You are on page 1of 2

ARCADIA SHIPMANAGEMENT Co. LTD Form No.

366

INCINERATOR TRAINING & FAMILIARIZATION RECORD

Vessel: MT AEGEAN MYTH

Seafarer’
s GOYO GENARO Rank: 3RD ENGINEER
Name:

TRAINING, FAMILIARIZATION AND BRIEF DESCRIPTION CHECK


Safety precautions of Incinerator OK
System preparation OK
Auto-running process OK
Manual running process (in case Auto-running sequence does not respond as per
OK
maker)
Interlock system OK
Sludge Line cleaning OK
Stopping process (Normal Auto-Stopping and Emergency Stop) OK
Differences in the Incinerator operation in:
 Sludge Incineration; and OK
 Garbage Incineration
Limitations to the liquid and solid material that can be incinerated, according to Makers
and MARPOL/Annex-VI, Appendix-IV, para.1 for a typical Sludge Oil and Solid Waste OK
typical composition
Temperature controller – Furnace operating temperature limitations, as per MARPOL
OK
Annex-VI, Appendix-IV, para.2 requirements
Location of Manufacturer’s Incinerator Operating Manual, as per MARPOL/Annex-VI,
OK
Regulation 16.7
General provisions of MARPOL/Annex-VI Regulation 16, including amendments
adopted by Resolutions MEPC.271(69) and MEPC.278(70), related with shipboard OK
incineration.

Date Completed:

Trainer's name (Chief Engineer): Signature:

KARAGIANNIS ALEXANDROS

I was dully informed, trained and familiarized of the equipment’s operation and
restrictions by the above Trainer:
Trainee’s name (handwritten): Signature:

Revision: 01 page 1 of 2 Revised: 01.03.2018


ARCADIA SHIPMANAGEMENT Co. LTD Form No.366
Upon joining the vessel, all Engineers responsible for operation of Incinerator equipment to be
trained by ship’s Chief Engineer on the operation and use of incinerator.

Revision: 01 page 2 of 2 Revised: 01.03.2018

You might also like