This corrective action plan from ExcetaiLoring Viet Nam Co., Ltd contains recommendations to address quality issues with their garment production. It lists five issues: visible felling hem on fronts, puckering on armholes and body areas, two different shades in one bundle, crushing during transport, and dirty garments. For each issue, it identifies responsible personnel and corrective actions to implement with closing dates of March 5th. The plan aims to improve machine checking, operator training, quality control inspection, pressing, and cleaning procedures.
This corrective action plan from ExcetaiLoring Viet Nam Co., Ltd contains recommendations to address quality issues with their garment production. It lists five issues: visible felling hem on fronts, puckering on armholes and body areas, two different shades in one bundle, crushing during transport, and dirty garments. For each issue, it identifies responsible personnel and corrective actions to implement with closing dates of March 5th. The plan aims to improve machine checking, operator training, quality control inspection, pressing, and cleaning procedures.
This corrective action plan from ExcetaiLoring Viet Nam Co., Ltd contains recommendations to address quality issues with their garment production. It lists five issues: visible felling hem on fronts, puckering on armholes and body areas, two different shades in one bundle, crushing during transport, and dirty garments. For each issue, it identifies responsible personnel and corrective actions to implement with closing dates of March 5th. The plan aims to improve machine checking, operator training, quality control inspection, pressing, and cleaning procedures.
RECOMMENDATIONS COMMENTS NO RESPONSIBLE PERSON CORRECTTIVE ACTION CLOSSING DATE
1. BEFORE START SEWING CHECK THE MACHINE AND EVERY HOUR
TECHNICAL CHECK THE MACHINE. 1 VISIBLE FELLING HEM ON FRONT LINE TECHNICAL, QC END LINE 5-Mar 2. TRAINING QC STAFF TO CHECK 100% CAREFULLY ON THE TABLE AND HANGING
1. BEFORE START WORKING CHECK THE TENSION OF ALL
MACHINES 2. CHECK SLEEVE ATTACHING OPERATORS TO FOLLOW TOP, BOTTOM AND SIDE KNOTCHES AND EVERY HOUR. TECHNICAL LINE PUCKERING ON ARM HOLE AND BODY 2 AREA LINE SUPER, TECHNICAL LINE & QC FOLLOW UP AND CHECKING 5-Mar 3. INLINE PREESING MORE CAREFULLY AND HOURLY TECHNICAL IN LINE FOLLOW UP TO CHECK 4. TRAINING QC STAFF TO CHECK CAREFULLY MORE AREA IMPORTANT
1. ARRANGE APPROVE FABRIC SWATCH, END LINE AND PACKING
3 TWO SHADS IN ONE BUNDLE END LINE QC, PACKING QC QC MUST BE CHECK WITH THE APPROVE SWATCH. MAKE SURE IN 5-Mar ONE BUNDLE MUST BE ONE SHAD
1. IMPROVE THE PRESSING QUALITY AND STORE PROPERLY AFTER
PRESSING MANAGER, PACKING FINISH GARMENTS NOT TO HANG TOO TIGHT IN THE RACKS 4 CRUSH DURRING THE TRANSPORT 5-Mar MANAGER, WARE HOUSE MANGER 2. DURING THE LOADING CONTAINER CHECK THE QUANTITY TO ADVOID THE CRUCHING AND HANGING MORE CAREFULLY 1. . QC FABRIC NEED TO CHECK CAREFULLY AND REPORT ABOUT QUALTY OF FABRIC 2. CLEANING THE MACHINE BEFORE START TO PRODUCE FABRIC TEAM, QC TEAM, LINE AND 5 DIRTY GARMENTS 3. QC INLINE NEED CHECKING CAREFULLY IF FIND OUT DIRTY 5-Mar PACKING TEAM GARMENTS MUST BE CLEANING 4. PACKING TEAM MUST BE CLEAN THE GARMENTS BEFORE PACK POLY BAG