Technical Query (TQ) No.

UBFM/MRCSB/TQ/010
Technical Query
Date of TQ issued
6 April 2022

Project and Client Details


Owner Malaysian Refining Drawing No. / Repair UBFM-MRCSB-QAQC-
Company Sdn. Bhd. Procedure MSA-RP-2022-019
Pipe Line No. 3/4"-PG290371-1105Z-PP Priority ☐ P1 ☐ P2 ☒ P3
Equipment No. N/A Area/Unit No. 2B/29
Project Description To replace spool at 3/4"-PG290371-1105Z-PP
Project Name Master Service Agreement (MSA) For Integrated Turnaround Main Mechanical &
Maintenance Mechanical Static (TA4MS) At Malaysian Refining Company Sdn. Bhd.

Person to Contact
Name: Shim Wen Yen Title: Mechanical Static Phone/Email:
Technical Query Details
☐ Drawing ☒ Design ☒ Others
☒ Fabrication ☒ Material The existing spool has
☐ Painting ☐ Packing weld-to-weld distance of <50mm
☐ Marking ☐ Transportation
☐ Erection ☐ System
Description of Technical Query
During the fit-up activity to replace the valve, found that the valve weld joint will have a weld-to-weld distance of
less than 50mm as per the minimum requirement.

The existing spool was welded in a similar condition.

Permission from the owner is required if this condition is acceptable to proceed with the weld.

Refer to the next page for more details.

Response/Recommendation
Describe here: Responsible Party (UBFM/Owner)

Technical Query Status

☐ TQ Accepted ☐ TQ Accepted with Condition ☐ TQ Rejected

Prepared by: Reviewed by: Approved by:


(Contractor Quality Engineer)
 
 

Remark:

Technical Query UBFM_QMS