You are on page 1of 1

PROJECT: PROJECT NAME SITE

NO.:

COMMISSIONING CHECK SHEET FOR AIR DISTRIBUTION SYSTEM Sheet No.

SUBCONTRACTOR:

EQUIPMENT NO. : SEQUENCE NO. :


SERIAL NO. : DATE :
LOCATION : COMMISSIONED ON :

Checked
ITEM POINTS TO BE CHECKED by REMARKS
1 Clean all air intake areas, air conditioned areas.
2 Clean all AHUs, FCUs and fans.
3 Open all outlets.
4 Seal all unwanted openings in air path.
5 Check for free rotation of impeller.
6 Set overload protection correctly.
7 Check for tightness of electrical connections.
8 Ensure installation of filters in all units.
9 Clean filters.
10 Check belt tension and lubrication.
11 Start fans.
12 Balance air as per design.

THE ABOVE POINTS HAVE BEEN CHECKED AND FOUND TO COMPLY WITH
CONTRACT SPECIFICATIONS.

CHECKED BY SUBCONTRACTOR: _____________________


Signature

WITNESSED BY CLIENT: ______________________


Signature

WITNESSED / ACCEPTED BY CONSULTANT: ____________________


Signature