NORTH - SOUTH COMMUTER RAILWAY (NSCR) PROJECT (MALOLOS - TUTUBAN)

INSPECTION RECORD FOR


REINFORCING STEEL WORK

Project Name: CP01: Elevated Structures 6 Stations And Depot MS/ITP Ref. No. :
Contractor: TAISEI-DMCI Joint Venture Rev. :
Location: Level:
Date of Inspection:
Drawing Ref. No:
Structure Component
󠄀Viaduct󠄀 󠄀󠄀Bridge 󠄀Embankment 󠄀Station 󠄀Depot 󠄀Others
󠄀Pilecap 󠄀Cable Trough 󠄀Side Wall 󠄀Pilecap 󠄀 󠄀Wall 󠄀 󠄀Pilecap 󠄀 󠄀Wall 󠄀 󠄀
󠄀Pier Column 󠄀Abutment 󠄀 󠄀Cushion Slab 󠄀Footing 󠄀Stair 󠄀Footing 󠄀Stair
󠄀Pier Head 󠄀Parapet Wall 󠄀Face Wall 󠄀Column 󠄀Column
󠄀RC Girder 󠄀Cable Trough 󠄀Beam 󠄀Beam
󠄀PC Girder 󠄀Box Culvert 󠄀Slab 󠄀Slab

Check Item Description Acceptance Criteria TDJV NSTRen Remarks

1) ϕ, @ mm, nos. TS207/TS403


Main Bar and Spacing 2) ϕ, @ mm, nos. TS207/TS403

3) ϕ, @ mm, nos. TS207/TS403

4) ϕ, @ mm, nos. TS207/TS403


Secondary Bar and TS207/TS403
Spacing 5) ϕ, @ mm, nos.
6) ϕ, @ mm, nos. TS207/TS403

7) ϕ, @ mm, nos. TS207/TS403


Stirrup/Loop 8) ϕ, @ mm, nos. TS207/TS403

9) ϕ, @ mm, nos. TS207/TS403

10) ϕ, @ mm, nos. TS207/TS403


Rebar Lapping
11) ϕ, @ mm, nos. TS207/TS403

12) nos. , ϕ TS207/TS403


Splice/Coupler 13) Torque test and protection measure Refer to test report
14) Splice/Coupler staggered TS207/TS403
Anchorage 15) Anchor Length mm TS207/TS403
Concrete Cover 16) Cover: mm TS207/TS403
Spacer 17) Material: , Size: mm TS403.2.11
Embedded Items 18) Embedded items installed Refer to CSD/SEM
19) Free from dirt, loose rust or scale, mortar, paint, grease,
Cleanness oil, or other nonmetallic coatings. TS207.5
Comments / Actions required:
Non-conformance raised? No 󠄀󠄀 Yes 󠄀󠄀 Ref. No :

Stop Work Order raised? No 󠄀󠄀 Yes 󠄀󠄀 Ref. No :


All activities and records/documents completed are satisfactory? Yes 󠄀 󠄀󠄀 No 󠄀 󠄀󠄀 Billing Quantity: kg, Grade
Supporting records/documents attached. Yes 󠄀 󠄀󠄀 No 󠄀 󠄀󠄀 BOQ Item No.: 󠄀
Prepared Signature over printed name/
Date/Time
by: TDJV SE
Concurred Signature over printed name/
Date/Time
by: TDJV CM
Checked Signature over printed name/
Date/Time
by: TDJV QC Engineer
Approved Signature over printed name/
Date/Time
by: NSTRen

Construction Management Plan Page 1 of 1 Form Code:CMP-RSW Rev.0


Revision Date: 19/06/2019