Request Information
Title: Coating for Stainless Steel Splash Zone Request # 4043448466
Requester Name: Requester Org: Request Date:
Shivputtrayya Manjunath Math (MATHSM) Hook-Up/Tie-in Div ( 30027110)
Current Responsible Employee : Status: Current Step:
Ghalib Mughram Al Houtan (HOUTANGM) Survey Completed Request QA and Closure
Details
Main Information
Field Name Selected Value(s)
Equipment Number OFFSHORE PROJECT DEPARTMENT
ES Department Consulting Services Department
Plant Number OFFSHORE PROJECT DEPARTMENT
Please specify if this is a PMT No
request
Priority High (Division Head#s approval )
Assigned Group CP, Coating
Service Type Materials Engineering
Notes
Justification:
On behalf of Offshore Project Department (OPD) and Hook-up and Tie-in
Division (HTD), I hereby submit my write-up to seek, clarification on
what coating system needs to be applied for Stainless Steel (Piping
Spools or Structural Steel Structures), if those falls under splash
zone.
Per the definition of Splash Zone taken from SAES-H-004 Edition Dec 23,
2018 it reads as below.
***** Splash Zone (for jacket legs and other members, conductors and
risers and piles exposed to sea water): Splash zone shall be considered
to extend from -2.41 to +4.91 m. (relative to Lowest Astronomical Tide
(LAT)). In case the first flange of the riser is below +4.91 m., the
level of first flange shall be considered as upper limit of splash zone
for the riser.*****
Let me present the case to CSD team by attached Zuluf-5 drawing related
to one (1) inch stainless steel line. Where we are supposed to install
and drain line at minimum elevation of +4120 mm (refer attached Drawing
RB-600625 Sht. No. 001, Rev. No. 00).
Request Information
Title: Coating for Stainless Steel Splash Zone Request # 4043448466
Requester Name: Requester Org: Request Date:
Shivputtrayya Manjunath Math (MATHSM) Hook-Up/Tie-in Div ( 30027110)
Current Responsible Employee : Status: Current Step:
Ghalib Mughram Al Houtan (HOUTANGM) Survey Completed Request QA and Closure
Remark: I had attached, AkzoNobel Letter Dated Dec 23, 2020 for
Application of APCS-19C Interzone 1000 over Stainless Steel (SST).
Request Information
Title: Coating for Stainless Steel Splash Zone Request # 4043448466
Requester Name: Requester Org: Request Date:
Shivputtrayya Manjunath Math (MATHSM) Hook-Up/Tie-in Div ( 30027110)
Current Responsible Employee : Status: Current Step:
Ghalib Mughram Al Houtan (HOUTANGM) Survey Completed Request QA and Closure
Manjunath. Math.
SAPMT Project Quality Manager (OPD/HTD/MPP),
DPC-811, Tanajib.
Desk Phone: 013-378 9225
GSM: +966-500979939.
Recommendation:
For external coatings of Stainless Steel drain lines utilize APCS-19C in
splash zone area and APCS-1B or APCS-22A (If Sigma product utilized) on
the atmospheric zone area. Provide an overlap of 2 to 3 inches with
featheredging the coating for good adhesion between the two coating
systems. Utilize non metallic abrasives (eg. Garnet) for surface
preparation of Stainless steel surface.
Log:
Note
01/06/2021 07:52:23 HOUTANGM
As Requested
Auto Approvals
Agent Title Agent Name Agent Position Title Status Status Date
Approver Ahmed Faraj Al Ghamdi Acting as - Project Manager Completed 12/24/2020