You are on page 1of 6

Engineering, Procurement and Construction

(EPC) for New Nassiriya Depot

REQUEST FOR INSPECTION


Request No.:CPP-W0285-2021 Inspection Date/Time: 2021-04-29

□Raw Material Receive □Raw Material Sample


Scope of Inspection
□Worksite Sample █Worksite Activities Witness

█Civil □Steel Structure □Architect □Mechanical


Zone □Pipeline/Piping □Painting/Coating □Equipment Installation
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot

□Electrical □Instrument □Other


Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot

The Contractor has completed the steel bar work of the roof for lodge building B (7-persons).

Employer is kindly request to check and witness this all site activities.

Reference: 5431/1-CPP-100-CS-DD-020

Location: lodge building for 7 persons (B). (gas turbine generator area)
Description Time: 10:30 am 01st, May.2021

Witness and Coordinator: CPP

Witness: SCOP
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot

Applicant Date 2021-04-29

Result □Acceptance □Acceptance with comments □Rejected


Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot

Comments

Employer Third Party Agency/QC Supervisor

Signature: Signature:
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot

Date: Date: