Engineering, Procurement and Construction

(EPC) for New Nassiriya Depot

INSPECTION ORDER

No CGC-S0038-2020
Inspection Date/Time: 2020-04-02

Item □Raw Material Sample █Worksite Sample

□Cement □Sand □Aggregate □Steel Bar □Water


Zone
█Concrete □Brick □Mortar
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot

The 28 day's compression test for concrete cube specimen shall be done (Prepared:5 th March. 2020)

Concrete grade: C10

Pieces:1 sets (3 pieces of cubic for each set)

Worksite report or record shall be filled.


Description
Helper: worksite team (CGC)

Operator: worksite lab (C.L.E.C.B)

Witness/Coordinator: CPP
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot

Applicant Date 2020-04-02

QA/QC Date

Lab Date

Result □Acceptance □Acceptance with comments □Rejected


Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot

Comments NA-21-V-02 & NA-05-TK-03

CPP Third Party Agency/QC Supervisor

Signature: Signature:
Engineering, Procurement and Construction
(EPC) for New Nassiriya Depot

Date: Date: