MAIN DWG/SPEC
RFC DATE DATE DATE DAYS
DISCIPLIN REFERENC SUBJECT / ISSUE / RESPONSES / ATTACHMENTS BIC
NO. SUBM DUE CLOSED OUT
E E
M dwgs &
Subject: Hot Water System & Boiler
1 HVAC 50% DD MEP 4/28/20 5/5/20 4/28/20 0 ME
Narrative
Issue:
progress set It appears there is no longer a Boiler system on the DD set of drawings. Please confirm or
4/24/20 advise.
Response: 4/28/20 Ed Bosco (ME) We are trying to move ahead without the boiler
room. We may need to do some local supplemental heat at locations that can’t be
addressed by heat pumps but we are assuming we can do this with electric heat which
would consistent with the Columbia request to shift towards electric for the HVAC
systems.
Attachments:
Response: 4/28/20 Ed Bosco (ME) Trying to avoid the need for a generator as well.
Assume local battery packs for lighting and a powered recall system for the elevator
as an accessory in the elevator package.
Attachments:
Response: [MEE] - See the data plan for room location. it is intended to pu the
dedicated it room fcu on the main vrf system.
Attachments:
Page 1 of 4
Columbia University Tennis Facility
RFC LOG 575 West 218th St
SORT: OPEN NY, NY 10034
DATE: June 10, 2020 Plaza Job No. DA20-002
MAIN DWG/SPEC
RFC DATE DATE DATE DAYS
DISCIPLIN REFERENC SUBJECT / ISSUE / RESPONSES / ATTACHMENTS BIC
NO. SUBM DUE CLOSED OUT
E E
FP dwgs &
Subject: Fire Pump
8 Fire Protection 50% DD MEP 4/30/20 5/7/20 5/8/20 6 ME
Narrative
Issue: There is no mention of a fire pump nor is it shown on the progress set. Please
progress set
confirm whether this is required.
4/24/20
Response: [MEE] - None is anticipated at this time
Attachments:
TT: Please see attached PDF ("2020-05-07 CU Tennis Steel Quantities.pdf") with
updated quantities reflecting development of the structural design since 100%SD, as
shown in the 4/24 progress drawing set.
For purposes of evaluating member sizes and pick weights, the typical W30, W33, and
W36 long span infill beams at the roof are between 100 and 130 lbs per foot, and the
plate girders at the roof are approximately 400 lbs per foot. Column sizes range from
W14x61 to W14X90 in the clubhouse area, W14x132 to W14x176 around the
perimeter of the tennis area, and boxed W14's with 1"x16" side plates weighing
approximately 250 lbs/ft for the central 5 full-height unbraced columns along grid D.
Girts for intermediate support of the facade panels are typically HSS14X6 or
HSS14X10 with long side horizontal, with typical weights of 30-40 lbs/ft, with limited
heavier sections at the longest end spans. L3X3 or similar hanger elements at mid-
span will be used to limit sag of the girt sections over the 50' to 60' spans between
columns.
As shown on bracing elevations in the 4/24 set, vertical bracing in most cases is double
angle bracing to simplify fabrication and connections of brace connections, with use of
HSS bracing limited to longer unbraced lengths and architecturally exposed bracing
within the tennis spaces.
Complete size information for all beams, girts, columns, and braces will be provided
with the 100% Design Development deliverable.
Attachments:
2020-05-07 CU Tennis Steel Quantities.pdf
Civil Dwg. Subject: Conflict with Plumbing Dwgs and Civil Utility Dwgs
10 Plumbing 4/30/20 5/7/20 5/8/20 6 ME
C02-00 & P-
Page 2 of 4
Columbia University Tennis Facility
RFC LOG 575 West 218th St
SORT: OPEN NY, NY 10034
DATE: June 10, 2020 Plaza Job No. DA20-002
MAIN DWG/SPEC
RFC DATE DATE DATE DAYS
DISCIPLIN REFERENC SUBJECT / ISSUE / RESPONSES / ATTACHMENTS BIC
NO. SUBM DUE CLOSED OUT
E E
PW: Decoturf Deco Cushion system (or comparable product) is intended for both
indoor and outdoor court surfaces.
See info below for Oval Tennis as provided by Erich Ely at CU:
I had spoken to them about similar courts indoors and a long lasting cushioned
surface on the roof. They had referred me to Tom Magner of Calfornia Sports
Attachments:
Page 3 of 4
Columbia University Tennis Facility
RFC LOG 575 West 218th St
SORT: OPEN NY, NY 10034
DATE: June 10, 2020 Plaza Job No. DA20-002
MAIN DWG/SPEC
RFC DATE DATE DATE DAYS
DISCIPLIN REFERENC SUBJECT / ISSUE / RESPONSES / ATTACHMENTS BIC
NO. SUBM DUE CLOSED OUT
E E
Issue: Mechanical drawing schedules have a list of "General Notes" and "Remark Notes" of
which only B,1 are noted in the schedule in the VRF Air Conditioner Schedule. Pls
confirm that none of the other notes apply or advise. Our attention was drawn to Remark
progress set
Notes D (M-010) and F (M-011) which indicate emergency power to the FCUs and fans,
4/24/20
respectively. Per your response to RFC #2 is emergency power not required. Also pls
clarify reference to a humidifier (Remark Note J in the VRF Schedule). If these are
required, what is the extent.
Attachments: