Task: Working at height Hazard Identification and Risk Assessment Date: 16/04/2020
ID: Site / HIRA No.: HIL-HIRA- 03 Rev. No.:
HIRA Team: Bidit Mahanta , Sandeep Kumar
Residual
Hazard Risk Assessment on
Risk
/NonRoutine(NR)
Administrative Contols
Engineering Comtrols
Legal (Yes/No)
Emergency , E
Routine(R)
Risk Level
Risk Level
Substituition
Elimination
Liklihood
Liklihood
Severity
Severity
No. Activity Sub activity OH/SH Existing Controls Proposed Controls Residual Risk Action By
PPE
Situation/ Source/Act Consequence
2 PTW's for the activity Sufficient things to be R Yes All the erection procedure to be display
mentioned on the PTW in the permit
In adequate information on All the erection procedure to be Breif discussion of PTW among
PTW failure SH display in the permit 1 4 Medium NA NA NA Yes NA workmen before start the job. 1 2 Low Acceptable risk Site engineer
PTW
Breif discussion of PTW among
workmen before start the job.
3 Sufficient PPE's has to be used R No
Insufficient PPE's Body Injury SH PPE’s stock to be maintain 2 3 Medium NA NA NA Yes Yes 1 2 Low Acceptable risk Site engineer
Height work
11 Fall of material from height Serious injury Area barricaded done. Use safety net.
Death No person shall work under the Training to workmen.
Property damage SH suspension load. R No 3 4 High NA NA Yes Yes NA Continue Supervision. 2 2 Low Acceptable risk Site engineer
Proper housekeeping to be
ensured.
12 Hitting the object Physical injury Ensure No unwanted material Training to workmen.
slip/trip kept in working area. Continue supervision.
SH Use proper PPE's. R No 4 3 High NA NA NA NA Yes 2 2 Low Acceptable risk Site engineer
Maintain safe distance from
structure