BOP HOISTING ACCEPTANCE METHOD
Pág. 1 de 3
Manufacturer: Type:
Serial No:
Rig Name
Accepted
by:
Date:
ACCEPTANCE METHOD
Check that the Safe Working Load is clearly marked on the Triangular plate of
2.4 each winch.
Comment:
2.5 Check that stoppers are installed on the Trolley beams to stop the trolley
Check that the weights of the control hoses to the remote are well supported, and
2.6
that there is no weight on the fittings.
2.7 Check the hydraulic pressure supply hoses to the BOP trolleys.
Check the condition of the wire , and make sure there are no kinks or
2.8 broken strands
2.9 Verify that all air has been bleed out of the system.
Check that all pins holding the BOP trolley beams in position have got safety pins
2.10
installed on both sides
Sistema Integrado de Gestão de Saúde, Segurança, Meio Ambiente, Qualidade e Responsabilidade Social - IMS Pág. 1 de 3
FORMULÁRIO FORM-126-COM
Setembro/17
BOP HOISTING ACCEPTANCE METHOD
Pág. 2 de 3
by:Accepted
Date:
ACCEPTANCE METHOD
3.1
3.2
Simulate lifting a load to the maximum position and lowering the load by
4.2
extending and retracting the main cylinder to its extremes
Hook up the BOP load and pick up off the ground 3 inches. Try to move the
4.3 trolley forward
Comment:
4.4 Check the overhead trolley beam for signs of deflection or bending.
Sistema Integrado de Gestão de Saúde, Segurança, Meio Ambiente, Qualidade e Responsabilidade Social - IMS Pág. 2 de 3
Accepted
by:
Date:
ACCEPTANCE METHOD
5.1
5.2
5.3