You are on page 1of 3

CORRECTIVE ACTION PLAN

EXCETAILORING VIET NAM CO., LTD


RECOMMENDATIONS COMMENTS
NO RESPONSIBLE PERSON CORRECTTIVE ACTION CLOSSING DATE

1. BEFORE START SEWING CHECK THE MACHINE AND EVERY HOUR


TECHNICAL CHECK THE MACHINE.
1 VISIBLE FELLING HEM ON FRONT LINE TECHNICAL, QC END LINE 5-Mar
2. TRAINING QC STAFF TO CHECK 100% CAREFULLY ON THE TABLE
AND HANGING

1. BEFORE START WORKING CHECK THE TENSION OF ALL


MACHINES
2. CHECK SLEEVE ATTACHING OPERATORS TO FOLLOW TOP,
BOTTOM AND SIDE KNOTCHES AND EVERY HOUR. TECHNICAL LINE
PUCKERING ON ARM HOLE AND BODY
2 AREA LINE SUPER, TECHNICAL LINE & QC FOLLOW UP AND CHECKING 5-Mar
3. INLINE PREESING MORE CAREFULLY AND HOURLY TECHNICAL IN
LINE FOLLOW UP TO CHECK
4. TRAINING QC STAFF TO CHECK CAREFULLY MORE AREA
IMPORTANT

1. ARRANGE APPROVE FABRIC SWATCH, END LINE AND PACKING


3 TWO SHADS IN ONE BUNDLE END LINE QC, PACKING QC QC MUST BE CHECK WITH THE APPROVE SWATCH. MAKE SURE IN 5-Mar
ONE BUNDLE MUST BE ONE SHAD

1. IMPROVE THE PRESSING QUALITY AND STORE PROPERLY AFTER


PRESSING MANAGER, PACKING FINISH GARMENTS NOT TO HANG TOO TIGHT IN THE RACKS
4 CRUSH DURRING THE TRANSPORT 5-Mar
MANAGER, WARE HOUSE MANGER 2. DURING THE LOADING CONTAINER CHECK THE QUANTITY TO
ADVOID THE CRUCHING AND HANGING MORE CAREFULLY
1. . QC FABRIC NEED TO CHECK CAREFULLY AND REPORT ABOUT
QUALTY OF FABRIC
2. CLEANING THE MACHINE BEFORE START TO PRODUCE
FABRIC TEAM, QC TEAM, LINE AND
5 DIRTY GARMENTS 3. QC INLINE NEED CHECKING CAREFULLY IF FIND OUT DIRTY 5-Mar
PACKING TEAM
GARMENTS MUST BE CLEANING
4. PACKING TEAM MUST BE CLEAN THE GARMENTS BEFORE PACK
POLY BAG

`
#NAME?