FORMULÁRIO FORM-126-COM

Setembro/17
BOP HOISTING ACCEPTANCE METHOD
Pág. 1 de 3

Description: BOP Hoisting (Beam Test)

Manufacturer: Type:

Serial No:
Rig Name

Accepted
by:

Date:
ACCEPTANCE METHOD

1.0 Documentation, Certification and Performance Data


Review the manufacturer’s documentation & equipment data.
1.1
Check that all relevant instruction manuals, workshop manuals and spare parts
1.2 manuals are available at rig site location.
COMMENT :
2.0 Mechanical Installation Verification
Ensure all safety risks have been identified and control measures are in place. This
2.1 may include but is not limited to JSA, correct PPE, lock out /
tag out, work permits, safety barriers etc.
Check that the BOP remote controls are working & automatically return to neutral
2.2
when released.
Typically the rig should carry out a static load test to 125% of the SWL. In
addition a brake performance test at 100% SWL while stopping the BOP load 3
2.3 times during lowering is acceptable.
Comment:

Check that the Safe Working Load is clearly marked on the Triangular plate of
2.4 each winch.
Comment:
2.5 Check that stoppers are installed on the Trolley beams to stop the trolley
Check that the weights of the control hoses to the remote are well supported, and
2.6
that there is no weight on the fittings.
2.7 Check the hydraulic pressure supply hoses to the BOP trolleys.
Check the condition of the wire , and make sure there are no kinks or
2.8 broken strands
2.9 Verify that all air has been bleed out of the system.
Check that all pins holding the BOP trolley beams in position have got safety pins
2.10
installed on both sides

Sistema Integrado de Gestão de Saúde, Segurança, Meio Ambiente, Qualidade e Responsabilidade Social - IMS Pág. 1 de 3
FORMULÁRIO FORM-126-COM
Setembro/17
BOP HOISTING ACCEPTANCE METHOD
Pág. 2 de 3

by:Accepted

Date:
ACCEPTANCE METHOD

3.0 Maintenance and Repair Equipment Assessment


3.1 Equipment Fail Description

3.1

3.2 Recommended Corrective Maintenance

3.2

3.3 Comments on Maintenance

4.0 Performance Acceptance Testing


Operate the BOP winch trolley to both the extreme travel points along the beam.
4.1 Ensure that both trolleys move in unison.
Comment:

Simulate lifting a load to the maximum position and lowering the load by
4.2
extending and retracting the main cylinder to its extremes
Hook up the BOP load and pick up off the ground 3 inches. Try to move the
4.3 trolley forward
Comment:

4.4 Check the overhead trolley beam for signs of deflection or bending.

Sistema Integrado de Gestão de Saúde, Segurança, Meio Ambiente, Qualidade e Responsabilidade Social - IMS Pág. 2 de 3
Accepted
by:

Date:
ACCEPTANCE METHOD

5.0 Comments & Remarks

5.1

5.2
5.3

6.0 Sign off