Greater Nile Petroleum Operating Co.

SECTION: III n
MT/ELM/WI/F16
ANNUAL ELECTRICAL SAFETY REV: 00 GREATER NILE PETROLEUM

ASSESSMENT (EVERY DECEMBER)

STATION: EQUIPMENT:

LOCATION: TYPE/SL. NO.

PLANNED EXECUTION MONTH: RUNNING HRS.


MONTH:
REASONS FOR DELAY (IF ANY):

Sl. Equipment Component Temp. Ref. Temp. Temp. after


No. Measured in Phase Temp Rise rectification
R Y B N
1 Panel side
Equipment side
Panel side
Equipment side
Panel side
Equipment side
Panel side
Equipment side
Panel side
Equipment side
Panel side
Equipment side
Panel side
Equipment side

NOTE: (1) Instruments to be used for carrying out the survey may be either
Non-contact Infra-red gun or Thermography Camera.
(2) If variation in temperature between terminals are more than 5 degrees
Celsius, action for rectification to be taken.
(3) The survey to be carried out before on-set of peak summer every year.
(4) If load unbalance is result of unequal temperature rise, same may be
corrected as far as possible
(5) To establish the correct data, the readings to be taken after running of the
equipments for a minimum period of 15 mins. on full load.
(6) For taking the temperature reading, all the terminals, both at motor side
and feeder side is to be exposed.
(7) Reference temperature indicates the equipment body temperature
Remarks:

DEVELOPED BY INDIAN OIL 31501


Greater Nile Petroleum Operating Co.
SECTION: III n
MT/ELM/WI/F16
ANNUAL ELECTRICAL SAFETY REV: 00 GREATER NILE PETROLEUM

ASSESSMENT (EVERY DECEMBER)

WORK CARRIED OUT BY

NAME: DESIGNATION SIGNATURE


1. Name:
2. Design.
3. Counter signed:
4. Name:
design:
DISTRIBUTION: 01) Station 02) Maintenance Department, Khartoum