEA LEVEL TYP. TYPICAL
• Land Acquisition and Resettlement • D.O. Series of 2003, Guidelines in the LAPRAP for Infrastructure Project superseded by DO 65, 2017 D, DIA. DIAMETER NTS NOT TO SCALE VAR. VARIES/VARIABLE
Action Plan • D.O. NO.5, Series of 2003 DIST. DISTANCE NO. NUMBERS VERT. VERTICAL
• Creation of the Infrastructure Right of Way and Resettlement Project Management Office (PMO) EL. ELEVATION P PIER W WIDTH
EQ. EQUAL WT. WEIGHT
1.3 ALL WORKS SHALL BE CONSTRUCTED ACCORDING TO THE DETAILED ENGINEERING DESIGN (DED) TO BE APPROVED BY THE DPWH'S
CONSULTANTS, WHICH INCLUDES CONFORMANCE TO THE PROVISIONS PERTAINING TO HIGHWAY AND BRIDGES UNDER THE DPWH 8.0 SYMBOLS
STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS, VOLUME , 2013 EDITION (BLUE BOOK) A A'
SECTION ARROW D DIAMETER OF MILD STEEL BAR ( 300MPa )
EL.
2.0 DIMENSIONS AND UNITS INDICATION OF ELEVATION H DIAMETER OF HIGH TENSILE BAR ( 400MPa )
2.1 DISTANCES BETWEEN HORIZONTAL CONTROL POINTS INCLUDING REFERENCE POINTS ARE MEASURED AND EXPRESSED IN METERS.
@ SPACING CENTER TO CENTER SECTION IN WATER
2.2 ELEVATIONS SHOWN ON THE DRAWINGS ARE EXPRESSED IN METERS, AND ARE BASED ON MEAN SEA LEVEL ELEVATIONS ±0.0.
2.3 UNLESS OTHERWISE SPECIFIED, DIMENSIONS OF PIPES, BOX CULVERTS, BRIDGES AND OTHER STRUCTURES ARE MEASURED AND φ DIAMETER OF PLAIN BARS, CIRCULAR OPENINGS CONCRETE
EXPRESSED IN MILLIMETERS.
C
L CENTER LINE EXISTING GROUND
2.4 STATIONS ARE GIVEN IN KILOMETERS AND METERS WITH OR WITHOUT DECIMALS e.g. 5+100.
2.5 UNLESS OTHERWISE SPECIFIED, ALL MEASUREMENTS ARE EXPRESSED IN THE S.I. UNIT SYSTEM.
3.0 STATIONING
3.1 THE ROAD STATIONINGS AND ELEMENTS OF HORIZONTAL AND VERTICAL CURVES SHOWN ON THE PLANS ARE RECKONED FROM THE
B. STRUCTURES
ROADWAY CENTERLINE. 1.0 GENERAL
3.2 STATIONINGS OF THE BRIDGES, RCPC AND OTHER STRUCTURES ARE RECKONED FROM THE STATIONING OF THE ROADWAY CENTERLINE 1.1 INDICATED DIMENSIONS SHALL GOVERN OVER SCALED DIMENSIONS.
SHOWN ON THE PLAN. SCALED DIMENSIONS SHALL NOT BE USED FOR CONSTRUCTION PURPOSES.
1.2 UNLESS OTHERWISE SHOWN ON THE PLANS, ALL EXPOSED CONCRETE EDGES SHALL BE CHAMFERED 20 X 20mm EXCEPT RAILING.
4.0 CONTROL POINTS
4.1 HORIZONTAL CONTROL 2.0 LOADS AND WEIGHTS
• COORDINATES ARE BASED FROM NAMRIA CONTROL POINT “MSW-3016” 2.1 DESIGN VEHICULAR LIVE LOAD
WGS-84 • VEHICULAR LIVE LOADING ON THE ROADWAYS OF BRIDGES OR INCIDENTAL STRUCTURES, DESIGNATED HL-93, AND SHALL CONSIST
LAT. : 8°4’25.21468“N OF COMBINATION OF THE ;
LONG. : 123°44’3.8972“E DESIGN TRUCK OR DESIGN TANDEM, AND DESIGN LANE LOAD. EXCEPT AS MODIFIED, EACH DESIGN LANE UNDER CONSIDERATION
4.2 VERTICAL CONTROL : SHALL BE OCCUPIED BY EITHER THE DESIGN TRUCK OR TANDEM, COINCIDENT WITH THE LANE LOAD, WHERE APPLICABLE, THE
• ELEVATION IS BASED FROM “MSW-3016”, ELEV=27.394 Msl. LOADS SHALL BE ASSUMED TO OCCUPY 3m TRANSVERSELY WITHIN A DESIGN LANE.
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-002
KEON YONG KIM OF TUBOD, LANAO DEL NORTE GENERAL NOTES (1/3) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
GENERAL NOTES (2/3)
• STRUCTURAL STEEL SHAPES ································· AASHTO M 270 GRADE 50 (ASTM A 709 GRADE 50)
ELASTIC SEISMIC
1.0
• STEEL SHEET PIPE ················································ AASHTO M 270 GRADE 36 (ASTM A 709 GRADE 36)
0.8
• BRIDGE BEARING ·················································· AASHTO M 270 GRADE 50W (ASTM A 709 GRADE 50W)
0.6
• DECK DRAIN ·························································· AASHTO M 105 (ASTM A 48)
0.4 3.5 ANCHOR BOLTS / HIGH STRENGTH BOLTS /WELD CLASS NO. 30 (GRAY IRON CASTING)
0.2 • ANCHOR BOLT ······················································· ASTM F 1554 GRADE 55 (GALVANIZED)
0 • HIGH STRENGTH BOLT ··········································· AASHTO M 164 OR AASHTO M 253 (ASTM A 325 OR ASTM A 490)
0 2 4 6 8 10 12 (FOR MEMBER CONNECTION) FRICTION TYPE WITH WASHERS
PERIOD, T(sec) • WELDING ELECTRODES ········································· AWS E 70 XX
3.6 BEARING
2.2 WEIGHTS • THE SEISMIC ISOLATION BEARING SHALL BE SELECTED CONSIDERING SEVERAL FACTORS SUCH AS CONSTRUCTABILITY, ECONOMICS
CONCRETE(40MPa) ································· 24.52 kN/m³ COMPACTED SAND, EARTH ···························· 18.90 kN/m³ ADAPTABILITY AND STRUCTURAL SAFETY. IN CASE OF APPLYING OTHER DESIGN PRODUCT (INCLUDING SIMILAR PRODUCT), MANUFACTURER
STEEL OR CAST STEEL ·································· 77.00 kN/m³ WEARING COURSE ········································ 22.10 kN/m³ MUST GET PRIOR APPROVAL FROM DPWH CONSULTANT BY SUBMITTING TEST REPORTS (PRE-PERFORMANCE TEST,
PROTOTYPE TEST, PRODUCT PERFORMANCE TEST) REGARDING SEISMIC ISOLATION BEARING ISSUED BY INTERNATIONALLY AUTHORIZED
TESTING INSTITUTES (SUCH AS UCSD, HITEC, ETC.)
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-003
KEON YONG KIM OF TUBOD, LANAO DEL NORTE GENERAL NOTES (2/3) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
GENERAL NOTES (3/3)
d
10mm ~ 25mm - GENERAL 6d
4.0 CONSTRUCTION 10mm ~ 16mm - STIRRUPS, TIES 4d
φ 20mm MIN
DIAMETER =
4.1 BORED PILES MIN = 12d φ 36mm MAX 19mm ~ 25mm - STIRRUPS, TIES 6d
MAX = 15d
4.1.1 REINFORCEMENT 29mm ~ 36mm 8d
• LAP WELDING OF REINFORCEMENT IS NOT PERMITTED. • HOOK AND BANDS
• DURING THE INSTALLATION OF REINFORCEMENT CAGES, THE CONTRACTOR SHALL PROVIDE ADDITIONAL LINKS TO ENSURE THE CAGES
TO BE STIFF ENOUGH TO MAINTAIN THE DESIGN POSITION. d d
76mm MIN
d d D
6d OR
D D
12d
4.1.2 PILE TESTS D 90 HOOK
90 HOOK 180 HOOK 135 HOOK (Standard hook for bars)
IN
m OR
• BI-DIRECTIONAL PILE LOAD TEST : INSTALL OSTERBERG CELLS AT THE BOTTOM OR IN THE MIDDLE OF PILES, INFLATE THE CELLS UP
M
76 6d
4d OR 63mm MIN
m
AND DOWN USING THE SKIN FRICTION FORCE AND END BEARING CAPACITY OF THE GROUND AROUND PILES AS A REACTION FORCE, PIN DIAMETER = D = 6d FOR Φ10mm THRU Φ25mm PIN DIAMETER = D = 6d FOR Φ10mm THRU Φ25mm
8d FOR Φ29mm THRU Φ36mm 8d FOR Φ29mm THRU Φ36mm
AND MEASURE THE PRESSURE AND DISPLACEMENT. THIS TEST IS USED TO MEASURE THE BEARING CAPACITY OF PILES. AND THIS
TEST IS USEFUL WHEN A LARGE DEAD LOAD IS REQUIRED AS A REACTION FORCE OR WHEN IT IS DIFFICULT TO APPLY A REACTION
FORCE DEVICE UNDER A CERTAIN CONDITION, AND IT IS A LOADING TEST METHOD SUITABLE FOR THE BORED PILES OF
A LARGE-DIAMETER. THE METHODOLOGY AND EQUIPMENT SHALL CONFORM TO ASTM D 1143 SPECIFICATIONS. 4.4.3 THE COVER OF REINFORCEMENT SHALL BE 50mm EXCEPT FOLLOWINGS (MAIN BARS)
• LATERAL PILE LOAD TEST : THE LATERAL LOAD TEST IS USED TO VERIFY THE P-Y MODEL APPLIED TO THE LATERAL BEHAVIOR DESIGN
LOCATION COVER(mm) LOCATION COVER(mm)
OF PILES AND TO VERIFY ACTUAL LATERAL STABILITY OF PILES. THE METHODOLOGY AND EQUIPMENT SHALL CONFORM TO
ASTM D 3966 SPECIFICATIONS. PSC BOX DECK SURFACES 60 ABUTMENTS 135
• INTEGRITY TEST : CROSSHOLE SONIC LOGGING TEST(CSL) USING CROSSHOLE SONIC ANALYZER IS DOWNHOLE VARIATION OF THE EXTERIOR 60 PILE CAPS 135
ULTRASONIC-PULSE VELOCITY TEST. THE METHODOLOGY AND EQUIPMENT SHALL CONFORM TO ASTM D 6760-02 SPECIFICATIONS.
INTERIOR 50 PIERS 135
THIS TEST IS RECOMMENDED FOR BORED PILES WITH EMBEDDED LENGTH OF MORE THAN 30M.
• VERTICALITY TEST : BEFORE CONCRETE POURING, VERTICALITY TEST IS USED TO MEASURE AND CHECK THE VERTICALITY, PYLONS 60 BORED PILES 135
DEFLECTION, DIAMETER, AND SURFACE CONDITION OF BOREHOLE TO ENABLE EXCAVATION TO MEET THE DESIGN CONDITIONS AND
INCREASE THE BEARING CAPACITY OF PILES. THE METHODOLOGY AND EQUIPMENT SHALL CONFORM TO ASTM D 8232-18 SPECIFICATIONS 4.4.4 CONSTRUCTION JOINT
4.1.3 FINALIZING PILE LENGTH • THE POSITION AND FORM OF ANY CONSTRUCTION JOINT SHALL BE AS SHOWN ON DRAWINGS OR AS AGREED WITH THE ENGINEER.
• AFTER FOUNDATION EXCAVATION, INSPECTION SHALL BE PERFORMED TO COMPARE THE ACTUAL SOCKET CONDITION WITH DESIGN • THE INTERFACE BETWEEN THE FIRST-AND SECOND-POUR CONCRETES SHALL BE ROUGHENED IN ACCORANCE WITH THE
CONDITION. FINAL FOUNDATION LEVEL SHALL BE APPROVED BY THE SUPERVISION TEAM OF DPWH CONSULTANT. SPECIFICATIONS.
4.2 EXCAVATION 4.4.5 FORMWORK
• EXCAVATION FOR STRUCTURES SHALL BE NEAT LINES AS SHOWN ON THE PLANS AND THE SOIL UNDERNEATH STRUCTURE FOUMDATIONS • FORMWORKS SHALL BE CONSTRUCTED SUCH THAT IT WILL NOT YIELD UNDER CONSTRUCTION LOAD AND SHALL BE SUCH AS TO
SHALL NOT BE DISTURBED. AVOID THE FORMATION OF FINS.
4.3 BACKFILLING • STRIPPING OF FORM AND SHORES SHALL CONFORM TO THE RELEVANT SPECIFICATIONS.
• BACKFILLING FOR STRUCTURES SHALL BE DONE WITH GRANULAR MATERIALS COMPACTED ACCORDING TO SPECIFICATIONS. 4.4.6 PROTECTION AND CURING OF CONCRETE
4.4 REINFORCED CONCRETE • CONCRETE SURFACES SHALL BE PROTECTED FROM HARMFUL EFFECTS OF SUN, WIND AND RUNNING WATER, AND SHALL BE
4.4.1 CONCRETE MIX AND PLACING KEPT DAMP FOR AT LEAST 7 DAYS, AND AS REQUIRED BY THE SPECIFICATIONS.
• CONCRETE SHALL BE DEPOSITED, VIBRATED AND CURED IN ACCORDANCE WITH THE SPECIFICATIONS.
• FOR CONCRETE DEPOSITED AGAINST THE GROUND, LEAN CONCRETE WITH A MINIMUM THICKNESS OF 50mm SHALL BE LAID FIRST 4.5 STRUCTURAL STEEL
BEFORE INSTALLING THE REINFORCEMENT. 4.5.1 THE CONTRACTOR SHALL PREPARE AND SUBMIT SHOP DRAWINGS FOR ALL STRUCTURAL STEEL WORK. THESE SHOP DRAWINGS
SHALL BE APPROVED BY THE ENGINEER BEFORE ANY FABRICATION WORK.
4.4.2 BAR BENDING, SPLICING AND PLACING 4.5.2 THE CONTRACTOR SHALL SUBMIT CERTIFIED TEST REPORTS OF THE FOLLOWING;
• PRIOR TO FABRICATION, THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL, SHOP DRAWINGS INDICATING • STRUCTURAL STEEL ( EXISTING AND NEW ) - CHEMICAL ANALYSIS AND TENSILE STRENGTH AS REQUIRED BY ASTM A709.
THE BENDING, CUTTING, SPLICING AND INSTALLATION OF ALL REINFORCING BARS. • HIGH STRENGTH BOLTS AND NUTS - CHEMICAL ANALYSIS AND TENSILE STRENGTH AND HARDNESS TEST AS REQUIRED BY
• BARS SHALL BE BENT, COLD BARS PARTIALLY EMBEDDED IN CONCRETE SHALL NOT BE FIELD BENT UNLESS PERMITTED BY THE ASTM A709.
ENGINEER. • ANCHOR BOLTS - CHEMICAL ANALYSIS, TENSILE STRENGTH AND HARDNESS TEST AS REQUIRED BY ASTM F1554.
• BAR SPLICING NOT INDICATED ON DRAWINGS SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER.
• NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION SHALL BE SPLICED, UNLESS SPECIFICALLY INDICATED.
• UNLESS OTHERWISE SHOWN ON DRAWINGS, THE CLEAR DISTANCE BETWEEN PARALLEL BARS IN A LAYERS SHALL NOT BE LESS
THAN 1.5TIMES THE NOMINAL DIAMETER OF THE BAR, NOR LESS THAN 1.5 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE,
THE CLEAR DISTANCE BETWEEN LAYERS SHALL NOT BE LESS THAN 25mm.
THE BARS IN THE UPPER LAYER SHALL BE PLACED DIRECTLY ABOVE THOSE IN THE BOTTOM LAYER.
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-004
KEON YONG KIM OF TUBOD, LANAO DEL NORTE GENERAL NOTES (3/3) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
2. APPROACH BRIDGE 1
Plan and Profile (1/6)
N
rt
The Beginning of Project
po
ga
STA.0+000
n
la
Si
BP 0+000
ub
ng
Ta
PLAN
SCALE 1:1,000
80
70 Bridge Begin
STA.0+360 1,020,000(Approach Bridge 1)
60
17@60,000=1,020,000
50
LEGEND :
The Beginning of Project
7.000
Casing)
7.700
8.100
4.700
8.200
Casing)
Casing)
Casing)
Casing)
(Steel
Residual Soil
(Steel
2.0
(Steel
(RCD EXCAVATION) (Steel
(Steel
2.3 1.5
3.2
4.0 1.0
Weathered Soil 2.4 1.2
2.0 2.2
2.7 2.3
3.0
-10 13.0 Unit-Ⅱ
(RCD EXCAVATION)
14.2
(RCD EXCAVATION)
(RCD EXCAVATION)
(RCD EXCAVATION)
16.7 12.7
-20 15.2
35.300
15.1
18.0
42.000
18.6 19.0
41.900
41.800
43.300
24.6
22.0
22.7
-30 30.0
32.0 Unit-Ⅲ 28.3
30.4 29.8
27.5 27.1
30.5
35.5 31.3
-40 35.1
37.0
34.9
38.2
35.8
42.0 40.7
42.0
-50 45.5
47.8
49.1 49.1
51.9 52.0
-60 54.7
52.9 53.3 Unit-Ⅳ
PVI STA.0+028,EL=2.62 PVI STA.0+290,EL=7.64 59.3
40
60
80
2.90 0+000
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500
520
540
560
580
600
S T A
2.80
2.92
3.23
3.62
4.00
4.38
4.77
5.15
5.53
5.92
6.30
6.68
7.05
7.39
7.71
8.00
8.25
8.50
8.75
8.99
9.24
9.48
9.73
9.98
-1.92 10.22
-2.02 10.47
-2.04 10.71
-2.12 10.96
-2.20 11.21
-2.19 11.45
Design Level
2.90
2.22
2.26
2.04
1.82
1.72
1.40
1.53
1.18
0.80
0.90
1.55
1.11
0.69
-0.41
-0.91
-0.88
-1.19
-1.37
-1.60
-1.86
-1.87
-1.97
-2.00
-2.01
Ground Level
HOR. CURVATRE
VER. CURVATRE
SUPERELEVATION
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-005
KEON YONG KIM OF TUBOD, LANAO DEL NORTE Plan and Profile (1/6) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Plan and Profile (2/6)
N
MATCH LINE STA. 0+600
BH-5 BH-6 BH-7 BH-8 BH-9 BH-10 BH-11 BH-12 BH-13 BH-14
Tubod
PLAN
SCALE 1:1,000
80
70
1,020,000(Approach Bridge 1)
60
17@60,000=1,020,000
50
LEGEND :
MATCH LINE STA. 0+600
BH-11
(Steel Casing)
9.800
12.000
(Steel Casing)
Casing)
(Steel Casing)
BH-12
13.600
Casing)
Casing)
(Steel
BH-13
15.300
15.300
16.200
16.300
(Steel
(Steel
Casing)
18.000
Casing)
Casing)
18.500
Casing)
(Steel
(Steel
(Steel
(Steel
-10
2.8
4.0 3.7
5.6 6.2
Sedimentary Clayey Soil Sedimentary Clayey Soil 2.3
6.5 6.8 4.7 1.9
7.5 6.5 6.5
7.9
8.7
10.0 8.5
9.5
Residual Soil 7.3 6.8
12.0 11.5 10.1 9.7
10.3
Weathered Soil 9.3
(RCD EXCAVATION)
-20 9.9
(RCD EXCAVATION)
15.1 10.1
(RCD EXCAVATION)
16.7
(RCD EXCAVATION)
(RCD EXCAVATION)
(RCD EXCAVATION)
18.2 14.2
(RCD EXCAVATION)
18.0
(RCD EXCAVATION)
19.2 17.3
(RCD EXCAVATION)
15.5
40.200
(RCD EXCAVATION)
39.200
17.4
38.000
21.4
36.400
21.0 20.6 18.7 18.5
-30
35.700
23.5
35.800
36.700
35.500
26.2
37.000
27.1 27.2 22.5
44.700
28.7 27.7 26.6 24.7
30.5
31.3 29.9 29.6
32.5 31.4
-40 35.8
36.9
33.0
34.4
Unit-Ⅲ
30.9
38.7
41.0 40.4 36.7
41.2 40.3
-50 43.7
47.0
42.7 41.5
49.1 45.7
52.0 49.1
-60 53.6
57.0
54.7 53.3
54.1 53.2
50.4
20
40
60
80
-4.35 16.37 1+000
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
100
120
140
160
180
200
S T A
-2.19 11.45
-2.30 11.70
-2.23 11.95
-2.31 12.19
-2.37 12.44
-2.30 12.68
-2.33 12.93
-2.34 13.18
-2.39 13.42
-2.47 13.67
-2.66 13.91
-2.56 14.16
-2.95 14.40
-3.21 14.65
-3.23 14.90
-3.37 15.14
-3.50 15.39
-3.73 15.63
-3.92 15.88
-4.12 16.13
-4.54 16.62
-5.01 16.86
-5.40 17.11
-5.84 17.36
-6.10 17.60
-6.33 17.85
-6.58 18.09
-6.92 18.34
-7.25 18.59
-7.59 18.83
Design Level
Ground Level
HOR. CURVATRE
VER. CURVATRE
SUPERELEVATION
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-006
KEON YONG KIM OF TUBOD, LANAO DEL NORTE Plan and Profile (2/6) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Plan and Profile (3/6)
N
MATCH LINE STA. 1+200
PLAN
SCALE 1:1,000
80
70
1,020,000(Approach Bridge 1) 320,000(Main Bridge) 900,000(Approach Bridge 2)
60
17@60,000=1,020,000 85,000 150,000 85,000 15@60,000=900,000
50 EL. 41.748 EL. 41.646
LEGEND :
MATCH LINE STA. 1+200
2.31m
10 BXH=
2.25m
EL. -0.560 EL. -1.060 PY1 PY2 EL. -1.060 EL. -0.560
90mX15m
0 H.W.L =0.94
(Steel Casing)
BH-14 BH-15
(Steel Casing)
(Steel Casing)
21.100
BH-16
23.200
24.700
BH-17
-10 0.3
EL. -20.860
BP-1
BP-2 BP-3
BH-18 EL. -20.960
BH-19
4.7 Sedimentary Sandy Soil Sedimentary Clayey Soil BP-4 EL. -23.760
6.5 2.7
3.5 EL. -24.240
-20 8.5
8.5 Residual Soil
10.4 9.3
2.5
4.0 1.1
1.0
3.7
Residual Soil 3.5
6.3
14.5 Weathered Soil 6.0
8.4 8.4
1.2 2.2
4.4
4.4
9.0
(RCD EXCAVATION)
5.0
-30 16.0 11.0 10.8
(RCD EXCAVATION)
(RCD EXCAVATION)
14.0 14.5
10.8 13.4
BORED PILE BORED PILE
34.900
16.0
33.800
37.300
16.8
23.0 22.5 21.7
31.5 27.7
30.7
BORED PILE 19.2
BORED PILE
35.0
37.1
EL. -56.560 Φ3,000 Φ3,000
-50 Unit-Ⅳ
31.0
43.5 42.6 42.5
EL. -61.060 35.5 34.6 31.2 30.9
EL. -61.560 36.9
44.5 38.8
47.4 EL. -65.060 37.4
-60 49.3 46.2 43.4
36.2
51.5
48.9
43.5
PVI STA.1+540,EL=23.015 39.7
46.4
55.8 75.5
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
76.6
80.0
S T A
85.5
86.8
86.0 85.5
-7.59 18.83
-8.17 19.08
-8.21 19.32
-8.55 19.57
-8.91 19.82
-9.45 20.06
-9.63 20.31
-9.98 20.55
-10.96 20.80
-11.66 21.05
-12.71 21.28
-13.76 21.47
-14.75 21.64
-15.63 21.77
-16.96 21.87
-18.19 21.94
-19.26 21.97
-19.98 21.98
-20.06 21.95
-20.06 21.88
-19.36 21.79
-18.70 21.66
-18.36 21.50
-16.90 21.31
-16.62 21.08
-16.34 20.83
-15.82 20.55
-15.85 20.28
-15.65 20.01
-15.83 19.73
-14.67 19.46
Design Level
Ground Level
HOR. CURVATRE
VER. CURVATRE
SUPERELEVATION
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-007
KEON YONG KIM OF TUBOD, LANAO DEL NORTE Plan and Profile (3/6) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Plan and Profile (4/6)
N
MATCH LINE STA. 1+800
BH-20 BH-21 BH-22 BH-23 BH-24 BH-25 BH-26 BH-27 BH-28 BH-29
Tubod
PLAN
SCALE 1:1,000
80
70
900,000(Approach Bridge 2)
60
15@60,000=900,000
50
LEGEND :
MATCH LINE STA. 1+800
(Steel Casing)
BH-23 Sedimentary Sandy Soil
20.400
(Steel Casing)
(Steel Casing)
BH-22
(Steel Casing)
(Steel Casing)
BH-24 4.0
(Steel Casing)
25.000
25.100
BH-25
(Steel Casing)
(Steel Casing)
BH-26
-10
27.000
BH-21
27.800
28.700
(Steel Casing)
30.700
31.000
32.800
(Steel Casing)
7.0 7.0 15.5
5.5
50.600
4.0 11.5 15.5
(RCD EXCAVATION)
-30 13.7
(RCD EXCAVATION)
12.5 17.1 16.5
(RCD EXCAVATION)
(RCD EXCAVATION)
20.0 18.3 16.8
17.0 17.8
(RCD EXCAVATION)
Weathered Soil
(RCD EXCAVATION)
(RCD EXCAVATION)
22.5
(RCD EXCAVATION)
31.5
38.600
21.0
(RCD EXCAVATION)
19.0 21.0 23.2
32.900
23.0
32.000
26.4
-40
37.000
24.4 29.0
33.200
36.5
33.300
29.000
26.200
34.300
31.9 31.7
28.1 33.7
35.2 37.3
Unit-Ⅰ
(RCD EXCAVATION)
-50 32.5
39.1
35.3
36.1 47.1 48.0
37.5 41.4 Unit-Ⅲ
17.400
40.5 40.3
53.0
60.6
20
40
60
80
-9.30 16.73 2+000
800
820
840
860
880
900
920
940
960
980
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
S T A
-14.67 19.46
-13.70 19.19
-12.92 18.91
-12.22 18.64
-11.78 18.37
-10.88 18.09
-10.23 17.82
-9.13 17.55
-8.28 17.27
-8.98 17.00
-9.75 16.45
-9.96 16.18
-10.52 15.91
-11.30 15.63
-11.53 15.36
-11.62 15.08
-12.04 14.81
-12.17 14.54
-11.80 14.26
-10.60 13.99
-9.05 13.72
-7.51 13.44
-5.48 13.17
-3.66 12.90
-2.26 12.62
-0.96 12.35
-0.81 12.08
-0.61 11.80
-0.68 11.53
-0.55 11.26
Design Level
Ground Level
HOR. CURVATRE
VER. CURVATRE
SUPERELEVATION
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-008
KEON YONG KIM OF TUBOD, LANAO DEL NORTE Plan and Profile (4/6) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
BC 2+650.4101
84
Plan and Profile (5/6)
705.29
EC 2+
MATCH LINE STA. 2+400
IP
R
A1
EB-3
A2
Tangub
N
2+600
2+400 2+500
AH-2 0+100 2+700
0+
BH-30 BH-31 BH-32 EB-7 EB-6 0+300
20
0
2+80
0
0+00
0
+000
Tubo
TP-4 d
ETC 2+650.4101
BTC 2+600.0001
B TC 2
T A. 3
2+90
ETC
0
+705.2
EB-4
2+75
S
INE
TP-5
984
5.
3+00
7084
0
CH L
MAT
PLAN
SCALE 1:1,000
80
70 Bridge End
900,000(Approach Bridge 2) STA.2+600
60
15@60,000=900,000
50
LEGEND :
MATCH LINE STA. 2+400
1.5 3.0
Sedimentary Sandy Soil 3.6
(Steel Casing)
4.2 4.2
4.0 4.0 5.7 5.0 Residual Soil
24.500
5.5 5.5
6.5 8.5 8.5 8.0 10.2
9.5 8.5
14.0
Residual Soil
-20 15.0
(Steel Casing)
(Steel Casing)
51.500
49.800
24.6
-30 25.2
Weathered Soil 28.5
(RCD EXCAVATION)
27.0
30.0
31.0 30.3
Weathered Soil
28.500
40.0
(RCD EXCAVATION)
44.8 44.5
-50 47.3
5.200
49.0
Unit-Ⅰ
11.500
50.0 49.5
Unit-Ⅱ
-60 56.0 57.3
58.5
57.0
Unit-Ⅱ
59.9
62.0
60.1
63.3
63.9 Unit-Ⅰ PVI STA.2+960,EL=3.6
-70
64.7
65.7 65.0
68.2 70.3
CL=180 M (K=131.65 M/%)
72.0
3.69 3+000
400
420
440
460
480
500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
S T A
9.89
9.62
9.34
9.07
8.80
8.52
8.25
7.98
7.70
7.43
7.15
6.88
6.61
6.33
6.06
5.79
5.51
5.24
4.97
4.70
4.45
4.24
4.06
3.91
3.79
-0.55 11.26
-0.44 10.98
-0.49 10.71
-0.36 10.44
-0.41 10.16
Design Level
-0.33
-0.30
-0.25
-0.20
0.00
0.51
1.02
1.39
1.04
-1.12
0.40
0.20
-1.08
-0.06
-0.36
-0.73
-0.74
-1.80
0.42
0.29
0.09
0.07
0.14
0.17
0.37
0.58
Ground Level
HOR. CURVATRE
VER. CURVATRE
SUPERELEVATION
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-009
KEON YONG KIM OF TUBOD, LANAO DEL NORTE Plan and Profile (5/6) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Plan and Profile (6/6)
The End of Project
N
STA.3+169
d
bo
Tu
Tangub
P-5
T3+000 3+100
3+200 3+300
EB-5
EP 3+300
PLAN
SCALE 1:1,000
80
70
60
50
The End of Project LEGEND :
MATCH LINE STA. 3+000
40 Fault Zone
STA.3+169
Decomposed Zone
30
Sheared/Fractured Zone
20
10
EB-5
S=+0%
0 1.7
Residual Soil
-10 10.2
-30 28.5
35.6
-40
-50
-60
-70
20
40
60
80
3.69 3+000
3.60 3+300
100
120
140
160
180
200
220
240
260
280
S T A
3.63
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
Design Level
0.58
-0.21
-0.42
-0.28
0.38
1.43
-0.20
-0.19
2.14
3.60
3.60
3.60
3.60
3.60
3.60
3.60
Ground Level
HOR. CURVATRE
VER. CURVATRE
SUPERELEVATION
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-010
KEON YONG KIM OF TUBOD, LANAO DEL NORTE Plan and Profile (6/6) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
BRIDGE BEARING LAYOUT (1/2)
SCALE 1:400
SPAN LENGTH (선형중심) 780 59.220 60.000 60.000 60.000 60.000
STA. 0K+360.0000
X = 891798.112655 Y = 584782.025633
STA. 0K+360.0000 STA. 0K+420.0000 STA. 0K+480.0000 STA. 0K+540.0000 STA. 0K+600.0000
X = 891793.835673 Y = 584777.131001 X = 891752.931433 Y = 584821.505466 X = 891707.750212 Y = 584860.985300 X = 891662.568991 Y = 584900.465133 X = 891617.387770 Y = 584939.944967
STA. 0K+420.0000 STA. 0K+480.0000 STA. 0K+540.0000 STA. 0K+600.0000
A1 P1 P2 P3 P4
L OF ROAD
X = 891613.110788 Y = 584935.050334
1.250
X = 891748.654451 Y = 584816.610834 X = 891703.473230 Y = 584856.090668 X = 891658.292009 Y = 584895.570501
1
1 1 1 1
13.000
11.750
C
2 2 2 2
2
A1 P1 P2
DIV BRIDGE BEARING X Y Z ANGLE DIV BRIDGE BEARING X Y Z ANGLE DIV BRIDGE BEARING X Y Z ANGLE
1 9000 kN - OMEQS 891796.0251 584782.1898 EL. 4.6307 311°08'50.3" 1 16500 kN - OMEQS 891750.0362 584818.1922 EL. 5.2250 311°08'50.3" 1 15000 kN - OMEQS 891704.8550 584857.6720 EL. 5.9710 311°08'50.3"
2 9000 kN - OMEQS 891789.1161 584774.2831 EL. 4.6307 311°08'50.3" 2 16500 kN - OMEQS 891747.2727 584815.0295 EL. 5.2250 311°08'50.3" 2 15000 kN - OMEQS 891702.0914 584854.5093 EL. 5.9710 311°08'50.3"
P3 P4
1 15000 kN - OMEQS 891659.6738 584897.1518 EL. 6.7090 311°08'50.3" 1 15000 kN - OMEQS 891614.4926 584936.6317 EL. 7.4420 311°08'50.3"
2 15000 kN - OMEQS 891656.9102 584893.9892 EL. 6.7090 311°08'50.3" 2 15000 kN - OMEQS 891611.7290 584933.4690 EL. 7.4420 311°08'50.3"
1 1 1 1
2 2 2 2
PLAN VIEW
P5 P6 P7
DIV BRIDGE BEARING X Y Z ANGLE DIV BRIDGE BEARING X Y Z ANGLE DIV BRIDGE BEARING X Y Z ANGLE
1 15000 kN - EQS 891569.3114 584976.1115 EL. 8.1800 311°08'50.3" 1 15000 kN - EQS 891524.1301 585015.5913 EL. 8.9180 311°08'50.3" 1 15000 kN - EQS 891478.9489 585055.0712 EL. 9.6560 311°08'50.3"
2 15000 kN - EQS 891566.5478 584972.9488 EL. 8.1800 311°08'50.3" 2 15000 kN - EQS 891521.3666 585012.4287 EL. 8.9180 311°08'50.3" 2 15000 kN - EQS 891476.1853 585051.9085 EL. 9.6560 311°08'50.3"
P8
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-011
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BRIDGE BEARING LAYOUT (1/2) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
BRIDGE BEARING LAYOUT (2/2)
SCALE 1:400
1 1 1 1
2 2 2 2
PLAN VIEW
P9 P10 P11
DIV BRIDGE BEARING X Y Z ANGLE DIV BRIDGE BEARING X Y Z ANGLE DIV BRIDGE BEARING X Y Z ANGLE
1 15000 kN - EQS 891388.5865 585134.0308 EL. 11.1320 311°08'50.3" 1 15000 kN - EQS 891343.4053 585173.5107 EL. 11.8700 311°08'50.3" 1 15000 kN - EQS 891298.2240 585212.9905 EL. 12.6080 311°08'50.3"
2 15000 kN - EQS 891385.8229 585130.8682 EL. 11.1320 311°08'50.3" 2 15000 kN - EQS 891340.6417 585170.3480 EL. 11.8700 311°08'50.3" 2 15000 kN - EQS 891295.4604 585209.8278 EL. 12.6080 311°08'50.3"
P12
1 1 1 1 1 3
2 2 2 2 2 4
STA. 1K+140.0000 STA. 1K+200.0000 STA. 1K+260.0000 STA. 1K+320.0000 STA. 1K+380.0000
X = 891202.202815 Y = 585285.474203 X = 891157.021594 Y = 585324.954037 X = 891111.840372 Y = 585364.433870 X = 891066.659151 Y = 585403.913703 X = 891021.477930 Y = 585443.393537
PLAN VIEW
DIV BRIDGE BEARING X Y Z ANGLE DIV BRIDGE BEARING X Y Z ANGLE DIV BRIDGE BEARING X Y Z ANGLE
1 15000 kN - OMEQS 891207.8616 585291.9502 EL. 14.0840 311°08'50.3" 1 15000 kN - OMEQS 891162.6804 585331.4300 EL. 14.8270 311°08'50.3" 1 15000 kN - OMEQS 891117.4991 585370.9098 EL. 15.5650 311°08'50.3"
2 15000 kN - OMEQS 891205.0980 585288.7875 EL. 14.0840 311°08'50.3" 2 15000 kN - OMEQS 891159.9168 585328.2673 EL. 14.8270 311°08'50.3" 2 15000 kN - OMEQS 891114.7356 585367.7472 EL. 15.5650 311°08'50.3"
P16 P17(전)
1 16500 kN - OMEQS 891072.3179 585410.3897 EL. 16.2950 311°08'50.3" 1 9000 kN - OMEQS 891028.1081 585449.0207 EL. 17.0541 311°08'50.3"
2 16500 kN - OMEQS 891069.5543 585407.2270 EL. 16.2950 311°08'50.3" 2 9000 kN - OMEQS 891025.3445 585445.8580 EL. 17.0541 311°08'50.3"
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-012
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BRIDGE BEARING LAYOUT (2/2) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
GENERAL DRAWING OF ABUTMENT (1/2)
[A1] SCALE 1:100
13.000
(Front face)
(Front face)
880 (Back face)
880
4.129
3.999
3.999
EL. ② fck = 35 MPa EL. ① CLOF SHOE
EL. 4.372 EL. 4.372
6.220
6.090
6.090
8.500
8.500
8.370
8.370
100 900 3.600 1.500 100
2.971
2.971
2.971
1.250 10.500 1.250
EL. 0.001
100 1.400
100 1.400
100 1.400
100 1.400
100 1.400
100 1.400
fck = 35 MPa
A
3.000 7.000 3.000 2@3.000=6.000
13.000 6.000
FRONT VIEW
SCALE 1:100 SECTION A-A
SCALE 1:100
20 11.960 20
CL Of Road
AB
SL
A CHMPa
O 5
7.700
PR =3
AP fck
100
DOWEL BAR D25 29EA
C.T.C 400 L=600
300X300 300X300
Bored Pile
1.500 1.120 1.680 500 900
500 900
2@3.000=6.000
(D=3000mm, L=40.0M)
300
300
6.000
5
6.000
100
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-013
KEON YONG KIM OF TUBOD, LANAO DEL NORTE GENERAL DRAWING MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF ABUTMENT (1/2) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
GENERAL DRAWING OF ABUTMENT (2/2)
[A1] SCALE 1:100
6.800 6.800
1.230% 0.304%
1.500
1.500
3.999
3.999
W ck =
W ck =
6.670
6.670
f
f
IN 3
IN 3
G 5
G 5
W MP
W P
5.100
5.100
8.370
8.370
8.370
8.370
8.349
8.286
AL a
AL a
M
1:
1:
L
1.
1.
0
0
2.971
2.971
300X300 300X300
349
300
300
286
100 1.400
1.400
100 1.400
1.400
100 1.400
100 1.400
B C
6.000 6.000
SECTION B-B SECTION C-C
SCALE 1:100 SCALE 1:100
WING WALL (LEFT) WING WALL (RIGHT)
SCALE 1:100 SCALE 1:100
T1
h4
EL. "X"
h3
h2 A h2
E
h2
50 50 L
h1
DETAIL A
h2
T2
T1
S(%)
C5
50
D D
T
L3 C2 C1
C6
B
2.800
W
50
C4
h2
Longitudinal Direction
NO. S(%) L W T T1 T2
SECTION D-D 1 1.230 1.875 1.335 35 22 48
SCALE 1:30
Longitudinal Direction
2 1.230 1.875 1.335 35 22 48
L3 C2 C1
C3
SOLE PLATE DETAIL TABLE
SCALE 1:20
L3
TABLE OF BEARING ELEVATION
NO. Bearings EL.'X' h1 h2 h3 h4 A B C1 C2 C3 C4 C5 C6 E L1 L2 L3 L4
L4
1 9000 kN - OMEQS 4.631 209 50 306 35 680 950 1120 1630 2800 1000 1000 2000 600 0 0 50 50 NOTE :
1. All dimensions are in mm units of the structure.
2 9000 kN - OMEQS 4.631 209 50 306 35 680 950 1120 1630 2800 1000 1000 2000 600 0 0 50 50
2. Body structure concrete design criteria of strength fck=35MPa.
3. Footing concrete should be placed in bearing stratum without ground water.
TABLE OF EDGE DISTANCE 4. Bridge bearing and changes to be carried out after the approval of the supervisor.
5. The bearing blue print and drawings are different when installing body structure
concrete or non-shrink mortar shall adjustment device of bearing height.
Items Calculated Distance Applied Distance 6. All structures shall be chamfered portion at an acute angle(20mmX20mm).
EDGE DISTANCE S = 200 + 5.0L = 200 + 5.0 X 60.0 = 500mm S' = 780mm 7. Bottom section of Soleplate should be installed exactly horizontal.
8. When construct Support ANCHOR detail should consider Support detail.
N = (200+1.67L+6.66H) x (1+0.000125 Theta ^2) = 1962mm
DETAIL "A" SUPPORT DISTANCE
(L=1020.000, H=8.791, Theta=0)
N' = 1970mm 9. Before placing concrete pumice and earth material must be completely removed
and Should be reinforced and attached to bedrock in cutting surface.
SCALE 1:5
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-014
KEON YONG KIM OF TUBOD, LANAO DEL NORTE GENERAL DRAWING MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF ABUTMENT (2/2) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
LONGITUDINAL
GENERAL DRAWING OF PIER (1/4)
SCALE 1:100
[Type-1 : P1~P5]
9,000
CL OF ROAD
DIMENSIONES TABLE
CL OF PIER
1,600
1,600
3,200
3,200
DIVISION H1 H2 H3 H4 EL.A EL.B EL.C EL.D
DISTANCE(s)
1,600
1,600
P1 0.649 7.000 42.000 52.149 5.089 5.089 -47.060 -2.000
EDGE
318
P2 1.387 7.700 43.300 54.887 5.827 5.827 -49.060 -2.000
1 2
P3 2.125 8.100 41.900 54.625 6.565 6.565 -48.060 -2.100
2,400 4,200 2,400 3,000 P4 2.863 8.200 41.800 55.363 7.303 7.303 -48.060 -2.200
9,000 3,200
CL OF ROAD
CL OF ROAD
EL. A EL. ① EL. ② EL. B
600
600
1,500 1,000
1,500 1,000
CON'C fck=40MPa
H1
A 3,000 A
1,000
H.W.L 0.94 m
EL. D
SEA Bed
(Steel Casing)
(Steel Casing)
H4
H4
H2
H2
(RCD EXCAVATION)
(RCD EXCAVATION)
NOTES
H3
H3
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-015
KEON YONG KIM OF TUBOD, LANAO DEL NORTE GENERAL DRAWING MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF PIER (1/4) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
LONGITUDINAL
GENERAL DRAWING OF PIER (2/4)
SCALE 1:100
[Type-2 : P6~P16]
9,000
CL OF ROAD
DIMENSIONES TABLE
CL OF PIER
1,600
1,600
3,200
3,200
DIVISION H1 H2 H3 H4 EL.A EL.B EL.C EL.D
DISTANCE(s)
1,600
1,600
P6 4.339 10.800 39.200 56.839 8.779 8.779 -48.060 -2.300
EDGE
318
P7 5.077 12.000 38.000 57.577 9.517 9.517 -48.060 -2.500
1 2
P8 5.815 13.600 36.400 58.315 10.255 10.255 -48.060 -2.900
2,400 4,200 2,400 600 1,800 600 P9 6.553 15.300 35.700 60.053 10.993 10.993 -49.060 -3.300
9,000 P10 7.291 15.300 44.700 69.791 11.731 11.731 -58.060 -3.800
P11 8.029 16.200 35.800 62.529 12.469 12.469 -50.060 -4.500
PIER CAP COLUMN SECTION A-A P12 8.767 16.300 36.700 64.267 13.207 13.207 -51.060 -5.800
SCALE 1:100 SCALE 1:100 P13 9.505 18.500 35.500 66.005 13.945 13.945 -52.060 -6.600
P14 10.243 18.000 37.000 67.743 14.683 14.683 -53.060 -7.500
9,000 3,200 P15 10.981 21.100 34.900 69.481 15.421 15.421 -54.060 -8.600
P16 11.719 23.200 33.800 71.219 16.159 16.159 -55.060 -9.700
600 1,800 4,200 1,800 600 1,600 1,600
CL OF ROAD
CL OF ROAD
EL. A EL. ① EL. ② EL. B
600
600
1,500 1,000
1,500 1,000
CON'C fck=40MPa
100
H1
A 3,000 A
1,000
H.W.L 0.94 m
A
EL. D
SEA Bed
2,000
2,000
(Steel Casing)
(Steel Casing)
H4
H4
H2
H2
B B
A
2,000 100
(RCD EXCAVATION)
NOTES
H3
H3
2,000
1. All dimensions are in mm units of the structure.
2. Body structure concrete design criteria of strength fck=40MPa.
3. Footing concrete should be placed in bearing stratum without ground water.
EL. C
100
4. Bridge bearing and changes to be carried out after the approval of the supervisor.
5. The bearing blue print and drawings are different when installing body structure
concrete or non-shrink mortar shall adjustment device of bearing height.
6. All structures shall be chamfered portion at an acute angle(20mmX20mm).
3,000 3,000 SECTION B-B 7. Bottom section of Soleplate should be installed exactly horizontal.
SCALE 1:100 8. When construct Support ANCHOR detail should consider Support detail.
9. Before placing concrete pumice and earth material must be completely removed
LONGITUDINAL SECTION TRANSVERSE SECTION and Should be reinforced and attached to bedrock in cutting surface.
SCALE 1:100 SCALE 1:100
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-016
KEON YONG KIM OF TUBOD, LANAO DEL NORTE GENERAL DRAWING MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF PIER (2/4) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
h2
1 15000 kN - OMEQS 7.447 94 50 422 34 1500 2000 1000 1000 2000 1250 1250 2500 600
P4
50
2 15000 kN - OMEQS 7.447 94 50 422 34 1500 2000 1000 1000 2000 1250 1250 2500 600
1 15000 kN - EQS 8.180 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
TEMPORARY SHOE P5
2 15000 kN - EQS 8.180 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
C5
1 15000 kN - EQS 8.918 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
P6
2 15000 kN - EQS 8.918 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
1 15000 kN - EQS 9.658 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
P7
LONGITUDINAL 2 15000 kN - EQS 9.658 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
C6
B
1 15000 kN - EQS 10.394 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
P8
2 15000 kN - EQS 10.394 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
1 15000 kN - EQS 11.132 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
P9
2 15000 kN - EQS 11.132 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
C4
1 15000 kN - EQS 11.870 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
P10
2 15000 kN - EQS 11.870 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
50
1 15000 kN - EQS 12.608 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
h2
P11
2 15000 kN - EQS 12.608 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
1 15000 kN - EQS 13.346 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
P12
C1 C2 2 15000 kN - EQS 13.346 89 50 427 34 1500 2000 1000 1000 2000 1250 1250 2500 600
1 15000 kN - OMEQS 14.089 94 50 422 34 1500 2000 1000 1000 2000 1250 1250 2500 600
C3 P13
2 15000 kN - OMEQS 14.089 94 50 422 34 1500 2000 1000 1000 2000 1250 1250 2500 600
1 15000 kN - OMEQS 14.827 94 50 422 34 1500 2000 1000 1000 2000 1250 1250 2500 600
P14
2 15000 kN - OMEQS 14.827 94 50 422 34 1500 2000 1000 1000 2000 1250 1250 2500 600
1 15000 kN - OMEQS 15.565 94 50 422 34 1500 2000 1000 1000 2000 1250 1250 2500 600
P15
2 15000 kN - OMEQS 15.565 94 50 422 34 1500 2000 1000 1000 2000 1250 1250 2500 600
1 16500 kN - OMEQS 16.295 86 50 430 34 1500 2000 1000 1000 2000 1250 1250 2500 600
P16
2 16500 kN - OMEQS 16.295 86 50 430 34 1500 2000 1000 1000 2000 1250 1250 2500 600
1 9000 kN - OMEQS 17.054 102 50 415 33 1500 2000 1000 1000 2000 1250 1250 2500 600
P17
2 9000 kN - OMEQS 17.054 102 50 415 33 1500 2000 1000 1000 2000 1250 1250 2500 600
h4
h3
EL. "X"
E
h2
h1
NOTES
1,600 1,600
1. All dimensions are in mm units of the structure.
3,200 2. Body structure concrete design criteria of strength fck=40MPa.
3. Footing concrete should be placed in bearing stratum without ground water.
4. Bridge bearing and changes to be carried out after the approval of the supervisor.
5. The bearing blue print and drawings are different when installing body structure
DETAIL OF BEARING concrete or non-shrink mortar shall adjustment device of bearing height.
6. All structures shall be chamfered portion at an acute angle(20mmX20mm).
7. Bottom section of Soleplate should be installed exactly horizontal.
8. When construct Support ANCHOR detail should consider Support detail.
9. Before placing concrete pumice and earth material must be completely removed
and Should be reinforced and attached to bedrock in cutting surface.
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-017
KEON YONG KIM OF TUBOD, LANAO DEL NORTE GENERAL DRAWING MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF PIER (3/4) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Steel Plate : ASSHTO M270M/M270 Grade 36 or KS D 3503 SS235
W
1 1.230 1.985 1.985 34 22 46
P6
2 1.230 1.985 1.985 34 22 46
1 1.230 1.985 1.985 34 22 46
P7
2 1.230 1.985 1.985 34 22 46
1 1.230 1.985 1.985 34 22 46
LONGITUDINAL P8
2 1.230 1.985 1.985 34 22 46
1 1.230 1.985 1.985 34 22 46
S(%) P9
T2
T1
NOTES
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-018
KEON YONG KIM OF TUBOD, LANAO DEL NORTE GENERAL DRAWING MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF PIER (4/4) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
REINFORCEMENT OF ABUTMENT (1/7)
[A1] SCALE 1:50
13.000
150(Front face)
150(Front face)
150(Back face)
150(Back face)
150 50@250=12.500 150(Front face) 150 300 200 13@200 150
100 100 200 =2.600
P1 H20 A P1 H20
150
150
P3 H16
P4 H16
P2 H20 P4 H16 S3 H12
20@200=4.000
19@200=3.800
19@200=3.800
20@200=4.000
20@200=4.000
P1 H20
P2 H20
34@200=6.800
P4 H16 P3 H16 S2 H12
8.500
8.500
135199
199
8.370
8.370
265
135
135
70
70
1
1351
135
S1 H12
12@200=2.400
W1 H20
13@200
13@200
A1 H16
=2.600
=2.600
12@200
12@200
Back face Front face
=2.400
=2.400
A1 H16
W3 H20
A2 H16
A4 H16 B3 H20 B1 H20 B1 H20
A4 H16
A2 H16
4@200 550
4@200 550
4@200 550
4@200 550
550
550
B5 H16 S4 H12 B5 H16 B5 H16
=800
=800
=800
=800
5@200
5@200
=1.000
=1.000
200
200
200
200
A5 H16 A5 H16 S4 H12 B2 H20
150 50@250=12.500 150(Front face)
100 100
150 100@125=12.500 150(Back face)
150 3@200=600 3.600 150 150
100 100
13.000 150 6@200=1.200 Front face(1단)
150 27@200=5.400 150
150 150 Back face(1단)
6.000
A
FRONT VIEW SECTION A-A
SCALE 1:50
SCALE 1:50
SO3 H20
SO1 H16
150
2.750
100
15@125=1.875
12@125=1.500
150
1.875
2.000
100 83
267 250
700
100
C C
SO4 H20 SO3 H20
150
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-019
KEON YONG KIM OF TUBOD, LANAO DEL NORTE REINFORCEMENT MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF ABUTMENT (1/7) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
REINFORCEMENT OF ABUTMENT (2/7)
500 500
[A1] SCALE 1:50
=600150
B3 H20
40@125=5.000
20@250=5.000
20@250=5.000
40@125=5.000
WL13 H25 WL4 H28 WR4 H28 WR13 H25
6.800
27@200=5.400
B1 H20
3.600
6.000
6.000
WL11 H25
800 3@250=750
A3 H16 B4 H20
7@125=875
675 7@125=875
WL2 H25
WR24 H12
150
300
P1 H20
675
150 150
WL20 H28
WR20 H28
15@200=3.000
3.600
FOOTING PLAN
150 100@125=12.500 150
SCALE 1:50
100 100 (Back face)
150 50@250=12.500 150
100 100 (Front face)
13.000
PLAN VIEW
SCALE 1:50
1.000
1.000
P2 H20 P2 H20
W1 H20
W3 H20 W3 H20
B1 H20 B3 H20
NOTE :
when assembling rebar joints should not be concentrated in one place.
1 Cycle B2 H20
MAIN REINFORCEMENT 2 Cycle B4 H20
SCALE 1:50
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-020
KEON YONG KIM OF TUBOD, LANAO DEL NORTE REINFORCEMENT MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF ABUTMENT (2/7) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
REINFORCEMENT OF ABUTMENT (3/7)
[A1] SCALE 1:50
6.800
6.800
150 100 40@125=5.000 7@125=875 1단
500 150 100 20@250=5.000 3@250=750 1단
800 675
150 200 150
A
WL17 H25 WL12 H25 WL8 H25 WL3 H28
150
170 150
150
150
150
170 150
170
170
170
170
WL20 H28
41
166
WL13 H25
WL4 H28 WL4 H28
WL13 H25
B B
WL21 H28
52@125=6.500
51@125=6.375
26@250=6.500
52@125=6.500
26@250=6.500
25@250=6.250
WL11 H25 WL2 H25
8.370
8.286
8.370
8.370
8.370
8.286
WL22 H28
WL18 H25
WL15 H25 WL6 H28
WL15 H25 WL6 H28
WL2 H25
WL11 H25
WL7 H28
WL16 H25
WL25 H12
WL1 H28
WL10 H25 WL1 H28
150
150
150
150
150
150
C C
1.200
1.200
1.200
1.200
1.200
1.200
WL23 H25
200
200
200
200
200
200
WL23 H25 WL10 H25
A
6.800 4.500
WL22 H28
200
WL1 H28
150
150
WL17 H25 WL13 H25 WL26 H12 WL11 H25 WL24 H12 500
200
150
WL10 H25 WL25 H12
150 100 20@250=5.000 3@250=750 WL11 H25
800
6.800
150 3@250=750 3.600
4.500 NOTE :
SCALE 1:50
SCALE 1:50
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-021
KEON YONG KIM OF TUBOD, LANAO DEL NORTE REINFORCEMENT MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF ABUTMENT (3/7) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
REINFORCEMENT OF ABUTMENT (4/7)
[A1] SCALE 1:50
6.800 6.800
500 150 100 20@250=5.000 3@250=750 1단 150 100 40@125=5.000 7@125=875 675 1단
800
150 200 150
A
WR17 H25 WR12 H25 WR8 H25 WR3 H28
150
170 150
150
150
150
170 150
170
170
170
170
WR20 H28
104
229
WR13 H25
WR4 H28
WR4 H28
WR13 H25
B B
WR21 H28
52@125=6.500
51@125=6.375
52@125=6.500
26@250=6.500
26@250=6.500
25@250=6.250
WR2 H25 WR11 H25
WR9 H25
8.370
8.349
WR24 H12
8.370
8.370
8.370
8.349
WR18 H25 WR15 H25 WR22 H28
WR6 H28 WR15 H25
WR6 H28
WR11 H25 WR2 H25
150
150
150
150
150
150
C C
WR10 H25
1.200
1.200
1.200
1.200
1.200
1.200
WR23 H25
200
200
200
200
200
200
WR23 H25
A
6.000 6.000
150
WR17 H25 WR13 H25 WR26 H12 WR11 H25 WR24 H12
500
200
150
150
500
200
NOTE :
SECTION B-B SECTION C-C when assembling rebar joints should not be concentrated in one place.
SCALE 1:50
SCALE 1:50
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-022
KEON YONG KIM OF TUBOD, LANAO DEL NORTE REINFORCEMENT MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF ABUTMENT (4/7) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
REINFORCEMENT OF ABUTMENT (5/7)
[A1] SCALE 1:50
a
b
c
r r
j j
d
c
SO3 H20 WL14 H25 S2 H12 WL11 H25 WL2 H25
L=2.625 N=64 L=5.947 N=10 L=668 N=60 L=9.290 N=4 L=9.640 N=8
a=6.452~4.202 b=620 x1=90° a=468 b=100 r=270 a=7.740~7.731
b=424 c=500 j=630X1 r=270 a=200 b=7.742 c=424 d=500 j=780X1
~7.731
c
a a=6.199~1.391 b=200 a=2.500 b=700
b
a
a a
WR17 H25 WL23 H25 WR4 H28
L=3.971 N=20 L=2.916 N=3 L=7.500 N=9
a=6.153~1.389 b=200 a=2.316 b=300 x1=135° x2=135° a=6.500 b=200 c=800
b
c
B3 H20 WR19 H28 B1 H20 WR20 H28 WR5 H28
L=4.750 N=52 L=4.000 N=31 L=6.950 N=53 L=1.714 N=4 L=6.201 N=20
a=4.200 b=550 a=3.000 b=1.000 a=5.700 b=1.050 c=200 a=1.114 b=300 x1=135° x2=135° a=6.389~4.014 b=200 c=800
WL10 H25
L=4.820 N=1
a=4.200 b=620 x1=90° r
c
b
WL12 H25 W1 H20
L=7.120 N=2 L=4.635 N=53
a=6.500 b=620 x1=90° r=200 a=3.821 b=314 c=500
b
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-023
KEON YONG KIM OF TUBOD, LANAO DEL NORTE REINFORCEMENT MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF ABUTMENT (5/7) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
REINFORCEMENT OF ABUTMENT (6/7)
[A1] SCALE 1:50
NOTE :
when assembling rebar joints should not be concentrated in one place.
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-024
KEON YONG KIM OF TUBOD, LANAO DEL NORTE REINFORCEMENT MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF ABUTMENT (6/7) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
REINFORCEMENT OF ABUTMENT (7/7) BAR BENDING SCHEDULE
[A1] SCALE 1:50
7.700
a
100 25@300=7.500 100 11 H12
L=410 N=286
100(Front face)
100(Back face)
a=210 b=100
a
1
H25
H28
A 3 H25 L=7.500 N=45
H25
100
100
b
j
7
130
130
130
130
2 H25 8 H12
L=7.342 N=2 L=12.507 N=50
a=7.407~7.277 a=11.760~11.613 b=250 j=320X1
B B
H12
H12
9 H12 3 H25 L=7.342 N=2
4
8
a=7.407~7.277
j
x1 x2
D3 H25 b
L=600 N=29
b
11 H12
D1 H16
46@250=11.500
92@125=11.500
46@250=11.500
92@125=11.500
H25
11.960
5
150 x 150 x 15
1
a
5 H28 D2 H16 TAR PAPER T=15MM
b
D3 H25
5 H28 L=8.000 N=91 3@100=300
a=7.500 b=250
3@100=300
6 H28
10 H12 L=7.842 N=2
a=7.407~7.277 b=250
H25
H28
6
130
130
130
130
100
100
100
100
A 6 H28
100 100
100 50@150=7.500 100
MATERIAL TABLE MATERIAL QUANTITIES
250 (PER EACH) (GRADE 60) ( PER EACH)
450
7.700
ITEMS STANDARD UNIT Q'TY REMARK LENGTH TOTAL UNIT TOTAL REMARKS
NO. DIA Q'TY
(M) LENGTH WEIGHT WEIGHT (%,TON)
PLAN VIEW REBAR SD-300 KG 8.677 ADD 3% 5 H28 8.000 91 728.000 ADD 6%
SCALE 1:50 TAR PAPER T=15MM M2 0.12
SECTION A-A STEEL PIPE ∅60MM M 0.30
6
7
"
" 7.842
7.842 2
2
15.684
15.684
SCALE 1:50 7.700 ELASTIC RUBBER PAD 150x150x15 EA 1 SUB-TOTAL 759.368 4.840 3.675 3.896
SILANT ASPHALT M3 0.001
100 25@300=7.500 100 1 H25 7.500 45 337.500 ADD 6%
2 " 7.342 2 14.684
3 " 7.342 2 14.684
1 H25 4 H12 11 H12 D3 " 0.600 29 17.400
100
250
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-025
KEON YONG KIM OF TUBOD, LANAO DEL NORTE REINFORCEMENT MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF ABUTMENT (7/7) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
50
311 200 50
180 170 (BOTTOM)
170 180 20@125=2,500 180 170 (1LAYER)
15@500=7,500
100 89
170 580 580 170
750
700
C7 H22 C2 H32 C4 H32 C1 H32 C3 H32 C9 H22 C3 H32 C1 H32 C2 H32
175
D S3 H16 S4 H16 D
C11 H22
=500 400
1,388
2@250
CL OF PIER
C10 H22
20@125=2,500
TOP
10@250=2,500
116
3,200
1,600 1,600
197
BOTTOM
170 180
PIER CAP
SCALE 1:50 SECTION A-A S1 H16
125
SCALE 1:50
3,200
9,000
170 180 10@250=2,500 180 170 (2LAYER)
30@250=7,500
14@125=1,750
170 580 580 170
170 180 20@125=2,500 180 170 (1LAYER) S2 H16
2,000
170 580 15@500=7,500 580 170
C4 H32
C3 H32 C1 H32 C2 H32
100 175
A C7 H22 C8 H22 B C1 H32 C2 H32 C9 H22
100 175
175
300
C11 H22 C11 H22
125
300
650
7@250=1,750
2,500
C10 H22
7@250=1,750
2,500
3@500
=1,500
C8 H22
2,000
175
C5 H32 C6 H32 C12 H22
SECTION C-C
175
175
C10 H22 C5 H32 C11 H22
B 170 430 4@500=2,000 430 170
SCALE 1:30
16@150=2,400
C1 H32 C2 H32 C3 H32 C4 H32 S4 H16
2,400
16@150=2,400
C5 H32 C6 H32
2,400
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-026
KEON YONG KIM OF TUBOD, LANAO DEL NORTE REINFORCEMENT DETAIL MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF PIER CAP(1/2) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 35(fck=35MPa) : Abutment
: Grade 40(fck=40MPa) : Bored PIle
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
2,000 100
REBAR DETAIL 60 65 14@125 65 60 60 40
=1,750
MATERIAL QUANTITIES
E
P2 H20
P3 H20
65 60
65 60
A (GRADE 60) (PER PIER)
A TOTAL UNIT TOTAL
NO. DIA LENGTH Q'TY REMARKS
B
LENGTH WEIGHT WEIGHT
P2 H20
14@125
14@125
=1,750
=1,750
P4 H20
2,000
2,000
C1 H32 9.370 12 112.440 ADD 6%
C2 " 7.967 12 95.604
S3 H16 L=2.400 N=68 C12 H22 L=3.880 N=36
P1 H20
A=2.860 B=510 C3 " 9.370 11 103.070 F F
60 65
60 65
C4 " 7.967 11 87.637
S4 H16 L=2.400 N=68 S1 H16 L=3.150 N=30 C5 " 9.847 12 118.164 E P1 H20
A=1.750 B=700
C6 " 9.847 11 108.317
P2 H20 P1 H20
SUB TOTAL 625.232 6.320 3.951 4.188 SECTION E-E
60
S2 H16
100
L=3.150 N=30 SCALE 1:50
C7 H22 6.232 36 224.352 ADD 6%
40
A=1.750 B=700
A
B
A=325 B=3.041 C=3.115
SUB TOTAL 1,484.680 2.990 4.439 4.705
SECTION F-F
C6 H32 S1 H16 3.150 30 94.500 ADD 3%
L=9.847 N=11 SCALE 1:50
A=325 B=3.041 C=3.115 S2 " 3.150 30 94.500
S3 " 2.400 68 163.200
A C1 H32 L=9.370 N=12 S4 " 2.400 68 163.200
A=7.613 B=878 C=878 REBAR DETAIL
SUB TOTAL 515.400 1.580 0.814 0.838
C
B
B
A=1.054~984 B=2.104~1.070 C=510 A=7.613 B=878 C=878 P1 H20 L=1.284 N=15
A=1.880~687 A
C8 H22 L=7.466 N=52 C4 H32 L=7.967 N=11
A=1.504~984 B=2.204 C=510 A=7.733 B=117 C=117 P2 H20 P3 H20
L=1.284 N=15 L=7.646 N=1
A=1.880~687 A=2.953 B=100 J=670x2
C9 H22 L=6.232 N=36
A=1.054~984 B=2.104~1.070 C=510 A
B
R R
A D
D
C C
B
C10 H22
MATERIAL QUANTITIES
L=16.726 N=20
(GRADE 60) (PER PIER)
A=8.022~4.136 B=1.019 C=510 J=510x1
TOTAL UNIT TOTAL
NO. DIA LENGTH Q'TY REMARKS
LENGTH WEIGHT WEIGHT
C11 H22 L=21.693 N=8
A=8.447~8.147 B=1.019 C=510 J=510x2 P1 H20 1.284 15 19.260 ADD 3%
P2 " 1.284 15 19.260
P3 " 7.646 1 7.646
P4 " 1.336 2 2.672
SUB TOTAL 48.838 2.470 0.121 0.125
TOTAL 0.121 0.125
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-027
KEON YONG KIM OF TUBOD, LANAO DEL NORTE REINFORCEMENT DETAIL MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
PROJECT MANAGER NKG JV OF PIER CAP(2/2) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
H4
2,500 CA PA PB PC
(Column Section A) (Pile Section A) (Pile Section B) (Pile Section C)
INNER HOOP 250 R2 R1 150
(SPACER)
SEA Bed
(EL. D)
H.W.L 0.94 m
DETAIL "A"
A B P1 S36 P2-1 S25 C P2 S25 D E
270
1,500
CL OF PILE
1,330
6,000
3,200
3,000
1,330
1,500
270
1,000
A B C D E
HOOP BAR 250 S4 S3 S2 S1 300
H4
FRONT VIEW
SCALE 1:50
(WELDING)
DIVISION H4 CA PA PB PC R1 R2 S1 S2 S3 S4
150 500
P1 Type-1 52.149 0.649 3.940 9.060 36.000 33@1.500=49.500 2.249 94@300=28.200 214@100=21.400 7@150=1.050 0.949 T2 H25
20EA
P2 Type-1 54.887 1.387 3.940 9.760 37.300 35@1.500=52.500 1.987 99@300=29.700 228@100=22.800 7@150=1.050 0.787
P3 Type-1 54.625 2.125 4.040 10.060 35.900 35@1.500=52.500 1.725 94@300=28.200 240@100=24.000 7@150=1.050 0.825
P4 Type-1 55.363 2.863 4.140 10.060 35.800 35@1.500=52.500 2.463 94@300=28.200 248@100=24.800 7@150=1.050 0.763
P1 S36
P5 Type-1 56.101 3.601 4.140 11.660 34.200 36@1.500=54.000 1.701 88@300=26.400 272@100=27.200 7@150=1.050 0.901 MAIN BAR
500
500
151
WELDING
(4MM)
T1 H25
(T=20MM)
50
S=NONE
S
250
R
1.500 NOTES
50
50
SPACER DETAIL DETAIL OF CONNECTING BAR BY WORKING DESIGN SO PILE LENGTH CAN BE
S=NONE S=NONE CHANGED WHEN THE PILE LOADING TEST CONDUCTED.
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-028
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (1/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
SPACER SPACER
@1500 @1500
170
170
P2-1 S25 S1 H16 P2-1 S25 S1 H16
30 EA @100 30 EA @100
1,330
1,330
3,000
3,000
1,330
1,330
R1 H25 R1 H25
@1500 @1500
P2 S25 P2 S25
P1 S36 P1 S36
30 EA 30 EA
60 EA 60 EA
170
170
SECTION A-A SECTION B-B
SCALE 1:25 SCALE 1:25
P2 S25
SPACER SPACER
30 EA
@1500 @1500
170
170
170
R1 H25 R1 H25
P2-1 S25 S1 H16
@1500 @1500
30 EA @100
1,330
1,330
1,330
S1 H16
@300
S1 H16
@300
3,000
3,000
3,000
T1 H25
1,330
1,330
1,330
P1 S36
R1 H25
60 EA
@1500
P2 S25 P2 S25
P1 S36 P1 S36
30 EA 30 EA
60 EA 60 EA
170
170
170
T1 H25
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-029
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (2/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
2,500 CA PA PB PC
(Column Section A) (Pile Section A) (Pile Section B) (Pile Section C)
INNER HOOP 250 R2 R1 150
(SPACER)
SEA Bed
(EL. D)
H.W.L 0.94 m
DETAIL "A"
A P21 S25 B P1 S36 C P2-1 S36 P3 S36 D E P2 S36 F G
270
330
1,500
CL OF PILE
6,000
1,000
1,040 2,000
3,200
3,000
1,000
1,500
330
270
1,000
A B C D E F G
HOOP BAR 250 S4 S3 S2 S1 300
H4
FRONT VIEW
DIMENSIONAL TABLE SCALE 1:50
DIVISION 60 (OUT SIDE)
P6 Type-2 56.839 4.339 4.240 12.560 33.200 36@1.500=54.000 2.439 85@300=25.500 273@100=27.300 18@150=2.700 0.789
170
P7 Type-2 57.577 5.077 4.440 13.560 32.000 37@1.500=55.500 1.677 81@300=24.300 285@100=28.500 23@150=3.450 0.777
P8 Type-2 58.315 5.815 4.840 14.760 30.400 37@1.500=55.500 2.415 76@300=22.800 301@100=30.100 28@150=4.200 0.665
1,330
P9 Type-2 60.053 6.553 5.240 16.060 29.700 39@1.500=58.500 1.153 73@300=21.900 318@100=31.800 33@150=4.950 0.853
P10 Type-2 69.791 7.291 5.740 15.560 38.700 45@1.500=67.500 1.891 103@300=30.900 318@100=31.800 37@150=5.550 0.991
S1 H16
S2 H16
3,000
P11 Type-2 62.529 8.029 6.440 15.760 29.800 40@1.500=60.000 2.129 74@300=32.700 327@100=32.700 42@150=6.300 0.779 @150
C.T.C 150
P15 Type-2 69.481 10.981 10.540 16.560 28.900 45@1.500=67.500 1.581 71@300=21.300 376@100=37.600 62@150=9.300 0.731
P21 S25
P16 Type-2 71.219 11.719 11.640 17.560 27.800 46@1.500=69.000 1.819 67@300=20.100 397@100=39.700 67@150=10.050 0.819 30 EA
1,330
P1 S36
S3 H16
60 EA
P1 S36 @150
170
MAIN BAR
(WELDING)
151
150 500
T2 H25
20EA
STEEL CASING COUPLER FOR REBARS LONGITUDINAL BARS SECTION A-A
50
P1 S36
S
MAIN BAR
250
R
1.500 NOTES
50
500
500
50
SPACER DETAIL DETAIL OF CONNECTING BAR * TOTAL WELDING LENGTH : L=40.0M PER PILE BY WORKING DESIGN SO PILE LENGTH CAN BE
S=NONE S=NONE CHANGED WHEN THE PILE LOADING TEST CONDUCTED.
DETAIL "A"
S=NONE
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-030
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (3/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
SPACER SPACER
@1500 @1500
170
170
170
P2-1 S36 P2-1 S36
30 EA R1 H25 30 EA
1,330
1,330
1,330
S1 H16 @1500 S1 H16
@100 @100
S1 H16
S2 H16
3,000
3,000
3,000
@100
C.T.C 100
P21 S25
30 EA P3 S36
1,330
1,330
1,330
60 EA
P2 S36 P2 S36
P1 S36 P1 S36
P1 S36 30 EA 30 EA
S3 H16 60 EA 60 EA
60 EA
@100 R1 H25 R2 H25
170
170
170
@1500 @1500
P2 S36
SPACER SPACER
30 EA
@1500 @1500
170
170
170
130
P2-1 S36
R1 H25 30 EA R1 H25
1,330
1,330
6@400=2,400
3,000
3,000
3,000
T1 H25
P3 S36
1,330
1,330
60 EA
P2 S36 P2 S36
P1 S36 P1 S36 P1 S36
30 EA 30 EA
60 EA 60 EA 60 EA
130
R2 H25
170
170
170
@1500
T1 H25
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-031
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (4/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
2,500 CA PA PB PC
(Column Section A) (Pile Section A) (Pile Section B) (Pile Section C)
INNER HOOP 250 R2 R1 150
(SPACER)
SEA Bed
(EL. D)
H.W.L 0.94 m
DETAIL "A"
A P21 S25 B P1 S36 C P2-1 S36 P3 S36 D E P4 S36 P2 S36 F G
270
330
1,500
CL OF PILE
6,000
1,000
1,040 2,000
3,200
3,000
1,000
1,500
330
270
1,000
A B C D E F G
HOOP BAR 250 S4 S3 S2 S1 300
H4
FRONT VIEW
SCALE 1:50
DIVISION 60 (OUT SIDE)
DIMENSIONAL TABLE DIVISION 30 (IN SIDE)
DIVISION H4 CA PA PB PC R1 R2 S1 S2 S3 S4
170
P12 Type-2 64.267 8.767 7.740 14.560 30.700 41@1.500=61.500 2.367 77@300=23.100 328@100=32.800 47@150=7.050 0.767
P13 Type-2 66.005 9.505 8.540 15.960 29.500 43@1.500=64.500 1.105 73@300=21.900 350@100=35.000 52@150=7.800 0.755
1,330
P14 Type-2 67.743 10.243 9.440 14.560 31.000 44@1.500=66.000 1.343 78@300=23.400 345@100=34.500 57@150=8.550 0.743
S1 H16
S2 H16
3,000
@150
C.T.C 150
P21 S25
30 EA
1,330
P1 S36
S3 H16
60 EA
P1 S36 @150
170
MAIN BAR
(WELDING)
151
150 500
T2 H25
20EA
STEEL CASING COUPLER FOR REBARS LONGITUDINAL BARS SECTION A-A
50
P1 S36
S
MAIN BAR
250
R
1.500 NOTES
50
500
500
50
SPACER DETAIL DETAIL OF CONNECTING BAR * TOTAL WELDING LENGTH : L=40.0M PER PILE BY WORKING DESIGN SO PILE LENGTH CAN BE
S=NONE S=NONE CHANGED WHEN THE PILE LOADING TEST CONDUCTED.
DETAIL "A"
S=NONE
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-032
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (5/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
SPACER SPACER
@1500 @1500
R1 H26
170
170
170
R1 H26
@1500
@1500
1,330
1,330
S1 H16 S1 H16
@100 P4 S36 @100
60 EA
S1 H16
S2 H16
3,000
3,000
3,000
@100
C.T.C 100
P21 S25
30 EA P3 S36
1,330
1,330
1,330
P3 S36 60 EA
60 EA
P2 S36 P2 S36
P1 S36 P1 S36
P1 S36 30 EA 30 EA
S3 H16 60 EA 60 EA
60 EA
@100 R2 H26 R2 H26
170
170
170
@1500 @1500
P2 S36
SPACER SPACER 30 EA
@1500 @1500
R1 H25
170
170
170
R1 H25
@1500
130
@1500
P2-1 S36
30 EA
1,330
1,330
6@400=2,400
3,000
3,000
3,000
T1 H25
P3 S36
1,330
1,330
60 EA
P2 S36 P2 S36
P1 S36 P1 S36 P1 S36
30 EA 30 EA
60 EA 60 EA 60 EA
130
R2 H25
170
170
170
@1500
T1 H25
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-033
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (6/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
L L
b
COUPLER COUPLER
a a
P1 S36 L=51.749 N=60 S1 H16 L=9.817 N=376 P1 S36 L=54.487 N=60 S1 H16 L=9.817 N=335
COUPLER=480 a=8.577 b=300 j=640X1 COUPLER=540 a=8.577 b=300 j=640X1
a a
c
b
b
r r r r
a b a
b
a a
T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20 T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20
a=1.228~2.696 b=500 a=276 b=157 c=550 r=100 a=1.228~2.696 b=500 a=276 b=157 c=550 r=100
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-034
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (7/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
L L
b
COUPLER COUPLER
a a
P1 S36 L=54.225 N=60 S1 H16 L=9.817 N=342 P1 S36 L=54.963 N=60 S1 H16 L=9.817 N=350
COUPLER=540 a=8.577 b=300 j=640X1 COUPLER=540 a=8.577 b=300 j=640X1
a a
c
b
b
r r r r
a b a
b
a a
T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20 T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20
a=1.228~2.696 b=500 a=276 b=157 c=550 r=100 a=1.228~2.696 b=500 a=276 b=157 c=550 r=100
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-035
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (8/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
REBAR DETAIL
BORED PILE DETAIL (9/14)
REBAR DETAIL SCALE 1:50 j
j
L
j
b
L
b
COUPLER
a
COUPLER
a
b
COUPLER=60 a
P2-1 S25 L=21.651 N=30
j
COUPLER=90 P3 S36 L=12.560 N=60
COUPLER=120
c
a
P21 S25 a r
L=8.589 N=30
COUPLER=30
d
R1 H25 e
L=9.093 N=36 f
a=8.093 j=1.000X1 P5 H16 L=7.624 N=50
a=6.142 b=300 j=640X1
c
b
c
r r
a b
a a r r
b
a
TOTAL UNIT
(GRADE 75) (PER PILE) ID BAR LENGTH(m) QUANTITY TOTAL REMARK
LENGTH WEIGHT
TOTAL UNIT
ID BAR LENGTH(m) QUANTITY LENGTH TOTAL REMARK P1 S36 56.439 60 3,386.340 ADD 6%
WEIGHT
P2 " 56.439 30 1693.170
P1 S36 55.701 60 3,342.060 ADD 6%
P2-1 " 17.840 30 535.200
SUB TOTAL 3,342.060 8.000 26.736 28.340
P3 " 12.560 60 753.600
P2 S25 55.701 30 1671.030 ADD 6%
SUB TOTAL 6,368.310 8.000 50.947 54.004
P2-1 S25 21.651 30 649.530
P21 S25 8.589 30 257.670 ADD 6%
SUB TOTAL 2,320.560 3.860 8.957 9.494
SUB TOTAL 257.670 3.860 0.995 1.055
TOTAL 35.693 37.834
COUPLER TOTAL 51.942 55.059
COUPLER
(PER PILE) P6 REBAR TOTAL TABLE
P5 REBAR TOTAL TABLE ID EA (GRADE 60) (PER PILE) (PER PILE)
(GRADE 60) (PER PILE) S36 540 EA ID EA
TOTAL UNIT
ID BAR LENGTH(m) QUANTITY LENGTH TOTAL REMARK
TOTAL UNIT S25 360 EA WEIGHT S36 990 EA
ID BAR LENGTH(m) QUANTITY TOTAL REMARK
LENGTH WEIGHT S25 30 EA
R1 H25 9.024 12 108.288 ADD 6%
R1 H25 9.093 36 327.348 ADD 6% R2 " 8.640 8 69.120
T1 " 2.962 14 41.468 T1 " 2.962 14 41.468
T2 " 1.690 20 33.800 T2 " 1.690 20 33.800
SUB TOTAL 402.616 3.860 1.554 1.647 SUB TOTAL 252.676 3.860 0.975 1.034
S1 H16 9.817 368 3,612.656 ADD 3% P5 H16 7.624 50 381.200 ADD 3%
SUB TOTAL 3,612.656 1.580 5.708 5.879 S1 " 9.817 435 4,270.395
TOTAL 7.262 7.526 S3 " 1.669 1500 2,503.500
SUB TOTAL 7,155.095 1.580 11.305 11.644
TOTAL 12.280 12.678
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-036
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (9/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
REBAR DETAIL REBAR DETAIL
BORED PILE DETAIL (10/14)
j SCALE 1:50 j
L L
j j
b
COUPLER COUPLER
a a
a a
P1 S36 L=57.177 N=60 S1 H16 L=9.817 N=377 R1 H25 L=9.024 N=12 P1 S36 L=57.915 N=60 S1 H16 L=9.817 N=406 R1 H25 L=9.024 N=13
COUPLER=540 a=8.577 b=300 j=640X1 a=8.024 j=1.000X1 COUPLER=540 a=8.577 b=300 j=640X1 a=8.024 j=1.000X1
P2 S36 L=57.177 N=30 R2 H25 L=8.640 N=9 P2 S36 L=57.915 N=30 R2 H25 L=8.640 N=9
j j
COUPLER=270 a=7.640 j=1.000X1 COUPLER=270 a=7.640 j=1.000X1
b
COUPLER=90 a COUPLER=90 a
b
c
c
P21 S25 a r P21 S25 a r
L=9.327 N=30 L=10.065 N=30
COUPLER=30 COUPLER=30
d
e e
f f
S2 H16 L=7.624 N=54 S2 H16 L=7.624 N=60
a=6.384 b=300 j=640X1 a=6.384 b=300 j=640X1
b
c
c
a r r a r r
b
b
a a
T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20 T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20
a=1.228~2.696 b=500 a=276 b=157 c=550 r=100 a=1.228~2.696 b=500 a=276 b=157 c=550 r=100
COUPLER COUPLER
P7 REBAR TOTAL TABLE P8 REBAR TOTAL TABLE
(GRADE 60) (PER PILE) (PER PILE) (GRADE 60) (PER PILE) (PER PILE)
ID EA ID EA
TOTAL UNIT TOTAL UNIT
ID BAR LENGTH(m) QUANTITY LENGTH TOTAL REMARK ID BAR LENGTH(m) QUANTITY LENGTH TOTAL REMARK
WEIGHT S36 1,020 EA WEIGHT S36 1,020 EA
R1 H25 9.024 12 108.288 ADD 6% S25 30 EA R1 H25 9.024 13 117.312 ADD 6% S25 30 EA
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-037
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (10/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
REBAR DETAIL REBAR DETAIL
BORED PILE DETAIL (11/14)
j SCALE 1:50 j
L L
j j
b
COUPLER COUPLER
a a
a a
P1 S36 L=59.653 N=60 S1 H16 L=9.817 N=425 R1 H25 L=9.024 N=14 P1 S36 L=69.391 N=60 S1 H16 L=9.817 N=459 R1 H25 L=9.024 N=14
COUPLER=540 a=8.577 b=300 j=640X1 a=8.024 j=1.000X1 COUPLER=660 a=8.577 b=300 j=640X1 a=8.024 j=1.000X1
P2 S36 L=59.653 N=30 R2 H25 L=8.640 N=10 P2 S36 L=69.391 N=30 R2 H25 L=8.640 N=10
j j
COUPLER=270 a=7.640 j=1.000X1 COUPLER=330 a=7.640 j=1.000X1
b
COUPLER=90 a COUPLER=90 a
b
c
c
P21 S25 a r P21 S25 a r
L=8.303 N=30 L=11.541 N=30
COUPLER=30 COUPLER=30
d
e e
f f
S2 H16 L=7.624 N=30 S2 H16 L=7.624 N=67
a=6.384 b=300 j=640X1 a=6.384 b=300 j=640X1
b
c
c
a r r a r r
b
b
a a
T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20 T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20
a=1.228~2.696 b=500 a=276 b=157 c=550 r=100 a=1.228~2.696 b=500 a=276 b=157 c=550 r=100
COUPLER COUPLER
P9 REBAR TOTAL TABLE P10 REBAR TOTAL TABLE
(GRADE 60) (PER PILE) (PER PILE) (GRADE 60) (PER PILE) (PER PILE)
ID EA ID EA
TOTAL UNIT TOTAL UNIT
ID BAR LENGTH(m) QUANTITY LENGTH TOTAL REMARK ID BAR LENGTH(m) QUANTITY LENGTH TOTAL REMARK
WEIGHT S36 1,020 EA WEIGHT S36 1,200 EA
R1 H25 9.024 14 126.336 ADD 6% S25 30 EA R1 H25 9.024 14 126.336 ADD 6% S25 30 EA
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-038
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (11/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
REBAR DETAIL REBAR DETAIL
BORED PILE DETAIL (12/14)
j SCALE 1:50 j
L L
j j
b
COUPLER COUPLER
a a
a a
P1 S36 L=62.129 N=60 S1 H16 L=9.817 N=444 R1 H25 L=9.024 N=14 P1 S36 L=63.867 N=60 S1 H16 L=9.817 N=453 R1 H25 L=9.024 N=35
COUPLER=600 a=8.577 b=300 j=640X1 a=8.024 j=1.000X1 COUPLER=600 a=8.577 b=300 j=640X1 a=8.024 j=1.000X1
P2 S36 L=62.129 N=30 R2 H25 L=8.640 N=10 P2 S36 L=63.867 N=30 R2 H25 L=8.414 N=9
j j
COUPLER=300 a=7.640 j=1.000X1 COUPLER=300 a=7.414 j=1.000X1
b
COUPLER=90 a COUPLER=90 a
b
c
c
P21 S25 a r P4 S36 a r
L=12.279 N=30 L=14.560 N=60
COUPLER=60 COUPLER=120
d
e e
f f
S2 H16 L=7.624 N=74 P21 S25 L=13.017 N=30 S2 H16 L=7.624 N=79
a=6.384 b=300 j=640X1 COUPLER=60 a=6.384 b=300 j=640X1
b
c
c
a r r a r r
b
b
a a
T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20 T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20
a=1.228~2.696 b=500 a=276 b=157 c=550 r=100 a=1.228~2.696 b=500 a=276 b=157 c=550 r=100
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-039
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (12/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
REBAR DETAIL REBAR DETAIL
BORED PILE DETAIL (13/14)
j SCALE 1:50 j
L L
j j
b
COUPLER COUPLER
a a
a a
P1 S36 L=65.605 N=60 S1 H16 L=9.817 N=476 R1 H25 L=9.024 N=36 P1 S36 L=67.343 N=60 S1 H16 L=9.817 N=481 R1 H25 L=9.024 N=36
COUPLER=600 a=8.577 b=300 j=640X1 a=8.024 j=1.000X1 COUPLER=660 a=8.577 b=300 j=640X1 a=8.024 j=1.000X1
P2 S36 L=65.605 N=30 R2 H25 L=8.414 N=10 P2 S36 L=67.343 N=30 R2 H25 L=8.414 N=9
j j
COUPLER=300 a=7.414 j=1.000X1 COUPLER=330 a=7.414 j=1.000X1
b
COUPLER=120 a COUPLER=120 a
b
c
c
P4 S36 a r P4 S36 a r
L=15.960 N=60 L=14.560 N=60
COUPLER=120 COUPLER=120
d
e e
f f
P21 S25 L=13.755 N=30 S2 H16 L=7.624 N=84 P21 S25 L=14.493 N=30 S2 H16 L=7.624 N=89
COUPLER=60 a=6.384 b=300 j=640X1 COUPLER=60 a=6.384 b=300 j=640X1
b
c
c
a r r a r r
b
b
a a
T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20 T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20
a=1.228~2.696 b=500 a=276 b=157 c=550 r=100 a=1.228~2.696 b=500 a=276 b=157 c=550 r=100
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-040
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (13/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE:
Concrete : Grade 40(fck=40MPa)
Rebar : ASTM A615/A615M H:Grade 60[415], S:Grade 75[520]
REBAR DETAIL REBAR DETAIL
BORED PILE DETAIL (14/14)
j SCALE 1:50 j
L L
j j
b
COUPLER COUPLER
a a
a a
P1 S36 L=69.081 N=60 S1 H16 L=9.817 N=510 R1 H25 L=9.024 N=37 P1 S36 L=70.819 N=60 S1 H16 L=9.817 N=532 R1 H25 L=9.024 N=38
COUPLER=660 a=8.577 b=300 j=640X1 a=8.024 j=1.000X1 COUPLER=660 a=8.577 b=300 j=640X1 a=8.024 j=1.000X1
P2 S36 L=69.081 N=30 R2 H25 L=8.640 N=11 P2 S36 L=70.819 N=30 R2 H25 L=8.640 N=11
j j
COUPLER=330 a=7.640 j=1.000X1 COUPLER=330 a=7.640 j=1.000X1
b
COUPLER=120 a COUPLER=150 a
b
c
c
P21 S25 a r P21 S25 a r
L=15.231 N=30 L=15.969 N=30
COUPLER=60 COUPLER=30
d
e e
f f
S2 H16 L=7.624 N=94 S2 H16 L=7.624 N=98
a=6.384 b=300 j=640X1 a=6.384 b=300 j=640X1
b
c
c
a r r a r r
b
b
a a
T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20 T1 H25 L=2.962 N=14 T2 H25 L=1.690 N=20
a=1.228~2.696 b=500 a=276 b=157 c=550 r=100 a=1.228~2.696 b=500 a=276 b=157 c=550 r=100
COUPLER COUPLER
P15 REBAR TOTAL TABLE P16 REBAR TOTAL TABLE
(GRADE 60) (PER PILE) (PER PILE) (GRADE 60) (PER PILE) (PER PILE)
ID EA ID EA
TOTAL UNIT TOTAL UNIT
ID BAR LENGTH(m) QUANTITY LENGTH TOTAL REMARK ID BAR LENGTH(m) QUANTITY LENGTH TOTAL REMARK
WEIGHT S36 1,230 EA WEIGHT S36 1,260 EA
R1 H25 9.024 37 333.888 ADD 6% S25 60 EA R1 H25 9.024 38 342.912 ADD 6% S25 60 EA
PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
LEE SANG HUN
DESIGN MANAGER PACKAGE2 - PART1 REPUBLIC OF THE PHILIPPINES
DESIGN - BUILD FOR THE CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OF PANGUIL BAY BRIDGE PROJECT TANGUB
SUBMITTED: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UNIFIED PROJECT TERESITA V. BAUZON BLESILDA S. RAMOS SHARIF MADSMO H. HASIM ARISTARCO M. DOROY MAXIMO L. CARVAJAL
CITY, MISAMIS OCCIDENTAL – MUNICIPALITY 00-041
KEON YONG KIM OF TUBOD, LANAO DEL NORTE BORED PILE DETAIL (14/14) MANAGEMENT OFFICE (UPMO)
PROJECT MANAGER OIC CHIEF, BRIDGES DIVISION, BUREAU OF DESIGN PROJECT DIRECTOR OFFICER-IN-CHARGE, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO TECHNICAL SERVICES TECHNICAL SERVICES
PROJECT MANAGER NKG JV
DATE: DATE: DATE: DATE: DATE: DATE: