You are on page 1of 4

TECHNICAL QUERY

Ajaokuta Kaduna Kano Gas Pipeline Project

TQ No.: 10481-TQ-OSL-NETCO-ILF-0104 TQ title: PREVAILING WIND DIRECTION FOR BVS


STATIONS
To : NETCO From : Oilserv Discipline: Reply requested by Date:
Piping 05/03/2021

TQ Date: 03/03/2021 Refer Docs:

No. of Predecessor-TQ: (if unsolved prior TQ)


TECHNICAL QUERY
Ajaokuta Kaduna Kano Gas Pipeline Project

TQ No.: 10481-TQ-OSL-NETCO-ILF-0104 TQ title: PREVAILING WIND DIRECTION FOR BVS


STATIONS
To : NETCO From : Oilserv Discipline: Reply requested by Date:
Piping 05/03/2021

Subject:

Following alignment between PMC and EPC on the prevailing wind directions for Block Valve Stations, EPC
has generated a summarized prevailing wind direction table to be used go forward for the AKK project.
TECHNICAL QUERY
Ajaokuta Kaduna Kano Gas Pipeline Project

TQ No.: 10481-TQ-OSL-NETCO-ILF-0104 TQ title: PREVAILING WIND DIRECTION FOR BVS


STATIONS
To : NETCO From : Oilserv Discipline: Reply requested by Date:
Piping 05/03/2021

Reason

This TQ is requesting PMC to approve the following wind directions in the BVS Plot Plans as tabulated
herein. This may necessitate re-orientation of some of the BVS Stations.

Estimation of potential Impact


I Technical Integrity & Reliability ☐Negative ☒ Positive ☐ None
II Health & Safety ☐ Negative ☒ Positive ☐ None
III Environment ☐ Negative ☒ Positive ☐ None
IV Quality ☐ Negative ☒ Positive ☐ None
V Scope ☐ Negative ☒ Positive ☐ None
VI Cost ☐ Negative ☒ Positive ☐ None
VII Schedule ☐ Negative ☒ Positive ☐ None
VIII Fabrication / constructability ☐ Negative ☒ Positive ☐ None
IX Operation and Maintenance ☐ Negative ☒ Positive ☐ None
X Total Life Cycle Project Value ☐ Negative ☐ Positive ☐ None
XI Regulatory approvals requirements ☐ Negative ☐ Positive ☐ None
XII Contractual (Technical Deviation or Change) ☐ No ☐ Yes ☒ Not known

Attachments:

Prepared by: Emeka Nwachukwu Signature: ENW Date: 03/03/2021

Approved by: Charles Nwokoye Signature: Date: 03/03/2021


TECHNICAL QUERY
Ajaokuta Kaduna Kano Gas Pipeline Project

TQ No.: 10481-TQ-OSL-NETCO-ILF-0104 TQ title: PREVAILING WIND DIRECTION FOR BVS


STATIONS
To : NETCO From : Oilserv Discipline: Reply requested by Date:
Piping 05/03/2021

Answer from OWNER:

EPC Contractor’s proposal is approved, however, distance from BVS 12 to TGS Kaduna is roughly 100 km while
the distance from BVS12 to Abuja IPS is only 85 km (approximately). Hence for BVS12 “West” shall be used for
the prevailing wind direction as it is closed to Abuja IPS.

Discipline Lead: Lecky Nkechinye Signature : Date : 04.03.2021

Engineering Mngmt: Daniel Fürtbauer Signature : Date : 04.03.2021

Approved: ☐ Adaption to Documents / Drawings

Rejected: ☐ Required: ☐ Yes ☐ No

Signed by PMC:
Details on Rejection:

Documents / Drawings to be adapted:

Signed by OWNER:

Date: