Professional Documents
Culture Documents
0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 1 of 25
Document Author
Robin Cairns
(CQV Engineer)
Approved by Safety
Borislav Vulic
Representative (Lonza)
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 1 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 2 of 25
The purpose of this task is the livening of the Module U systems 818-U080 DH3 Generator , 818-U081 DH3 Distribution and 818-U091 HVAC Steam (DH3)
Distribution-
Completed Date
Pre-Requisites Signature
YES or N/A DD.MMM.YYYY
Utilities available: 818-U080 DH3 Generator, 818-U081 DH3
Distribution, 818-U091 HVAC Steam (DH3) Distribution, 818-
1. U020 Instrument Air Distribution, 818-U174 WBU Generation,
818-U233 MKWP Distribution, 818-U101 Steam (D8) Distribution, Yes
818-U116 Steam Condensate (DK) Collection, 818-U201 Wan
Sumps Tanks, 818-U115 Steam Condensate (DK) Collection
Tank
2.
Safety Walkdown completed Yes
3.
PSSR check list complete Yes
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 2 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 3 of 25
Completed Date
Pre-Requisites Signature
YES or N/A DD.MMM.YYYY
5.
HAZOP actions complete to enable system energization Yes
8.
Marked up scope of activity on P&ID completed Yes
9.
Preparations made for confined space entry N/A
10.
TCR approved N/A
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 3 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 4 of 25
PID - 818-U081-CQL-001 LV1-105323 Blatt 081 DH3 Distribution, Status D, Version D, 06MAR2023
PID - 818-U091-CQL-001 LV1-105323 Blatt 091 HVAC Steams (DH3) Distribution, Status D, Version D, 31AUG2023
PID - 818-U101-CQL-001 LV1-105323 Blatt 101 Steam (D8) Distribution, Status D, Version D, 29MAY2023
PID - 818-U233-CQL-001 LV1-105324 Blatt 233 MKWP Process Cooling Water Distribution, Status D, Version D, 11MAY2023
PID - 818-U116-CQL-001 LV1-105323 Blatt 116 Steam Condensate (DK) Collection, Status D, Version D, 23JUN2023
PID - 818-U115-CQL-001 LV1-105323 Blatt 115 Steam Condensate (DK) Collection Tank, Status D, Version D2, 05JUL2023
Please See LOTOTO Plan Phase 1, Phase 2 an Phase 3 for specific details
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 4 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 5 of 25
The purpose of this task is the livening of the Module U Clean Utility systems 818-U080 DH3 Generation, 818-U081 DH3 Distribution and 818-U091 HVAC
Steam (DH3) Distribution.
The livening activities will be completed in several controlled phases across all applicable systems:
1. PHASE 1 : Livening of all Utilities in 818-U080 DH3 Generation Skid
2. PHASE 2 : Steam Generator Start-Up and Livening of the Steam Distribution (818-U081 DH3 Distribution)
3. Phase 3: Livening of Steam Distribution 818-U091 HVAC Steam (DH3) Distribution
Note: Applicable systems listed below:
818-U080 DH3 Generator
818-U081 DH3 Distribution
818-U091 HVAC Steam (DH3) Distribution
818-U020 Instrument Air Distribution
818-U174 WBU Generation, 818-U233 MKWP Distribution
818-U101 Steam (D8) Distribution
818-U116 Steam Condensate (DK) Collection
818-U201 Wan Sumps Tanks
818-U115 Steam Condensate (DK) Collection Tank
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 5 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 6 of 25
1.5 Requirements
1. Notify Lonza system owners of all systems listed prior to beginning this activity. 818-U080 DH3 Generator, 818-U081 DH3 Distribution, 818-U091
HVAC Steam (DH3) Distribution, 818-U020 Instrument Air Distribution, 818-U174 WBU Generation, 818-U233 MKWP Distribution, 818-U101 Steam
(D8) Distribution, 818-U116 Steam Condensate (DK) Collection, 818-U201 Wan Sumps Tanks, 818-U115 Steam Condensate (DK) Collection Tank
2. All operatives involved to have appropriate task-specific PPE.
3. Complete Scope of Systems involved in livening walked down under multidisciplinary teams completed and punch list produced.
4. System is already mechanically completed and category A punch list items are closed.
5. Evidence of Pressure testing of 818-U080, 818-U081, 818-U091 and 818-U115 Pressure test and Blowdown completion and compliance with full
certification available.
6. LOTOTO Plan for Living correctly Implemented across all applicable systems listed in section 1.4.
7. Lonza EMR are available to support remotely with any DeltaV issues during the start-up of the skid
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 6 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 7 of 25
1.7 Methodology
This Phase is the introduction of the utilities into the system boundary of steam generator 818-U080 DH3 Generator.
1. As a baseline activity before any livening activities. Verify that Correct signage, Barriers and insulation is in place.
2. Verify that the following Valves are locked closed 818-U101VH105, 818-U081VH103, 818-U081VH104, 818-U081VH106, 818-U233VH266, 818-
U233VH267, 818-U116VH113, 818-U115VH126, 818-U091VH108, 818-U091VH109, 818-U091VH110, 818-U091VH111, 818-U091VH106
3. Verify the valve positions of the are correct as listed below
a. Open Valves: 818-U080VH103, 818-U080VH104, 818-U080VH101, 818-U080VH102, 818-U080VH106, 818-U080VH109, 818-U115VH126,
818-U116VH112, 818-U081VH101, 818-U081VH105, 818-U081VH107, 818-U081VH109, 818-U091VH112, 818-U091VH115, 818-U091VH116,
818-U091VH117, , 818-U091VH102, 818-U091VH103
b. Closed Valves : 818-U081VH103, 818-U081VH104, 818-U081VH106, 818-U081VH110, 818-U081VH108 (For now, Valve will opened at a later
stage), 818-U091VH114, 818-U091VH113, 818-U091VH116 (For now, Valve will opened at a later stage), 818-U091VH104, 818-U091VH118
(For now, Valve will opened at a later stage), 818-U091VH119, 818-U091VH101, 818-U091VH111, 818-U091VH106, 818-U091VH110, 818-
U091VH109, 818-U091VH105
4. Liven MKWP supply and return lines into 818-U080 skid. Unlock MKWP Supply and Return valves 818-U233VH266 and 818-U233VH267. Crack open
818-U233VH266 valve, Verify that water pressure builds up on skid on Pressure indicator 818-U080PT2021. When pressure has stabilized Open 818-
U233VH266 fully and then slowly open 818-U233VH267 to complete supply and return loop. Verify there are no leaks
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 7 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 8 of 25
5. Liven Condensate Return from 818-U080 Skid. Remove lock and open Valve 818-U116VH113. Verify there are no leaks
6. Liven WBU Generation Supply to 818-U080 Skid. Verify that the Automatic Valve U080YV4098 is not isolated. This valve is automatic and will be used to
introduce water into the system when producing steam.
7. Liven Instrument Air to 818-U080 Skid. Verify that Valve 818-U020VH121 is unlocked and air can be introduced to skid.
8. Verify that Drain connection to 818-U080 is good and that there are no spools in place online to Wan tank
9. Liven D8 Steam to 818-U080 Skid. Unlock Valve 818-U101VH105. Slowly crack 818-U101VH105 open and allow line to fill with steam upto Valve 818-
U080YV2130. Verify there are no leaks.
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 8 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 9 of 25
PHASE 2 : Steam Generator Start-Up and Livening of the Steam Distribution (818-U081 DH3
This phase is the start-up of the steam generator and subsequent verification that the steam produced will livening safely and properly in the downstream
steam distribution header
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 9 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 10 of 25
7. DH3 Steam will be produced in the generator column (818-U080K10) and will be directed into the 818-U081 DH3 Distribution System. Steam will travel
as far 818-U081VH108 (Closed but not locked). Allow for Header to pressurize. The Setpoint of the Steam pressure produced by the DH3 Generator is
3bar. Verify the pressure on DeltaV on U080PC0020 and in the field on pressure gauge 818-U081PI101. Allow for pressure to stabilize before
proceeding . Note Condensate valve 818-U091VH112 may need to be pulsed open and closed to clear condensate. Verify that there are no leaks.
PHASE 3 : Livening of the Steam Distribution (818-U091 HVAC Steam (DH3) Distribution)
1. Only Proceed when the 818-U081 Header has stabilized at 3bar and all steps with Phase 2 have been completed. Have a member of team located at
level 2 where the riser is located with radio. They will verify that between level 1, 2 & 3 that there are no leaks on the riser when steam is introduced.
2. Verify the valve positions of the are correct as listed below
a. Open Valves: 818-U080VH103, 818-U080VH104, 818-U080VH101, 818-U080VH102, 818-U080VH106, 818-U080VH109, 818-U115VH126,
818-U116VH112, 818-U116VH113, 818-U081VH101, 818-U081VH102, 818-U081VH105, 818-U081VH107, 818-U081VH109, 818-U091VH112,
818-U091VH115, 818-U091VH117, 818-U091VH118, 818-U091VH116, 818-U091VH102, 818-U091VH103
b. Closed Valves : 818-U081VH103, 818-U081VH104, 818-U081VH106, 818-U081VH110, 818-U081VH108 (Valve will opened in next step of
Phase 3), 818-U091VH114, 818-U091VH113, 818-U091VH104, , 818-U091VH119, 818-U091VH101, 818-U091VH111, 818-U091VH106, 818-
U091VH110, 818-U091VH109, 818-U091VH105
3. Crack open 818-U081VH108 a little. This will allow steam to travel into 818-U091 HVAC Steam (DH3) Distribution. We should see a an immediate drop
in pressure on U080PC0020 and 818-U081PI101. Allow for the 818-U091 system to pressurize with steam. The system will pressurize until
U080PC0020 and 818-U081PI101 reach setpoint pressure of 3bar. During this time ensure there are no steam or condensate on 818-U091 Riser on
steam or condensate lines.
4. Once pressure has been achieved system can be considered in a live state. Note 818-U091VH116 and 818-U091VH103 may need to be pulsed opened
and closed to clear condensate.
5. Verify that condensate is returning to Condensate tank 818-U115B1
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 10 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 11 of 25
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 11 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 12 of 25
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 12 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 13 of 25
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 13 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 14 of 25
9. Consider the risk rating against the thresholds provided in the Overall Risk Ratings.
9.1. Very low and low risk ratings of 1-4. This level is generally considered acceptable provided that all control measures are applied.
9.2. Medium risk ratings of 5 -12. Additional control measures should be considered to determine whether it is practical to further reduce the risk further.
If additional control measures may be required, write them in the Control Measures column on the same line or a new line below. Rescore the
Severity, Likelihood, and Risk taking into consideration this additional corrective action.
9.3. High and Very High-risk ratings of 15-25. Additional control measures must be considered to determine whether it is practical to further reduce the
risk. If additional control measures will be implemented, write them in the Control Measures column on the same line or a new line below. Rescore
the Severity, Likelihood, and Risk taking into consideration this additional corrective action.
The main tool used for assessing risk in this system is a 5 x 5 matrix. The sides are labelled Severity x Likelihood as shown below.
2 4 6 8 10 2 = Unlikely 2 = First aid injury, less than 3 days absence Minor Disruption to service
Likelihood (L)
3 6 9 12 15 3 = Likely 3 = Minor injury, more than 3 days absence or Minor Delays to service
4 8 12 16 20 4 = Very Likely 4 = Major injury, long term absence or Major Delays to service
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 14 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 15 of 25
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 15 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 16 of 25
2. Manual 3 3 9 3 1 3
Handling :
Lifting, pushing,
carrying or
reaching with
lifting
equipment,
materials etc.
Personnel
3. Low pressure working in the
System live 4 3 12 LOTOTO the valves as per the LOTOTO plan. 4 1 4
system leaks area open a valve Install the system live signage
mistakenly
General Impact / manual Person Review access and movement of equipment/materials to required positions. Provide
commissioning handling / performing work temporary protection/padding if appropriate.
activities musculo–skeletal
4. injuries 3 3 9 Use mechanical handling devices if sensible/possible. 3 1 3
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 16 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 17 of 25
General Cuts and Person Avoid materials and components with sharp edges, corners etc where reasonably
commissioning abrasions performing work practicable.
activities
Wear appropriate gloves in accordance with site procedures.
5. 3 3 9 3 1 3
Sharp edges on
pipework,
equipment,
strainers,
flexible hoses,
gaskets etc.
General Pinching / Person Use suitable tools for prying apart flanges.
commissioning crushing of hands performing work
activities / fingers Take care not to insert fingers into trap zone.
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 17 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 18 of 25
General Incorrect use Person using tool Tools should only be used by competent persons.
commissioning causes physical
activities injury Ensure tools are in good condition prior to use.
7. 3 2 6 3 1 3
Use appropriate PPE.
Use of tools
General Inadequate Person Task lighting to be used if required
commissioning background and performing work
activities task lighting :
8. 3 3 9 3 1 3
slips, trips and
falls, physical
Available injury from task
lighting
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 18 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 19 of 25
General Falls from height Person(s) Access should be suitable for the task undertaken.
commissioning working at height
activities Preferred access is via static platforms (plant access platforms or
scaffolding) if available. If scaffolding, Scaff Tag should be checked
prior to use.
Working at If fixed access platform are not in place then task should be assessed to
height determine what access is suitable. See HSE guidance.
9. 4 3 12 Ladders/steps may be used for simple, short duration tasks, they should 4 1 4
be suitably secured and / or footed.
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 19 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 20 of 25
Opening of the High Pressure Personnel Opening process under RAMS & LOTOTO process.
tie-in Steam Steam Leak working in the Complementary PPE
valves area are exposed Walkie talkies
11. to live gases via Area is cleared prior to livening
system leak 4 3 12 4 1 4
Systems to be started up with professional personnel
(vendor)
Easy Access to E-Stop in the case of emergency
Opening of the High temperature Personnel Opening process under RAMS & LOTOTO process.
tie-in Steam of uninsulated working in the Complementary PPE
valves parts (steam area are exposed Walkie talkies
12. traps, valves) to steam traps 4 3 12 Area is cleared prior to livening 4 1 4
and valves which Insulation finished after livening
are hot but not Warning signs attached near uninsulated parts (stem traps)
insulated.
System is live High Pressure Personnel LOTOTO the valves as per the LOTOTO plan.
Steam Leaks working in the Install the system live signage at each user point
13. 4 3 12 4 1 4
area open a valve
mistakenly
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 20 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 21 of 25
14.
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 21 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 22 of 25
Hand
Overalls / Boots / Face
Protection / Safety Hearing
Protective Protective Shield / Respirator Hi-Vis Hard Hat Harness
Safety Glasses Protection
Clothing Footwear Mask
Gloves
☐ ☐ ☒ ☒ ☐ ☐ ☐ ☒ ☒ ☐
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 22 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 23 of 25
Permit Required
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 23 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 24 of 25
4.0 Training
Outline additional training requirements for the task, e.g. MEWP / Harness / Abrasive Wheels / Cartridge Tools / Confined Space Entry etc.
Training
Operative Name Training/Certificate Required Received
(Tick )
☐
☐
☐
☐
5.0 Emergency Arrangements
USE THE LONZA EMERGENCY PHONE NUMBER: +41 27 948 71 12. REGARDLESS OF SEVERITY, ALL ACCIDENTS ARE TO BE
REPORTED TO LONZA HSE IMMEDIATELY.
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 24 of 25.
Form & Checklist Doc.No CHVI-540318 Version 1.0
Effective since 12-Jun-2023 Replaces
Template CQV Method Statement - Risk Assessment Page 25 of 25
Document Mc4a_BACHTERA 818-080 DH3 Generator, 818-081 DH3 Distribution & Revision 0 Issue
20/Jul/2023
No.: 818-U091 HVAC Steam (DH3) Livening Plan - MSRA-07-09-2023 No.: 0 Date:
Page 25 of 25.