You are on page 1of 26

PROJECT TITTLE

PROPOSED F L E X I B L E RESIDENTIAL APARTMENT

BLOCK …D…. ON PLOTS …300… ALONG NEW BAGAMOYO ROAD

DAR ES SALAAM

CLIENT:
NATIONAL HOUSING CORPORATION
P O BOX 2977
DAR ES SALAAM

By:-Gogdfrey Mgaya
1: SITE MAPS AND LOCATIONS
LOCATION

N
- Site Location
: Victoria, Dar es Salaam, Tanzania

- Site Area
: 2065.475m2 SITE

-Charicteristics
: The site topography relative flat,
currently not developed. Site
Dar es salaam
1: SITE MAPS AND LOCATIONS
SITE LOCATION

THE SITE IS LOCATED


• 759.12m from Tigo Headquarters
•. 630.15m from Hubert Kairuki
Hospital.
•881.86m from Millennium Towers.
•1.4km from Airtel Headquarters.
•737.5m from Makumbusho
•388.86m from PEDF towers.

N
2: SITE BOUNDARIES AND REFERENCE POINTS
NEIGBHOURHOOD AND ACCESSIBILITY

The site located close to the New


Bagamoyo road, Filling station and
the road to Hubert Kairuki
Hospital, BMTL building/NBC bank.
which means the site well
accessible and close to services.

BMTL building/ NBC bank


3: VEGETATIONS AND PLANTATIONS

-Existing features on Site


-There is a very small vegetable
garden on site and a section where
There are bushes and small sized
trees along the site boundaries
-There are piles of aggregate and a
small corn farm.
4: SERVICES AND INFRASTRUCTURES

-Services
The site is surrounded with services
At all sides; Bagamoyo road, Filling
station and the road to Hubert
Kairuki Hospital, NMB bank. which
means the site well accessible and
close to services.
CLIMATIC ANALYSIS OF THE SITE

MACRO - CLIMATIC Sunshine


ANALYSIS Humidity
Wind speed
Precipitation
Rainy days
Temperature
W
a
t
e
r

t
e
m
p
e
r
a
t
u
r
e
This is the mean mDnrhly relative humidity

Humidity

Jan Feb Ma r Apr May Jun Jul .4ug Sep Cut Nov Etc

Average relative humidity in Dar Es Salaam. Tanzania Copyright 2015 '-•-+. 'other-and<Iimate.com

" ." ” AVERAGE WIND SPEED OVER THE YEAR

This is the mBan moFIthIy wind speed (meters per second)


tt”t :“''' ”• t””!,:I”, ”: This is the mean monthly precipitation, including rairt snow. hail etc. Show in Inches »

Precipitation

Jan FebMarApr MayJunJul AugSep Cut Nov Lee


AVERAGE MINIMU M AND MAXIMU M TEMPERATURE OVER THE YEAR
The monthly mean minimum and maximum daily temperature. Show in Fahrenheit »

40 °C
Max tern p
Mintemp
30 °C

% 20 °C

10 °C

0°C
Feb Jun Sip

Average min and max tern peratures in Ear Es Salaam, Tanzania Copyright @ 2015 www.wuther-and-climate

AVERAGE WATER TEMPERATURE OVER THE YEAR


The monthly mean water temperature. Show in Fahrenheit •
MICRO - CLIMATIC
ANALYSIS OF THE SITE
CLIMATIC ANALYSIS OF
THE SITE wind on

Wind pressure,
pattern and direction
nd on

Sun – path
( east to west)
CLIMATIC ANALYSIS OF
THE SITE

Annually sun-path

Annually sun-path
passes on top of the
site from east to
west
CLIMATIC ANALYSIS OF
THE SITE

Daily sun-path

Daily sun-path passes


on top of the site
from east to west
CLIMATIC ANALYSIS OF
THE SITE

Confortability

DB 24.4 c
Rh 26.9 %
Ah 5.2 g/kg
WB 13.4 C
SELECTED DESIGN STRATEGIES
 Passive solar heating
Thermal mass effects
Dehumification
Natural ventilation
 orientation of the building 12.5° from north
DESIGN RECOMMENDATIONS
 Construction materials:

 Suggested materials include glass, treated timber, cement


product, Bricks, stones, concrete, Gypsum, Steel

 beams, floors, columns should be able to resist fire for


not less than two hour

 Floor finishing materials include terrazzo, sand cement


screed, and tiles
Building layout and orientation on site:
Buildings will be organized to allow a clear air circulation and
natural light to every space. And oriented at an angle of 12.5°
from north
Roofs:
Fire resistant timber or steel trusses to be applied and tiles roof
covering material to control heat gain/lost
Climatic and environmental considerations:
Building elements like doors and windows should be positioned
to the building to encourage natural ventilation.
Also the use of shading device should be employed where
necessary
CASE
STUDIES
CASE STUDY SELECTED CASES

Hints:
 Site layout and planning

 Spatial planning treatment  GRIESHOFGASSE, by


HELMUT WIMMER
 Architectural concepts
 MAISON
 Room relationships and hierarchy
LOUCHEUR (1928-9)
 Building technology and

construction  VIVA
TOWER: Dar-
 Finishing materials and usage es-salaam

 Building grouping and


 KANCHANJUNGA
arrangements APARTMENTS: India

 Building forms and architectural

style.
CASE CASE STUDY and prototype design
STUDY
Case 1: GRIESHOFGASSE, by
HELMUT WIMMER
Grieshofgasse, by
Address: Helmut Wimmer

Work Type: new built

Context: urban

Number of
Storeys: 5-storey

Type of tenement / apartment


Building: house

Number of
9
Units:
Case 2:KANCHANJUNGA APARTMENTS

 The building have been planed in east


and west orientation..
 but orientation toward hot sun and
heavy rain, the orientation can be rotate
that may be give positive value.
 also the building have good access of
day light and breeze through terrace
garden and window the building have 4
different types of house, that is of
variations expressed externally by shear
end walls that hold up the cantilevers.
 The surfaces cut away to open up
double height terrace gardens at the
corners is the nice idea.
CASE CASE STUDY and prototype design
STUDY
Case 3: VIVA TOWER: A mixed used building found in Dar es salaam situated
near city center Posta and near another mixed use
this building is
building Uhuru heights along Bibi Titi road
located along the road
just as the proposed
site for the proposed
Victoria project at
Victoria.

viva towers has


parking spaces within
the building which
allow many of its users
to park their cars
Maison Loucheur (1928-9)

designed by Le Corbusier
A combination of folding
furniture and sliding walls
allows different configurations
for day and night.
Le Corbusier argues that the
purchaser is paying for 46m2
of space but through the
cleverness of the design is
actually getting 71m2 of
effective space.

You might also like